TIMOTHY S WISDA
EMAIL: ********@*****.*** PH# 928-***-****
JM ELECTRICIAN EXP. WITH HEAVY INDUSTRIAL,COMMERCIAL
20YRS EXP IN TRADES
EXPRENCE & WORK HISTORY
MMR INC 15961 AIRLINE HWY BATON ROUGE, LA 70817
JM ELECTRICIAN STARTED JULY 2015 PROJECT IOWA FERTILIZER PLANT(WEVER)
I WAS LEAD ELECTRICIAN FOR THE FORMAN I WORKED UNDER, MOST OF MY WORK ENTAILED RESEARCH AND LAYOUT FOR POWER AND INSTRUMENTS.ON THIS SITE I ONLY WORKED ON THE MECHANICS OF ELECTRICIAL WITH THE EXCEIPTION OF LIGHTS IN AREA ASSIGNED. FOREMAN WAS HELAIO CORONADO 281-***-**** PERSONAL CELL
FAGEN INC. 501 WEST HWY 212,PO BOX 159 GRANITE FALLS, MN 56241320-***-****
JM ELECTRICIAN STARTED MARCH 2014 TO APRIL 2015/ PROJECT BLACKHAWK CELLUOSTIC ETHONAL
DURING THE TIME WORKED AT NEVEDA SITE I TERMINATED MOTORS & E-STOP BUTTONS IN THE FIELD THEN THE MCC. ALSO WORKED IN LAB/MAIN CONTROL ROOM INSTALLED CABLE TRAY, PULLED INTERCONECT CABLES FOR SERVERS IN MAIN SERVER ROOM AND TERMINATED ALL THE CAT5 THEN USED A CABLE MAPPER TO CHECK CONNECTIONS. ALSO WORKED ON PROFIBUS SYSTEM FOR THE FIELD SIDE TOOK A BIT KNOWAGE IN ORDER TO LOCATE INSTRUMENTS . FOREMAN TIMOTHY BOOTH
FAGEN INC.
JM ELECTRICIAN STARTED MARCH 2013 TO SEPT 2013 PROJECT KENISTON NATURAL GAS PLANT
I WAS PLACED ON SITE GROUNDING CREW I WOULD LAYOUT ATTACHMENT POINTS, TRENCHING,
TEST WELLS, AND PLACE GROUND RODS WHERE REQUIRED. ALSO INSTALLED ESD SYSTEM IN MAIN COMPRESSOR BUILDING AND COMMISSIONED ESD SYSTEM WITH MANUFACTORS REP.
FOREMAN DAN LAMBERT 319-***-**** CELL
THE INDUSTRIAL COMPANY PROJECT PISMO BEACH WATER TREATMENT
BAKERSFEILD,CA PLANT MY DUTIES ON THIS SITE WERE TO INSTALL CONDUIT, CABLE TRAY, PULL WIRE. THE SITE IS ON AN ACTIVE OIL FIELD SO H2S WAS PRESENT AT TIMES UPTO 10000 PPM.
HELIX ELECTRIC MUTIBLE PROJECTS WORKED
LAS VAGAS,NV
JM ELECTRICIAN SEPT 2009 TO AUGUST 2012
FOR HELIX ELECTRIC I WORKED ON 290 MEGAWATT SOLOR PROJECT IN WHICH I INSTALLED GROUND WIRE WITH CADWELD JOINTS, RAN THE HARNESSES FOR PANELS ABOVE AND UNDERGROUND, INSTALLED COMBINER PANELS, PULLED FEEDER CABLES TO INVERTER BUILDINGS FROM COMBINER PANELS. ALSO WORKED ON NEW JAIL FOR KINGMAN AZ WHICH INCLUDED KITCHEN, TEN ROOM SICK BAY JUDGES CHAMBERS,AND OFFICE AREA.
HR 702-***-****
RDM ELECTRIC PROJECT PALM DESERT SCHOOL #12
CHINO CA
JM ELECTRICIAN JUNE 2009 TO SEPTEMBER 2009
ON THE SCHOOL PROJECT I WORKED ON KICHEN WARMERS FREEZERS AND ANSAL SYSTEM.
FOREMAN RICHARD DUGAN 909-***-****
COVE ELECTRIC MUTIBLE PROJECTS WORKED
PALM DESERT,CA
JM ELECTRICIAN DECEMBER 2008 TO JUNE 2009
FOR THIS COMPANY WE STARTED OF A JOB SO WORKED ON A LOT OF PREFAB FOR DEVICE BOXES THAT WENT IN BLOCK WALLS INSTALLED UNDERGROUND CONDUIT FOR GENERATOR AND MAIN ELECTRICAL ROOM,INSTALLED UNDERGROUND CONDUIT FOR NURSES STATIONS.ALSO WORKEDON ADDITION TO 29 PALMS CASINO MAIN TASK I WORKED WAS HERMONIC FILTER TRANSFORMERS THEY WERE 480 DELTA TWO 120/208 WYE SUPRVISER CORY BLACKBURN PHONE 760-***-****
SCHMUESER & ASSOCIATES INC PROJECT MEACATOR MINERALS CHRUSHER AND
JM ELECTRICIAN MAY 2008 TO NOVEMBER 2008 PROCESSING PLANT,WATER TREATMENT
THE CREW I WAS ON STARTED AND COMPLETED THE FIRST STAGE ROCK CRUSHER AND CONVEYOR THIS INCLUDED 1 13800 CIRCUIT AND TWO 4160 CIRCUTS FOR CONVEYOR DRIVE MOTORS INSTALLED LIGHTING SAFETY PULL CORDS ALONG CONVEYOR AND THE FEW OTHER INSTRMENTS NEEDED FOR SPEED AND OVER FLOW.
DELTA DIVERSIFIED MUTIBLE PROJECTS CANTEX PVC EXTRUSION
JM ELECTRICIAN JUNE 2007 TO MAY 2008 PLANT AND INTERNATIONAL GAMING TECHNOLOGY
WEARHOUSE AND OFFICE BUILDING
SCOPE OF WORK FOR CANTEX BUILDING ONLY INCLUDED THE SHELL WITH OFFICE SPACE AND SITE LIGHTING (EVERY THING EXEPT FOR PROCESSING THE PVC). THEN FOR WEARHOUSE AND OFFICE SPACE WE WORKED ON ALL INTENTIES PERTANING TO ELECTRICAL FIRE ALARM, HVAC, EXT
OFFICE NUMBER 480-***-**** LAS VAGAS,NV
CLEAR CREEK ELECTRIC PROJECT HIGH END CONDOS ON THE RIVER
JM ELECTRICIAN JUNE 2006 TO JUNE 2007
WORKED ON MAIN INCOMING POWER AND METER SECTIONALS, ALSO PULLED IN ALL FEEDERS HELPED WITH FIRE ALRAM AND ELEVATOR, PIT AND SERVICE ROOM.
SYSTEMS ELECTRIC PROJECT CONCETE (TILT UP )NEW DOOR
JM ELECTRICIAN SEPT. 2004 TO MAY 2006 MANUFACTURE
WORKED ON ROOF TOP SWAMP CCOOLERS, THEN MISC. TASKS INSTALED MAIN GEAR, PANELS IN SHOP AREA,AND CONTROL PANEL FOR ROOF TOP COOLERS.
OFFICE NUMBER 760-***-****
ONE STOP INC. PROJECT LIFE GUARD HEAD QUARTERS
JM ELECTRICIAN 2003 TO SEPT. 2004 HUNITON BEACH,CA
ON THIS JOB I OPERATED A 310 JHONDEER BACKHOE AND EXCAVATED HOLES FOR VAULTS, PRIMARY ELECTRICAL FEEDS AND TELEOPHONE. I DID NOT JUST DIG I ALSO SET BASE FOR VALUTS SET THEM WHEN DELIVERY CAME IN. INSTALLED THE PRIMARY UNDERGROUND CONDUIT (PVC) AND CONDUIT, BOXES IN THE BLOCK WALLS . FOREMAN MIKE WISDA PH 951-***-****
EDUCATION AND CERTIFICATIO
I WOULD HAVE TO SAY 90% OF MY EDUCATION IS ON THE JOB BUT WHILE ON THE JOB I GOT TO BE TAUGHT SAFE OPERATING OF FORKLIKTS, TRENCHERS,BACKHOES, EXCAVATORS, LOADERS, BOX SCRAPERS,AND ALL TYPES OF MAN LIFTS UP TO 125FT GENIE.
I HAVE TAKEN A TWO YEAR COURSE ON ELECTRICAL WHICH TAUGHT ME THE FUNDALMENTALS OF ELECTRICITY,WITH BASIC TRANSFORMER, MOTOR THEORY.
SCHOOL: PENNFOSTER ONLINE EDU. COMPLETED AND RECEIVED A DIPLOMA
I HAVE TAKEN CLASSES ON SCAFOLDING, EXCAVATIONS/TRENCHING, ARK FLASH PREP AND AWARENESS, OSHA 30, MSHA 48.
STATE ELECTRICAL LICENSES: GRENRAL ELELCTRICIN CALIFORNIA (CA JW CARD),UNCLASSIFED FOR IOWA,
INTERSTS
IN MY SPARE TIME I ENJOY RIDING MOTORCYCLES ON AND OFF ROAD OR OUT IN BOAT ON THE COLORADO RIVER FISHING/PLAYING WITH MY FAMLIY. I DO ENJOY LEARNING NEW OR UNFAMILER
ELECTRICAL TECHNOLOGY AS TO BATTERIES, INVERTERS, SOLOR POWER, CONTROLERS SUCH AS I/O PANELS OR MARSHELLING PANELS, ESD PANELS / CONTROLS.
REFERANCES S PHONE NUMBERS YEARS KNOW OCCUPAITION
RICH MOTT 931-***-**** 12 ELECTRICAL FOREMAN
DAN LAMBERT 319-***-**** 5 ELECTRICAL FOREMAN
HILARIO CORONADO 281-***-**** 5 ELECTRICAL FOREMAN