OBJECTIVE:

Executive level Oil, Energy & Gas management professional seeks a leadership role which will utilize my 2 decades of in-depth knowledge and expertise to be a valuable addition to a company that allows room for growth.

QUALIFICATIONS:

20+ years of Oil, Energy & Gas experience with a focus in project coordination which includes, but is not limited to the turnaround, shutdown,Pre-Commissioning, Commissioning & Start Up and all planning/scheduling from start to execution.

Knowledgeable in the supervision of civil, mechanical and I&E works, maintenance and project cost control as well as reporting skills.

SucSuccessfully manage numerous project management plans which include the execution, controlling all faucets of the project with an analytical eye, overseeing my team to ensure that the tasks assigned to them were performed correctly, safely and efficiently.

AbilityAbAbility to communicate with various types of people and personalities calmly and efficiently as a result providing me strong leadership skills and cultivating new client relationships.

FlexFFFlexible team player who thrives in environments requiring the ability to prioritize concurrent projects.

Fluent in English and Spanish.

TECHNICAL SKILLS:

Oracle Primavera P6 Professional Project Management.

Microsoft Project, Microsoft Office, Microsoft Excel and Microsoft Word.

Primavera P3, P6, QTRACK. Project for Windows, CCMS, WINPCS.

PROFESSIONAL BACKGROUND:

01/2015-10/2015: Project Control Planner and Scheduler PC& S KENTZ, SNC Group

Performing the planning/scheduling for Pre-commissioning, commissioning and start up Block 3 Unit 100&101 Sutured Gas & Vacuum Crude for the Cartagena Refinery Expansion

01/2014-12/2014: Project Control Planner and Scheduler CBI, Columbiana

Performed the planning/scheduling as Block C for the Cartagena Refinery Expansion Project I which had 139 unit Electrical Distribution System.

Oversaw the complete development with multiple sub-contractors to ensure WBS and the coding alignment within the Master EPC schedule as well as the Systems Completion Schedule while putting together the subcontractor schedules weekly.

Interface with the CBI planning/scheduling manager; creating histograms and S-Curves for PMT.

07/2012-01/2014: Project Control Manager SPT/ABPI

Successfully completed the Venezuela RPLC Deep Conversion Project/EW.0.1.1 in which I utilized the latest project planning/scheduling tools (Primavera), directed staff on the preparation of planning/scheduling control systems and enforced all safety procedures.

Provided feedback/project status with an analytical eye in which I thoroughly looked at the index of productivity, efficiency and variance during the EPC of the latest gas plant project.

09/2009-06/2012: Construction Manager Concimeca Corpoelec/PDVSA

Supervised a civil engineering project and balance of plant construction (BOP) for the installation of 150 MW per turbo generators.

This civil engineering project in particular was located at the “Alberto Lovera” Power Plant at the Puerto la Cruz Oil Refinery in Venezuela.

02/2007-01/2009: Operations Manager Consorcio Pc De Paraguana

Responsible for all of the daily business operations to ensure everything was running smoothly which included bid preparation, contract follow up as well as the master/detail plan preparation (P3).

Handled the project control system invoicing, the follow up of assigned industrial and environmental projects.

06/2005-01/2007: Planning Coordinator Coinpla & PCI Consultant Engineers

Performed the shutdowns and maintenance of boilers (F-102).

Coordinated unit plants including the general maintenance AV3/CD3, HDAY-2, FMAY-2, Catalytic, Flare 5, Alkylation-2 and HYAY-1.

11/2003-04/2005: Lead Planner Ingramelca- Major Repair Projects I & C PDVSA

Performed the shutdowns and maintenance of boilers such as F-103, F-106 and Caldera 2, 7, 8 and handled plants including CCU, ALK-1/2, MTBE/TAME, lubricants as well as Plant #5, SUAY-1, FKAY/LFAY, HDAY-3CRP and AMUAY-Cardon.

Fully designed the work plan for E&I which included various faucets such as generating reports that were utilized for the monitoring/progress in field, tracked inspection notes, analyzed the status of all plan activities to correct deviations as needed in the overall shutdowns and maintenance of CRP Cardon.

01/2000-10/2003: Progress Recorder, Planner and Quantity Surveyor Assistant

Companies: Setica, Opedi, C.A., Petroadvance, Alvica Group, UPR, Foster Wheeler Corporation

EDUCATION & COURSES:

IT Technician Certification

Institute of Technology, Falcon, Venezuela

Degree in Technical Civil Construction:

I.U.T.A.G University, Calle Las Acacias Coro, Falcon Venezuela

Primavera Project Planner courses

(P3, P6 R8.3, Project for Windows, Excel, Oracle SQL, SAP and QTRACK)