Post Job Free

Resume

Sign in

15 Years MEP Professional

Location:
Jakarta, Indonesia
Salary:
12000000
Posted:
December 17, 2018

Contact this candidate

Resume:

My CV updated for the application managements from my top qualification and previous working experiences

Full Names:Robinson Monang Aruan

Nationality: Indonesia

I. Present Employment Status: Un-employed

A) Country: Indonesia

B) Present Employment Status: Pt Pulauintan

C) Functional title: MEP Coordinator

D) Number of years of Experience: 2 yrs (2month)

E) Location: Gold Coast Office Pantai Indah Kapuk Project

Jakarta - Indonesia

G) Description of responsibilitie: As i undersigned main contractors / Direct contractors (Structure work) w/, management system work methodes statements client Pt Agung sedayu group ( Multi Artha Pratama ) initial ownner, Than NSC In/Exterior / MEP (Gondola, STP, Lift, Plumbing,Fire Fighting, HVAC, Electrical, Electronic & Ancelary Special lighting facade /landscape. (Pt Saptakencana Kharisma Jaya / Pt Jayantara / Pt Daya Cipta /Pt Kone / Pt Dwijaya / Pt Mitra Elang Perkasa / Pt Cipta Bayu Utama atc) our incharges FEE CORDINATION on begining the project to follows the construction daily routine aktivities such folow guidance methode statement procedure, i have a jobs desk to having like:

" Whitness Meeting The client Project manager

" Whiteness Meeting Engineering The Clients & Civil / Struktur / MEP NSC ( Nominated Subcontractor Contractors ) by owner

" Whitness Preconstruction Meeting by owner/ client

" Whitness System Designeer Meeting by owner/ client Consultan / NSC

"Review and received shopdrawing, daily, weekly, mothly report, Prestasion monthly report & schedulle nsc

"Fabrication shopdrawing MEP coordination

"Managed / Monitoring as going on work sourounding activities structure as concreted casting or pouring, regarding MEP installad an Packet coordination responsibilities

"Whitness Test Static MEP Procedure w/ Nominated Sub-contractor, Management Consultan and Client Project own

"Whitness Pre- Commissionning Testing and Hand Over To Building Management or POM

"Making / Given the report about mep site actualyties picture an presentasion board of director

On reference,

Robinson

II Privious Employment Status: Un-employed

A) Country:Indonesia

B) Present Employment Status: BBSI - JKMP JV

C) Functional title:MEP Supervisor

D) Number of years of Experience: 1 yrs

E) Location: Pondok Indah Hotel Residence Project

G) Description of responsibilitie: BBSI - JKMP JOINT VENTURES (Employed)

Balfour Beatty Sakti Indonesia - Jaya Konstruksi Manggala Pratama Joint Ventures is an Indonesian multidiscipline contractor with the experience and resources to provide the best possible services in many diversified fields of engineering and construction.

AS INFORMATION PROJECT ON HOLD;

1)PIHR ( PONDOK INDAH HOTEL RESIDENCE ) - 4th parking basement floor level bellow and 22th unut hotel and apartment floor level Upper w/ 1 unit house restaurant / bar tenant)

Car park 10.000 unit Basement, 1,2,3,4, and Ballroom / meeting room 20.000 people on 4nd, Swimming fool water 1000M3 capacities on 6th Florr and Hotel for cluster of executive, twin bath room, king bathroom, 13 Unit per Level X 15th FLorr, 300 unit hotel total _Apartment of cluster type unit 1, 2 & 3 bedroom on 2nd FLoor up to 22 th FLoor 199 total unit appartment

III. Privious Employment Status:

A) Country: Indonesia

B) Present Employment Status:BL Harbert LLC.

C) Functional title:Mechanical Supervisor

D) Number of years of Experience: 1 yrs

E) Location: A New american Embassy Project Jakarta- Indonesia

G) Description of responsibilitie: BL Harbert International, LLC, and design partner PageSoutherlandPage, LLP, have been selected to provide design-build services for the new U.S. Embassy Compound in Jakarta, Indonesia, by the U.S. Department of State – Bureau of Overseas Buildings Operations, the new compound will house U.S. diplomatic functions for Indonesia and is being designed to meet LEED Silver standards.

II. Privious Employment Status:

A) Country: Indonesia

B) Present Employment Status:Samsung C&T.

C) Functional title:Mechanical Equipment Piping Supervisor

D) Number of years of Experience: 1 yrs

E) Location:IFC II Project Jakarta- Indonesia

G) Description of responsibilitie:Samsung C&T Corporation was founded in 1938, as a parent company of Samsung Group.here i'm in charges preparation subtution temporary facility task and preparation equipment pump concreted and concreted plancing boom for the casting and w/ review an manage labour and staft mep subcontractor rensponsibility for ifc 2 project

AS INFORMATION PROJECT ON HOLD;

1)IFC II ( International Finance Center2 ) - 6th basement floor level bellow and 49th floor level Upper w/ 4 unit house tenant)

Basement, 1,2,3,4,5 an semi basement and 1fr, 2nd, 3rd, _49th an roof upper

III. Privious Employment Status:

A) Country: Indonesia

B) Present Employment Status:Samsung C&T.

C) Functional title:Mechanical Equipment Piping Supervisor

D) Number of years of Experience: 1 yrs

E) Location:IFC II Project Jakarta- Indonesia

G) Description of responsibilitie:Samsung C&T Corporation was founded in 1938, as a parent company of Samsung Group.here i'm in charges preparation subtution temporary facility task and preparation equipment pump concreted and concreted plancing boom for the casting and w/ review an manage labour and staft mep subcontractor rensponsibility for ifc 2 project

AS INFORMATION PROJECT ON HOLD;

2)IFC II ( International Finance Center2 ) - 6th basement floor level bellow and 49th floor level Upper w/ 4 unit house tenant)

Basement, 1,2,3,4,5 an semi basement and 1fr, 2nd, 3rd, _49th an roof upper

IV. Previous Employment History:

A) Country:Indonesia

B) Present Employment Status:Shinhwa Techno Plant PT.

C) Functional title:MEP Drafterr

D) Number of years of Experience: 1 yrs

E) Location:Batiqa Hotel JababekaII, Cikarang-Indonesia

G) Description of responsibilitie:Prepation Working Reference specification own of By The Bill of Quantity From The Begining For Tender Til For Construction Than option Making Shop Drawing, Fabrication Analisys and Design MEP and Commercial Services system Own project required an Main Contractors management as coordination sorrounding structures, civil and interior directly on site and follows the regulation and schedulle RFI / RFA an call under having document control submited w/ cover later transmital number and highs lights the additional, balences and repleacement work than waiting feed back note txt or reviewed from the senior engineer

AS INFORMATION PROJECT ON HOLD;

3)BATIQA JABABEKA HOTEL ( 7th floor level and 500 unit house tenant)

Basement, 1,2,3,4,5,6,7 and roof floor)

V. Previous Employment History:

A) Country:Indonesia

B) Present Employment Status:Prapanca Engineering PT.

C) Functional title:MEP Assist. Engineer

D) Number of years of Experience: 1 yrs

E) Location:Ruko Rajawali Center Jl.Rajawali Blok A No.1, Pasar Minggu Jakarta-Indonesia

G) Description of responsibilitie:As Follows Working Analisys and sketches Design MEP and Commercial Services Own project required an consultant management as coordination contraction on site.

AS INFORMATION PROJECT ON HOLD;

4)MERILYN HOTEL SERPONG ( 5th floor level and 400 unit house tenant)

Basement, 1,2,3,4, and roof floor

5)WHITE COFFE FACTORY SAYUNG SEMARANG PROJECT

-Office management (1,2 and 3 level floor)

-Gudang barang jadi 1 and 2

-Gudang Bahan baku

-Gudang packaging

-Boiler area

-Spray dryer

-Wwtp area

6)MOTOR BIKE LAND PARKING PLAZA INDONESIA ( 5th floor level )

7)BARACK / CAMP HOUSE AND MESSHALL KPP SULAWESI PROJECT

-Mess Labour 30M X 8M . 10unit

-Yunior Staft Mess 30M X 8M . 4unit

-Senior Staft Mess 30M X 8M . 2unit

VI. Previous Employment History:

A) Country:Indonesia

B) Present Employment Status:Leighton Contractors Indonesia PT.

C) Functional title: Plumbing Supervisor

D) Number of years of Experience: 1 yrs

E) Location: #228 – LMT Caterpillar BatamProject – Indonesia

F) ### Site Employer address:004/01 Rt/Rw. Kampung Cunting Atas, Kel/Kec: Tj Uncang -

Bt Aji. Zip Code: 29422 Batam – Indonesia

###Heads Employer address: 18/F Talavera Office Park, Jl. T.B. Simatupang KAV. 22-26, Cilandak Barat,

Jakarta 12430, Indonesia_www.leightonasia.com.

G) Description of responsibilitie: Indicate which of thefollowing are most applicable: Responsible or regulation for reviewing and approving piping material specifications and datasheets, coordinating with Engineering Manager and other disciplines, assisting procurements and fabrication, liasoning with Caterpillar LMT lardger minning truck for design / engineering and material procurement activities, piping sanitary systems and commercial served air compressed gas platforms. Wide on technical clarifications, material inspections and testings,datatabase Administrator, monitoring progress and coordinate project execution including project executed using 3D CADD PDS-Intergraph or PDMS design / Catalogue & Spec - AVEVA.Coordinate its associated software such as Orthogen-3DS, Isogen-Alias, Smart Plant Review-Intergraph, StruCAD-AceCAD.Engineering & Contractor for the

A)Jobs Profile: The Role To manage installation of a section of the works, short term planning and management of labour, equipment and materials.Maintain a progressive and positive attitude within the site teams.such as fabrication, erection, hydrostatic testing, Pre-

commisioning PLUMBING System work of above ground basement/unground level including equipment, material, fitting and pipe work field preparation, fabrication/installation, erection, testing, commissioning, shutdown, starup and inner commercial services.

Review construction drawings, makers’ installation/erection manuals, test and commissioning procedure. Implemented equipment installation based on consultant’s equipment arrangement drawing, foundation drawings, interface drawings and equipment list. Prepared material and work force to meet Production Schedule. Handled ad-hoc projects or duties as assigned by the management when required.

Inspected & Approved mechanical completion check sheet of installed equipment and submit punch list of missing items as per drawing.

PROJECT INFORMATION :

LAND AREA : 246,134 SQ.M.

REQ. GREEN AREA(MIN. 10%) : 24,614 SQ.M.

PROVIDE GREEN AREA : 49,930 SQ.M

FABRICATION BUILDING COV.AREA : 43,450 SQ.M.

ASSEMBLY BUILDING COV.AREA : 36,500 SQ.M.

OFFICE BUILDING COV. AREA : 2,475 SQ.M.

CLS#2 BUILDING COV. AREA : 1,300 SQ.M.

MOSQUE BUILDING COV. AREA : 480 SQ.M.

UTILITIES BUILDING COV. AREA : 2,850 SQ.M.

GUARD HOUSE BUILDINGS COV. AREA : 520 SQ.M.

SHELTER COV. AREA : 3,400 SQ.M.

VII. Previous Employment History:

A) Country:Indonesia

B) Employer:INDO MECO PRIMATAMA PT.

C) Functional title: Plumbing Supervisor

D) Number of years of Experience: 1 yrs

E) Location: Trans Studio And Ibis Hotel BandungProject – Indonesia

F) Employer address: Street. KH. Hasym Ashari

Jakarta central – Indonesia

Zip Code: 10150

Phone number: 021-*******

Email address:acwf4m@r.postjobfree.com

G) Description of responsibilities: As the Plumbing Supervisor For The Mechanical Electrical Engineering Contractors Company at Trans Studio And Ibis Hotel Bandung.I Have a been Responsible For Supervise and Control management installation of a section of the works, short term planning and management of labour, equipment and materials.Maintain a progressive and positive attitude within theTo The Role manage installation of a section of the works, short term planning and management of labour, equipment and materials. Maintain a progressive and positive attitude within the site teams.such as erection MVAC Fire fighting, and Plumbing work of above ground level/underground level including field fabrication/installation of Mechanical Equipment satatic,Piping EPC and Electrcal work.(Sprinkler,Hydrant,Chiller,Air Conditioning Refrigrent,and Plumbing Pumps Systems)and etc on trans studio & ibis hotel bandung projectExpedite materials availability on warehouse and allocate such materials required for each FCN,Prepared concession request, Technical query for the alteration/amendment on design and layout of piping on site which is must be economic,safe and easily and easily maintain.

Responsible for As- built and revision drawing and field instruction for piping.

Technical & engineering support to field supervisors

PROJECT INFORMATION :

Ibis Hotel : 22 Level Floor.

Basement 1 and 2

Trans hotel: 18 Level Floor.

Basement 1 and 2

VIII. Previous Employment History:

A) Country: Indonesia

B) Employer: PT. Hardi Agung Perkasa

C) Functional title: Mechanical Supervisor(FF & FH) / Sprinkler and plumbing

D) Number of years of Experience: 1 yrs

E) Location: Market Senapelan Pekanbaru Riau Project – Indonesia

F) Employer address: Street. Tebet timur raya NO. 42

Jakarta Selatan – Indonesia

Zip Code: 12820

Phone number: +622********

Email address:acwf4m@r.postjobfree.com

G) Description of responsibilitie: As the Mechanical Supervisor For The Engineer&Contractors Hardi Agung Perkasa Company, For Trade Centre Pasarbaru Senapelan Project.I Have a been Responsible For Supervise and Control The Piping EPC/Structure Equipment Static Installed Construction and hook Up activities Of Constractors To Acertain That The plan Will be Built As Per Specifications,Approved Drawings,Procedure In Accordance To Company's Quality Health Safety Environment. Ensure of quality of works is achieved and safety regulations are complied with for monitoring the daily work activities.big bore and small bore, Prepares field change notice (FCN) for revised key plan drawing and isometric for the specialy plumbing work,pipe supports to suit actual site condition and based.Prepares bill of materials quantity for the requisition of additional materials. Expedite materials availability on warehouse and allocate such materials required for each FCN,Prepared concession request, Technical query for the alteration/amendment on design and layout of piping on site which is must be economic,safe and easily and easily maintain.

PROJECT INFORMATION :

Ibis Hotel : 22 Level Floor.

Basement 1 and 2

Trans hotel: 18 Level Floor.

Basement 1 and 2

IX. Previous Employment History

A) Country:Qatar

B) Employer:Consolidated Contractors International Company

C) Functional title: Piping Charge Hand

D) Number of years of Experience: 4 yrs

E) Location: Development QGX II and QCS 3&4 QATARGAS PROJECT

F) Employer address: Street. Raslaffan Industrial Area

Doha – Qatar

Zip Code: N/A

Phone number: +974-******* / 397 / 399

Website:https://careers.ccc.gr

Fax:4740160 / 239 / 109

G) Description of responsibilities: As The Piping Chargehand For The Consolidated Constractors Teyseer JV.Ltd,For Qatar Gas,Prodauction Conoco Philips and Shell Project In Raslaffan,State Of Qatar.I havea been Responsibilities Team Leaderships In Charge Piping&Equipment Installed,Pre-commisioning,Preservation,Shutdown Preparation Gas Turbine Compressor and Start Up Inner Gas.

Job profile Summary:

1. Preparation Fabrication shop and Testing (Fabrication & Erection) Piping Fabrication, Installation, and Testing & Commissioning. An experienced Piping & Mechanical Construction Supervisor with on-shore experience and a proven track record of success within EPC working environments.Results orientated & quality focused with training management & supervisory skills but equally comfortable working in a ‘Hands-On’ or Training role.Experienced in the fabrication, installation; maintenance and testing of many types of mechanical / piping systems, together with experience of Tank Erection (Jacking method and conventional method), Petro-Chemical, Oil and Gas recovery and process, Automation, Hydro testing & Leak Detection

2. Pre-Coommisioning

During this period testing, and reinstatement & commissioning of wellhead piping systems of the Area,Preparing shop drawing and Asbulit drawings,Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.Coordinates schedule of testing on piping to both hydro test group and QC. Perform related jobs as assigned by the area piping Superintendent.

Responsible for piping erection at area Piping system Flushing Testing Test pack Reinstatement,Test pack bolt tensioning,Chemical cleaning and Hot oil Flushing.Evaluate and monitoring manpower, equipment and other urgent materials toü meet the estimated work production and propose, suggest corrective action to the client when encountering field interfaces

3. Preservation

Preservation necessary required for Equipment static and Piping EPC work,cleanlines,arrangement,discipline,and argument are key of work succes The project. Direct supervise and coordinate activities of workers engaged in the fabrication,installation and underground pipes for drains and above grounds for process plants and structure erection equipments lives are they team presevation start the jobs cleaning with paint brush,WD40 for required avoid rusting,and prevent corrosion and applay chemical oil MIL-P 19,20,etc.Covered with plastic or tarpaulin The Equipment valves,pumps,compressor house,and gas turbine train

4. shutdown work

compressor,conducting punch clearing for rectified punched items and make confirmation to hand over to the client’s consultant for final walk down punch listening and clearing prior repleace the Equipment from inside Component tools and end to test requirements.Supervise Manage and monitoring the performance of foreman in related with the work activities workman

5. Start up innergas work in progress

Training and Seminars attended:Permit to work PTW,Confined Space,Method Statement & JSA,Waste Management,Lock out Tag out,H2S BA Certificate.

Responsible for the over all supervision of all Mechanical/Piping construction activities with strict compliance with relevant.Keeping familiar with the work program,complete with all amendments at any given time as the project progresses The Company user team.

X.Previous Employment Hystory:Unemployed or looking for employed

A) Country: Indonesia

B) Employer: Pt Paesa Pasindo Engineering

C) Functional title: MEP SKILL

D) Number of years of Experience: 5 yrs

E) Location: Kondominium permata berlian Jakarta Project – Indonesia

F) Employer address: Street. Tebet timur raya NO. 49

Jakarta Selatan – Indonesia

Zip Code: 12820

Phone number: +622*********

Email address:acwf4m@r.postjobfree.com

Website:http://www.paesa.co.id

G) Description of responsibilities: Indicate which of thefollowing are most applicable: PT Paesa Pasindo Engineering is aNational Private Company having main business in Construction

Industries. various construction projects, both in regional and nationalscale. Among the projects are Road Construction, Drainage, Building,Factories, Pipelines, Mechanical and Electrical, even EnvironmentalProjects, As Thelabour MEP Pipe Fabricatorprogressive andpositive attitude within the siteteams.such as fabrication, erection,hydrostatic testing, Pre-commisioning FF & FH FIRE FITTING & FIREHYDRANT (SPRINKLER) System and PLUMBING System work of above groundbasement/unground level includingequipment, material, fitting and pipefieldfabrication/installation of FF Fire Sprinkler / flushing systemSprinkler HEAD, (FH) Fire Hydrant / flushing system HydrantBOX and Hydrant PILLAR.(HW)Hot & (CW) Cold Water, (RWP) Rain WaterPipe, (SW) Sewage Water, And (WW) Waste Water With the Work itemspecification follows required details bellow:

1) Fire fitting (fire sprinkler) equipment and tools used on the basement Under, and typical floor

Fire Pump Electric

Electric motor

Controller

Diesel engine

Assembly accessories

PRV

Sprinkler HEADS

Jockey pump

With work system fire sprinkler provider and erection w/pipe

Sch40 black steel pipe and also hanger, cleam, material and

Support and test sprinkler valve with flushing pressure from

outlet end Reducing black steel pipe Sch15.

2) Fire hydrant equipment and tools used on the basement Under, and

typical floor roof Level floor.

Fire hydrant BOX

Hose rack

Fire hose

Hose nozzle

With work system fire sprinkler provider and erection w/pipe

Sch40 black steel pipe and also hanger, cleam, material and

Support and test sprinkler valve with flushing pressure from

outlet end Reducing black steel pipe Sch15

3)Cold Water equipment and tools used on the basement under,

Typical and roof level floor.

Ground water tank

Transfer pump

Distribution pump

Booster pump

Roof tank water storage

With work system CW/gravity of pump room / GWT ground water tank used PRV pressure reducing valve per each 5 (five) level floor and water hammer system and than For support help CW/gravity used for the BOOSTER PUMP from the high Roof Level floor 22 up to 18 level floor only, TRANSFER PUMP used for the transferred to roof tank water storage only. Then second last DISTRIBUTION PUMP for the used distribution to unit – unit sanitary, kitchen plan and etc.

4)RWP Rain water pipe equipment and tools used on the basement

Under / roof level floor

Sump pump 5pcs

Sump pit 5pcs

With work system WRP water rain pipe from the gutter / finish

floor with hole spare (RD) roof drain ø150 diameter, to the

down wasting place SUMP PIT.

5)SW Sewage water and (WW)waste water, equipment and tools used On the basement Under, and typical floor

Sewage pit

Sewage pump

Netralisation lard container

Central grease trap

With work system SW / WW Sewage / waste water from the wasting flow unit – unit sanitary accessories, right simple closet, urinal, lavatory, FD floor drain, pantry, meeting room, KD kitchen drain and receiving / waste handing.

PREVIOUS PROJECT INFORMATION :

MALL ARTHA GADING : 6 Level Floor.

Basement 1 and 2

ROXY SQUARE : 8 Level Floor.

Basement 1 and 2

BELLAGIO APPARTMENT : 22 Level Floor.

Basement 1 and 2

BANK MEGA CENTRAL JAKARTA; 34 level floor

1 and 2 basement

XI.Positions you would wish to Apply For:

A)MEP Superintendent

B)MEP Coordinator

C)MEP Engineer

5.Contact Details:

A) +62-819-****-**** Primary mobile number

B) +62-812-****-**** Second mobile number

C) acwf4m@r.postjobfree.com Primary email

D) acwf4m@r.postjobfree.com Second email

References:

Will furnished upon request

ROBINSON MONANG ARUAN



Contact this candidate