March
Oversaw all crews for billboard installation, maintenance, and construction for more than 2,500 billboards
in the Dallas -Fort Worth Metroplex.
Control production costs, maintain budget and run multiple reports for upper management.
Responsible for implementation and overhaul of the shipping, receiving and warehouse.
Revamped the productivity pay program, resulting in a 15% improvement.
Optimized the overall customer experience through speed to market for real time installation and photos of
billboards.
Increased productivity by 20% while simultaneously reducing head count by 20%.
Oversaw the development and launch of Productivity pay and incentive program.
April 1995
to
June 2003
Clear Channel Outdoor
Arlington, TX
Construction / Billboard installer
Built, constructed and maintained billboards from ground up.
Weld, equipment, torch, hand tools and equipment associated with elevated and billboard work.
Use of pulleys, lifts, slings, and stages for elevated work.
Tear down billboards when lease is up or relocation with use of crane.
Crew Chief responsible for 2 to 4 man crew.
Traveled to multiple markets to help with heavy workloads.
Operate crane and maintain CDL.
Operate lifts, bucket trucks, and forklifts.
Trained to fill in for supervisor while he was sick or vacation.
October
1992
to
April 1995
Horne Electric
Fort Worth, TX
Electrical Apprentice
Acquired my wiremans license.
Wired new houses and trimmed out when sheetrock was finished.
Worked on many commercial jobs for : Colonial Country Club, Lockheed Martin, On the Border and more.
Read and worked from electronic blueprint drawings.
Connected wires to circuit breakers and transformers.
Tested the entire electrical assembly for performance levels and safety concerns.
Frequently worked overtime, weekends and holidays.
Used bucket trucks, forklifts and lifts.
Tarrant Couty College
Fort Wort, Texas
Continuing Education
Electrical Codes--Beginner
Electrical Codes--Advanced
Windows