Post Job Free

Resume

Sign in

Project Manager Civil Engineering

Location:
Barrow-in-Furness, CMA, LA14 3RT, United Kingdom
Posted:
October 24, 2016

Contact this candidate

Resume:

Personal Details

Name:

Stuart Duff

Eligibility to Work in UK:

Yes – British National

Car Driver and Owner:

Yes/ Yes

Address:

* ******* ********

Barrow-In-Furness

Cumbria

LA14 3RT

Notice Period:

None

Contact Details

Home: 012**-******

Mobile: 079********

Email: acw7sl@r.postjobfree.com

Personal Profile

I am a punctual and motivated individual who is able to work in a busy environment and produce high standards of work. I am a PRINCE2 and Practitioner qualified Project Manager and hold my SMSTS. I have vast experience on new build construction, drainage and road works

I currently hold full SC clearance for BAE in barrow-in-Furness

I'm currently working as a Project/Site Manager on a Multimillion pound development of 318 luxury apartments in barrow in Furness, my duties include day to day running of the site, performing health and safety reports, method statements and risk assessments and daily meetings with suppliers and stakeholders, I have a strong understanding of safety and building code regulations and inspection compliance and also I can negotiate with subcontractors to perform specialised work and collaborate with multiple groups to maintain tight schedules

I inherited an issue with the CDM files being in past contractors names and had to rectify this and renew all the RAMS and also update the scope of work that had changed.

I have played a major part in overseeing drainage and groundwork on numerous sites round the north west from start to finish including new build and remedial work on old properties

I I have been managing projects on and off-shore in the industrial marine environment in the past with all current certification to carry out my duties.

In the past I have done management reporting and compliance for each project assigned to me. I ensure that each project I am assigned is fully resourced, completes on time, to the right specification and within budget.

My skills are varied and include working either individually or as part of a team. Health, safety and environmental issues are extremely important in my roles and I ensure compliance at all times for both me and my team. Managing changing working environments and practices is key to continuous improvements in all my roles.

I am extremely proud of all work I do and ensure all projects deliver what the client expects. My own work standards are high with an impressive record for achievement, timekeeping and flexibility in approach.

Key Skills

Project management/Supervision

Report writing & recording

Team building & developing individuals

IT literate (office, project, etc.)

Risk assessments & method statements

Using scaled drawings & specifications

Hydraulic and electrical fault finding

Seabed Surveys

Industrial electrical installations

Managing budgets

Weekly/Monthly progress reporting

Stakeholder management

Industry Experience

Subsea engineering

Vessel and Rig based work

Project Management

Hydraulic and electrical maintenance

Wind farm electrical generators

Marine R.O.V. pilot (585 hours piloting)

Civil engineering

General building and plastering

Qualifications

SMSTS APR 2016

PRINCE2 and Practitioner Feb 2016

Confined spaces & rescue with breathing apparatus

May 2011

NEBOSH

April 2011

Opito approved Banksman/Slinger

March 2011

Off-shore climbing & working at heights certificate

September 2010

MIST course certificate

August 2011

HL5 Medical Certificate

September 2010 – Exp 11/06/16

Norwegian medical certificate

August 2011 – Exp 09/08/16

BOISIET offshore survival training

August 2011 – Exp 19/05/18

ENG1 Seafarers medical certificate

August 2011 – Exp 10/08/15

Foundation degree in construction

September 2006

Door Supervisor Level 2

June 2003

NVQ Level 2 Brickwork

September 1997

Career History

ROLE

Project /Site management

DESCRIPTION OF ROLE

I'm currently working as a Project/Site manager on a Multimillion pound development of 318 luxury apartments in barrow in Furness, my duties include but not limited too. Day to day running of the site. Adapting and changing the scope of works to suit the Client over seeing all drainage works and liaising with subcontractors, performing health and safety reports, method statements and risk assessments, toolbox talks and daily meetings with suppliers and stakeholder and ensuring all work is finished to a very high standard.

I review RAMS on a weekly basis

PERIOD

01/2015

Present

Project Manager -ROV Pilot Technician Mozambique Africa

SUBSEA7 Rig Based Belford Dolphin

Responsible for full project management of performing seabed surveys & placing beacons on seabed.

10/2012 – 12/2014

NIGHT SHIFT Project Leader.

Mobilisation Project Manager.

ROV Pilot Technician.

SUBSEA7 Port Based (Norway) COSL INNOVATOR

SUBSEA7 Rig Based JOHN SHAW

SUBSEA7 Vessel Based Acergy Petrel

FUGRO Rig Based Ocean Nomad

FUGRO Rig Based Maersk Resiliant

FUGRO Rig Based Noble TVL

FUGRO Rig Based Wilphoenix

FUGRO Vessel Based Skandi Carla

Various project assignments working from technical briefs, planning workloads, supervising teams, managing budgets, monitoring progress, training on new equipment & procedures and reporting to senior project manager.

Conducting pre and post dive checks for teams and completing the required paperwork.

All projects included piloting, launch and recovery of various ROV’s, being responsible for H&S, method statements, risk assessments, maintenance, fault finding and replacements.

07/2010 – 10/2012

Turbine Technician

ROV pilot.

Tower team Project Leader.

Walney off-shore wind farm

Flying the ROV, TIGER and SURVEYOR+ and learning maintenance procedures, surveying cables, fitting messenger wires, rigging towers & cable pulling.

Refuelling and servicing generators, fault finding, erecting and dismantling scaffolding. Managing change with new technology and working procedures and ensuring everybody was up to speed with regular briefings

As of 1997 to 2010 I have worked with various construction company’s working up to supervisor level and Project leading on New Build House 3 and 4 bed and semi-detached and detached houses and Multi million pound maintenance projects around barrow for BBC

10/2009 – 07/2010

Electrician

Civil engineer

General Builder Plasterer

Keith Wilson Electrical

Jim Hasting Civil Engineering Ltd

Duties Included:

Setting out

Overseeing dig out

Overseeing steel structure installation

Overseeing the build process

Concreting floors

Fitting electrical sub-stations

Michael Thompson Ltd

Full internal fit out of kitchens and bathrooms

Lake District Properties

Overseeing new Build Construction on

3-4 bedroom detached houses from

Footings to completion.

Full site drainage to accompany new houses

Designing and laying roads to newly constructed houses

10/1997 – 10/2009



Contact this candidate