NILO N. PINO
Cel # 099******** / Land line # **95334
Email add : ****.****@*****.***.**
POSITION DESIRED : PROJECT ENGINEER
Age : 50 yrs old
Address : IBO, Lapu-lapu City, CEBU
Religion : Roman Catholic
Date of Birth : January 19, 1966
Place of Birth : Ibo, Lapu – Lapu City
Sex : Male
Civil Status : Widow
Citizenship : Filipino
Height : 163 cms
Weight : 140 lbs
Tax Identification No. : 104-670-863
SSS Number : 06 – 1061161 – 4
Pag – ibig Number : 070*-******-**
FIN : G5932446U
EDUCATIONAL BACKGROUND :
College : University of the Visayas
Colon St., Cebu City
Degree : Bachelor of Science in Mechanical Engineering
( BSME )
SY Graduated : 1981 – 1989
Secondary : Phil. Air Force College of Aeronautics
Mactan Air Base, Lapu – Lapu City
1977 – 1981
Elementary : Cebu School of Arts & Trade
Cebu City
1971 – 1977
WORK EXPERIENCE :
Mar. 2007 to April 2016 : TEND ENGINEERING SERVICE PTE LTD
10M ENTERPRISE ROAD Singapore S(629838)
Designation & Assignments
KEPPEL SHIPYARD SINGAPORE
TUAS / BENOI YARD
PRODUCTION AND GENERAL SUPERVISOR
ARMADA OLOMBENDO FPSO PROJECT
July 2015 to April 2016
FPSO STONE PROJECT
April 2015 to June 2015
ICHTHYS TURRET PROJECT
July 2014 to March 2015
Supervise Fabrication and Installation of hull outfitting works:
a)Equipment Foundations
b)Fuel Oil tanks
c)Vertical & Inclined Ladders
d)Platforms & Gratings
PRODUCTION AND GENERAL SUPERVISOR
NINGALOO VISION RECTIFICATION PROJECT
April 2014 to June 2014
Supervise pipe installation of following system at Module
a)Oily Water System
b)Water Injection System
c)Fuel Gas System
d)Flare System
PIPING PROJECT ENGINEER
N’GOMA FPSO
May 2012 to March 2014
Monitor pipe installation of the following system:
a)Engine Room Sea Water System
b)Engine Room Bilge System
c)Anti Marine Growth System
d)Produce Water System
e)Process Liquid System
f)Heating Coil System
PIPING PROJECT ENGINEER
FPSO CIDADE DE ANCHIETA
October 2011 to April 2012
Monitor pipe installation of the following system:
a)Process Gas Line
b)Fuel Gas Line
c)Sea Water System
d)Fire Water System
e)Water Injection System
f)Oxygen Scavenger system
g)Instrument Air System
h)Cooling Medium System
i)Process Well Stream Mix Fluid
j)High Pressure Flare Line
PIPING PROJECT ENGINEER
CASTORONE Project
PIPE LAYING VESSEL
July 2011 to October 2011
Monitor pipe installation of the ff. system:
a)Fresh Water Cooling System
b)Boiler System
c)Condensate System
d)Machinery Drain System
e)Service Air System
JURONG SHIPYARD PTE LIMITED
Jurong Island, Singapore
PIPING PROJECT ENGINEER
WEST ELARA Project
JACK UP LEG
August 2010 to July 2011
Monitor pipe installation of the ff. system:
a)High Pressure Mud Line
b)Cantilever Hydraulic Line
c)Drill Water Line
d)Low Pressure Mud Line
e)Engine Room Pipe Line
f)Sea Water Line
g)Fire Line
h)Instrument Air Line
i)Cement Pipe Line
j)Jetting Pipe Line
k)Choke & Kill System
PIPING PROJECT ENGINEER
SEA DRAGON I Project
Semi-Submersible RIG
April 2010 to August 2010
Monitor pipe installation of the ff. system:
a)High Pressure Mud Line
b)Hydraulic Line
c)Riser Tensioner Line
d)Low Pressure Mud
e)Diesel Oil Line
f)Sea Water Line
g)Fire Line
h)Drill Water Line
i)Instrument Air Line
j)Service Air Line
k)Fresh Water Line
l)Cooling Water System
PIPING PROJECT ENGINEER
NOBLE JIM DAY Project ( NJD)
RIG BINGO 4
February 2009 to April 2010
Monitor pipe installation of the ff. system:
a)Derrick Pipe Line
b)Riser Tensioner Line
c)Choke & Kill Line
d)High Pressure Mud Line
e)Hydraulic Line
f)Low pressure Mud Line
g)Sea Water Line
h)Fire Ring Main Line
i)Diesel Oil Line
j)Service Air Line
PIPING PROJECT ENGINEER
FPSO MONTARA Project
FLOATING PRODUCTION STORAGE & OFFLOADING
August 2008 to February 2009
Monitor pipe installation of the ff. system:
a)Inter Module Piping
b)Fire & Foam Line
c)Sea Water & Produce Line
d)Offloading Line
e)Instrument Air & Utility Air Line
f)Heli fuel Line
g)Diesel Oil Line
PIPING PROJECT ENGINEER
FSO QUEENSWAY Project
FLOATING STORAGE & OFFLOADING
March 2008 to August 2008
Monitor pipe installation of the ff. system:
a)Cargo Offloading Line
b)Crude Oil & Cooler Line
c)Inert Gas Line
d)Decanting Line
e)Water Separator Line
PIPING PROJECT ENGINEER
FPSO RAROA Project
FLOATING PRODUCTION STORAGE & OFFLOADING
March 2007 to March 2008
Monitor pipe installation of the ff. system:
a)Inter Module Piping
b)Turret Pipe Line
c)Cargo Oil Line
d)Offloading Line
e)Hydraulic Line
f)Fire Ring Main Line
g)Vent System Line
h)Inert Gas Main Line
Jan 1998 to Mar 2007 : BSF Engineering & Supplies
TSUNEISHI HEAVY INDUSTRIES ( Sub-Contractor )
Buanoy, Balamban, Cebu
Designation & Assignments :
FIELD SUPERVISOR
HULL ERECTION NEW SHIPBUILDING
Supervise Fitting, Welding & Finishing Works
a)Lumpsum Blocks on Fitting Works
b)Lumpsum Blocks on Welding Works
c)Lumpsum Blocks on Finishing Works
FIELD SUPERVISOR
OUTFITS FACTORY
Supervise fabrication ot the ff. Outfitting Project for New Ship
a)Various Pressurized Tanks
b)Stage Platform
c)Pipe Support
June 1988 to Dec 1998 : METAPHIL INCORPORATED
Tipolo, Mandaue City
FABRICATION SUPERVISOR
FABRICATION DIVISION
September 1994 to December 1998
GRID PARK STEEL STRUCTURES
Mitsubishi Heavy Industries – KOBE
Kobe, Japan
Supervise fabrication of steel structure as per specification & with the confirmation of MHI kobe Japan Inspector.
CAR PALLET PROJECT
Mitsubishi Heavy Industries – KOBE
Kobe, Japan
Supervise fabrication of 108 units Car Pallets to be install at Grid Park Steel Structures.
SULPHUR RECOVERY UNIT PROJECT
( KTI ) KINETICS TECHNOLOGY INTERNATIONAL
Supervise fabrication of :
a) H2S Stack Support
b) Pipe supports & Rock Muffler
FABRICATION of PIPE SPOOLS PROJECT
Mitsubishi Heavy Industries – AMERICA
MINDANAO GEOTHERMAL I
Supervise fabrication of SAINLESS STEEL PIPES & CARBON STEEL PIPE as per isometric drawing and specifications.
Pipe diameter range ӯ to 42ӯ
ITALIMPIANTE PROJECT
TWO (2) x 300MW MASINLOC COAL FIRED
THERMAL POWER PLANT PROJECT Masinloc, Zambales
Supervise fabrication of :
a)Box Bridge Type Conveyor
b)Gallery Bridge Type Belt Conveyor
c)Trestles & Chutes
PROJECT SUPERVISOR
CONSTRUCTION DIVISION
Metaphil Incorporated
SHELL TABANGAO ASSET RENEWAL PROJECT (STAR)
FLUOR DANIEL PACIFIC INC. ( FDPI )
SHELL Refinery, Tabangao, Batangas City
January 1994 to August 1994
Supervise fabrication, installation & erection of pipe line from manifold to live line. Erection of pipe line from pump to live line on top of LPG bulk tank.
108MW ENRON POWER PLANT PROJECT
FLUOR DANIEL PACIFIC INC. ( FDPI )
Subic Bay, Olongapo City July 1993 to December 1993
Supervise material shake out, preparation & erection of the ENGINE BUILDING STRUCTURAL STEEL & Punchlisting Works.
PROJECT QUALITY CONTROL ENGINEER
CONSTRUCTION DIVISION
Metaphil Incorporated
105MW ENRON POWER PLANT PROJECT
FLUOR DANIEL PACIFIC INC. ( FDPI )
Pinamucan, Batangas City
November 1992 to April 1993
Prepare checklist & inspection report for the fabrication, installation & erection of Cylindrical tank & pipe line.
QUALITY CONTROL INSPECTOR
Fabrication Division
January 1992 to October 1992
Check lay-out dimension & materials to conform to plans and specification & welding quality. Responsible that all finished jobs meets the specifications of the customer in terms of quality & workmanship.
GRINDER OPERATOR, FABRICATION FITTER, LAY-OUTER
Fabrication Division
June 1988 to 1992
Perform miscellaneous lay-outing & fitting works as per plan & specifications requirements.
SEMINAR WORKSHOP ATTENDED :
Non- Destructive Testing Seminar
Metaphil Incorporated
Tipolo, Mandaue City
Fabrication Lay – Outing Seminar
Metaphil Incorporated
Tipolo, Mandaue City
Transformer / Total Quality Management
Metaphil Incorporated
Tipolo, Mandaue City
Basic Tools & Techniques In Problem Solving
Metaphil Incorporated
Tipolo, Mandaue City
5S Japanese Practice of Good Housekeeping
Metaphil Incorporated
Tipolo, Mandaue City
TRAININGS :
Welding Training ( Actual ) – GTAW / SMAW
Metaphil Incorporated
Tipolo, Mandaue City
Trainors Training
Metaphil Incorporated
Tipolo, Mandaue City
Applicants Signature