Engr Shahbaz Ahmed Khan
Mobile (Pakistan): ****-300-***-****,
E-Mail: ****-****@****.***
Mailing Address 1 : New Abadi New Tramari Chock Islambad
Mailing Address 2 :House # BIX415-120 Muhammadi Colony, Battah No. 4,
Ahmedpur.Road Near NLC Bahawalpur.
Mid-level assignments in Telecom & Power Project, Site Management, Relationship Management and Team Management with an organization in the Telecom & Power industry
CAREER CONSPECTUS
More than 5 years of cross-cultural experience as an Electrical Engineer in supervision of projects right from development to delivery encompassing planning, monitoring, controlling phases of project lifecycle, inter-discipline coordination, and resource planning.
•A strategic planner with expertise in planning and executing projects
•Loss Prevention Engineering
•Design Assistance & Estimation
•Preparation of man-hour estimates, change order requests, coordination with client and other disciplines.
•Provide engineering support during construction and assist in startup.
•Team Organization and deployment.
•Strong communication and public dealing.
MEMBERSHIPS
International Membership
IAENG (International Association of Engineers)
#
155025
Pakistani Membership
PEC
(Pakistan Engineering Council ) Pakistan
PEC/Elect/42508
Areas of excellence include:
- Project Coordination
- Site Management
- Execution & Supervision
- Electrical Engineering
- Quality Assurance and Control
- Manpower Planning & Quantity surveying
- Design Calculations
- Coordination with Consultant
- Material Arrangement and Follow ups
- Facility Management
- Fire Alarm System Installation
- Subcontractor Follow Ups
SCHOLASTICS
2013 B.Sc. Electrical EngineeringAPCOMS,UETTaxila, Rawalpindi-Pakistan.
2008 B.Sc. (Math A &B,Physics)Ismalia University Bahawalpur, Pakistan
Degrees are attested by
• Higher Education Commission of Pakistan(HEC), Islamabad
• Ministry of Foreign Affairs(Foreign Office)of Pakistan, Islamabad
Diploma of Associate Engineer (Electrionic Technology)
Punjab Board of Technical Education (PBTE) Lahore, Pakistan
Attested by
•
Punjab Board of Technical Education (PBTE), Lahore
Diploma course in Ms Office (06 Month)
ICON Institute of Bahawalpur, Pakistan
EMPLOYMENT SCAN
Zhongxing Telecom Engineering (ZTE) Pakistan Faisalabad, Pakistan
09March’2016 – 31 July’2016 I am Site Engineer Mobilink 2G/3G Sawap, Project
•Supervise the installation of New Site
•Ensuring material used on site shall be as per approved submittal and the work carried out as per approved method statements, shop drawings and submittals
•Supervising Document Controller at site and implement effective Documents & Drawing Control system
•Prepare and update Testing and Commissioning documents and activities as per the requirements
•Manage required submittals and approvals to ensure timely project completion
•Coordinate with the concerned section, consultant and suppliers pertaining to quality matters
•Prepare Method Statement, Inspection & Test Plan & Inspection checklist for MEP Works
•Coordinate the necessary inspections of MEP works on site with the activities
•Day to day planning and organizing Inspection and testing activities at site
•Prepare Works Site Inspection Request & Material Inspection Request as per specification
•Prepare and update MEP Weekly & Monthly Progress Report. Monitor activities of MEP
•Expedite the preparation of Handing Over Documents as per the requirements and standard
•Prepare and monitor daily MEP Activity Report and Manpower Report
•Keep and record documents for easy access and control
•Meeting & Coordination with Subcontractor
•Team Handling & Moving
•Testing commissioning and troubleshooting
•Troubleshooting of VSWR and antennas issues.
•Identifying and resolving all Matter of Site
Professional Engineering Services Multan, Pakistan
22 July’2015 – 08 March ’2016 I am POC (Project Coordinator) Mobilink/Zong/TP Swap, Project ZTE in PES (Professional Engineering Services) Pakistan
•All Matter of company
•Meeting & Coordination with Customer
•Team Handling & Moving
•Invoice Prepared & Signature from Customer
Mobiserve Pakistan Limited (PVT).
Bahawalpur Punjab, Pakistan
December’2013 – to 30 April 2015 :Operation & Maintenance Engineer
Carry out the monitoring & maintenance, fault rectification & Troubleshooting for Generator
Supervise the installation of New Generator
Carry out the testing commissioning and troubleshooting the faults of Ericsson and Alcatel BTS.
Troubleshooting the internal and external alarms of Ericsson RBS 6301, RBS6201 and RBS6101
Commissioning, installation and trouble shooting of all kinds of rectifier and properly patching of all external alarms.
Responsible for trouble shooting of E1 at BTS up to traffic.
Trouble Shooting and faulty monitoring of all types of rectifiers Delta,Emerson,altec,soft power and flat pack power system.
Troubleshooting of VSWR and antennas issues.
Properly patching all PCM through microwave links.
To manage and train the teams for PM and CM purpose.
To arrange all documentation and database of cell sites.
Provide technical support to the team for better feedback
Supervision of all the indoor and outdoor (feeder cables and groundings of the cell sites.
Installation and fault tracing/troubleshooting of microwave link 2p,4p,6p,20p and CN.
Co-ordination with operator/vendors/subcontractor for fault identification and rectification, problem synthesis & reporting
Solving all the path balance related issues of OMT radios by countering the reflection and calibrating either RX or TX path depending upon uplink or downlink losses.
Identifying and resolving the sector swapping issues in the BTS cell sites
Monitoring the stats of the problematic BTS radios and troubleshooting the issues.
Identification of BSS hardware problems in field by monitoring all the alarms
To clear all kinds of EAS and IAS alarms of Ericsson BTS daily basis.
Perform health check of BSS Equipment and make monthly Equipment performance report.
Performing offline commissioning of Ericsson OMT.
Solving of VSWR issue using site master.
Installation of mini links 2p,4p, 6p,20p and CN
E1 patching, Alarm patching. Alarms installation.
Site survey and Quality checking of cell sites.
Alarms rectification with co-ordination of NOC.
Ensure Preventative maintenance.
Ensure Corrective maintenance
Supervise the Installations Jobs
Managing the full deployment of the Direct and Indirect manpower to achieve the targets successfully.
Generally responsible for implementations and monitoring of all electrical related works at site.
Planning-Staffing-Organizing
Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.
Submitting daily, weekly Reports to Client and weekly, monthly updated schedule
Ensure the QA/QC Requirements.
Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.
Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
TESLA INDUSTRIES (PVT) Islamabad, Pakistan
January ’2013 - Jun’2013: Production Engineer
•Solar system assembling,testing and calibration,installation Project,
•Evaluates electrical systems, products, components, and applications by designing and conducting research programs; applying knowledge of electricity and materials.
•Keeps equipment operational by following manufacturer's instructions and established.
•Part of team for the Solar Power Development Project.
IUSE School of Engineering & Management Rawalpindi, Pakistan
Jun’2013 - December’2013: Lab Engineer & Lab Demonstrator (Department of Electrical & Computer Engineering)
•Responsible for teaching Electrical Engineering Lab courses.
•Preparing the Course material as per (HEC) and (PEC).
•Demonstrator for the Engineering Lab Experiments.
•Team Management as Being Labs In-charge.
•Updating and compiling the results.
Institute of Optronics Minister of Defence Production Rawalpindi, Pakistan
16 July’2012 – 31 August ’2012: Internship (06 Week) (Department of Minister of Defence Production )
•Introduction and main concepts of Optronics.
•Environmental test facility.
•Contract management.
•Mechanical inspection of components of Night Vision Devices.
•Research & development pertaining to Night Vision Devices.
•Mechanical workshop.
NAF Engineering Works Rawalpindi, Pakistan
December’2011 – January ’2013: Assistant Electrical Engineer (Department of Electrical Engineering )
•Inspect project sites to monitor progress, work targets and ensure conformance to design specifications and safety standards.
•Responsible for all the electrical engineering work for the Project.
•General estimation for the Electrical material usage.
•Submission of Material Inspection Requests (MIR) and inspection request.
•Provided the support for making As Built Drawings.
•Team Management
•Accounts Records. General estimation for the Electrical material usage.
•Submission of Material Inspection Requests (MIR) and inspection request.
•Finalized the Operations and Maintenance Manual and Schedules for maintenance.
ADDITIONALQUALIFICATION
2014 –In progress MS in Electrical Engineering (Power) course work complete thesis continue
APCOMS,UET Taxila Rawalpindi Pakistan
•
ITSKILLS
OMT 50 & 49, Mini link 2.2 & 2.5, Delta Software, Emerson Software, Windows 7, Windows XP and Vista
Software’s
Electronics Work Bench, Proteous Software,Turbo C++ Matlab 2010,Internet Surfing,Windows Installation
MS Offices 2012, 2010 and Autocad 2007
INTERESTS& PASTIMES
History
Geography
Music
Space exploration
Science inventions & innovations
Other Languages
Other Culture
PERSONAL DOSSIER
Father Name
:
Allah Wasaya
Date of Birth
:
06th July, 1984
NIC #
:
31202-9326619-1
Domicile
: Bahawalpur
Nationality
:
Pakistani
Passport # :
Marital Status :
Religion :
Driving License # :
PQ4126191
Mariad
Islam
BWP-32255
COMMUNICATIONPERCEPTIVE
Language Aptitudes
Reading
Writing
Listening
English
Excellent
Excellent
Excellent
Urdu
Excellent
Excellent
Excellent
Sariki
Excellent
Excellent
Excellent
Punjabi
Excellent
Excellent
Excellent
Arabic
Beginner
No
Understandable
REFERENCES
Will be furnished upon request