CV – Stavros D. Chatzoulis

*

STAVROS D. CHATZOULIS

PERSONAL INFORMATION:

Nationality: Greek

Date of Birth: 27th January 1967

Marital Status: Single

Address: Ellis 3Β, Kifissia 14563, Athens, Greece

Phone: 00 30-210-***-**** GR

Mobile: 00 30-694*-****** GR

00 971 (0-502**-**-** UAE

E-mail: acw6zc@r.postjobfree.com

Languages: Greek & English

EXECUTIVE PROFILE:

Stavros Chatzoulis was the MEP Director of the Helleniki Mechanologiki Group which comprises of several companies within the Greek construction industry specializing in the fields of general contracting, mechanical and electrical engineering works, construction management, project management, maintenance works and facilities management.

Stavros has over 25 years of experience in electromechanical engineering and has worked on major multiphase and high profile projects from the primary negotiation stage to successful completion and handover.

In general terms his role involved collaborating with clients from the outset in an effort to meet or exceed their expectations. This entailed in actively addressing financial constraints and complicated logistics to overcome project challenges, managing costs (including life cycle costing and project costs), project planning (preparing project programs and procurement schedules), implementation of quality control and quality assurance procedures, contract negotiations, organization of the execution of works and the supply of essential/critical materials, appointing and supervising sub-contractors as well as ensuring that projects perform within the limits of their overall time, cost and quality parameters. Stavros “hands-on” approach also assisted clients to develop and execute complex capital projects by: Ø Developing strategic allocation of works packages for projects thereby generating better value money;

Ø Establishing procurement strategies to enable effective and beneficial negotiations resulting with improved contract conditions and prices;

Ø Resolving technical issues within the clients’ consultant framework; Ø Developing and implementing the value engineering process. An experienced and well respected professional in his field Stavros is also a fully licensed and registered

‘’Higher Category Electromechanical Engineer” with the Technical Chamber of Greece. Prior to becoming involved with the Helleniki Mechanologiki Group of companies, Stavros held managerial roles within leading local contractors in Greece.

2

CV – Stavros D. Chatzoulis

2

EDUCATION:

Masters Degree in Electrical Engineering

Democritus University of Thrace, Greece, 1984 -1990 PROFESSIONAL EXPERIENCE:

MEP MANAGER

HILALCO (Member of the WADE ADAMS GROUP)

Abu Dhabi, UAE, November 2015 – Present

§ AL AIN WILDLIFE PARK AND RESORT - WORLD DESERTS PROJECT, Al Ain: a complex of multi-functional buildings in extending the facilities of the Wildlife Park and resort; current project budget is 70 million US dollars.

§ LANDSIDE CONSTRUCTION - NEW DELMA COMMERCIAL PORT, Delma Island: new infrastructure and civil works including the construction of several buildings housing the port facilities; current project budget is 20 million US dollars.

§ PRIVATE VILLA, Abu Dhabi: the construction of a luxury 5.500 m2 villa; current project budget is 12 million US dollars.

SENIOR ELECTRICAL ENGINEER

ATKINS Global

(Middle East Department)

Riyadh, Kingdom of Saudi Arabia (KSA), March 2015 – October 2015

§ Consultant to GPT for the UK Ministry of Defense (MOD) at KSA & Ministry of National Guard of KSA

SENIOR PROJECT ELECTRICAL ENGINEER

HABTOOR LEIGHTON SPECON LCC,

Dubai, UAE, November 2013 – February 2015

§ NEW MAFRAQ HOSPITAL, Abu Dhabi: the construction of new 240.000 m2 general hospital; the budget of the project was 1.4 billion US dollars.

§ LOUVRE MUSEUM, Abu Dhabi: the construction of the new 65.000 m2 museum: the budget of the project was 1.2 billion US dollars.

MEP DIRECTOR

HELLENIKI MICHANOLOGIKI GROUP

(General Contracting & MEP Services and Maintenance Operations) Athens, Greece 1997 – 2013

Having started off with a simple building contracting company it soon became evident that with the ever- increasing workload and various demands of certain clients that diversification was going to be the key for greater success.

With this in mind Stavros joined the Helleniki Michanologiki Group of companies, with the aim of achieving these objectives, and within a few years the group had several subsidiary companies established that accommodated the demands of most sectors of the construction industry in Greece. Whilst Helleniki Michanologiki S.A. covered the general contracting, mechanical and electrical works and consultancy services elements of the group the other entities covered specialist electrical installations, airport works, maintenance, facilities and property management. For clarification purposes the main companies of the group and the areas of the construction industry that they encompassed are given below:

I. HELLENIKI MICHANOLOGIKI S.A.

3

CV – Stavros D. Chatzoulis

3

Main purpose: General Contracting, Mechanical & Electrical Engineering Works, Construction & Project Management Services

II. HELLENIKI MICHANOLOGIKI MAINTENANCE SERVICES S.A. Main purpose: Maintenance and Facilities Management of Specialist Mechanical and Electrical Installations

III. HELLENIKI ENERGIAKI LTD.

Main purpose: Specialist Electrical Systems & Installations IV. H.M.E. ELECTROMECHANICAL APPLICATIONS LTD.

Main purpose: Maintenance Works & Special Projects at the New Athens International Airport V. PAROS VILLAGE LTD.

Main purpose: Development and commercial management of a residential complex (holiday homes) on the Island of Paros

The group undertook a wide variety of projects ranging from hospitals/clinics, commercial complexes to mixed-use developments, industrial, residential, as well as infrastructure projects. A list of selected projects for each specialist category has been prepared and is attached in the Appendices. A complete list of all projects undertaken by the group can be provided upon request. MEP PROJECT MANAGER

GNOMON S.A. (Construction Company)

Athens, Greece 1992 – 1997

Project managed all the Mechanical and Electrical Works undertaken by the company as well as the Maintenance services that usually followed thereafter. Duties and responsibilities included, assisting with the preparation of tenders, contract negotiations, site mobilization, site supervision, ensuring quality control, testing, commissioning and handing over of the works, the preparation of interim payment applications, variations and the settlement of final accounts and any contractual claims, the preparation of internal cost and progress reports, adhering to contractual timeframes/programs and the appointment, co-ordination and monitoring of activities of sub-contractors. A list of selected projects has been prepared and is attached in the Appendices. MEP CONSTRUCTION MANAGER

ERGOPENDYTIKI LTD. (Construction Company),

Athens, Greece 1994 – 1996

Supervised and managed exclusively the tendering and construction process of various new stores that were being constructed by the company for the DIA supermarket chain in Athens. Duties and responsibilities included, assisting with the preparation of tenders including the measurement of quantities, site mobilization, site supervision, ensuring quality control, testing, commissioning and handing over of the works, the preparation of interim payment applications, variations and the settlement of final accounts and any contractual claims, adhering to contractual timeframes/programs and the appointment, co-ordination and monitoring of activities of sub-contractors.

ELECTRICAL ENGINEER – DESIGNER

FREELANCE,

Athens, Greece 1991 – 1992

Prepared the designs and specifications for the Mechanical and Electrical Installations for numerous small and medium sized projects during the process of obtaining planning permission and the appropriate building permits.

4

CV – Stavros D. Chatzoulis

4

A P P E N D I C E S

5

CV – Stavros D. Chatzoulis

5

A P P E N D I X I:

HELLENIKI MICHANOLOGIKI SA

H O S P I T A L S

§ RED CROSS HOSPITAL

Design & Construction of NEGATIVE PRESSURE BOOTHS (Negative room pressure) in the KEEL, 1 Athanasaki Street, Athens, Greece.

Negative room pressure is an isolation technique used in hospitals and medical centers to prevent cross-contamination from room to room. It includes a Ventilation & A/C System that generates negative pressure to allow air to flow into the isolation room but not escape from the room and BMS with very sensitive sensors that control all the installations

§ PGNA (GENERAL GOVERNMENT OWNED HOSPITAL ATHENS) / HOSPITAL Design & Construction of NEGATIVE PRESSURE BOOTHS (Negative room pressure) in General Government Owned, 154 Mesogion Avenue, Athens, Greece. Negative room pressure is an isolation technique used in hospitals and medical centers to prevent cross-contamination from room to room. It includes a Ventilation & A/C System that generates negative pressure to allow air to flow into the isolation room but not escape from the room and BMS with very sensitive sensors that control all the installations

§ ATHENS GENERAL CLINIC

Change of the existing offices and construction of new General Surgery at the clinic in Athens, Greece. The works included all the Electromechanical Installations.

§ EUROCLINIC ATHENS

Construction of new offices in the existing building. B A N K S

§ BANK OF AMERICA

Construction of new Headquarters Building at Korai Square, Athens, Greece. The construction also included the new Main Computer Room with the Central Server and the new Dealing Room of the Bank.

These installations included all of the Mechanical and Electrical systems as follows: o Cooling System with two (2) Close Control Units

o Duty & Standby Power Generators System with two (2) Generators o Uninterruptable Power Supply with two (2) UPS

o Main Distribution Panel Boards and Sub-Distribution Panel Boards and ATS o Remote Management of all the installations with Building Management System (BMS) o Fire Protection and Detection System with FM – 200 and Fire Alarm System o LV and Small Power installations

o IT System

o Raised antistatic floor

Preventive Maintenance and Standby Services on a 24 hour per day basis for 365 days per year.

§ SOCIETE GENERALE BANK

Construction of a new back-up Main Computer Room with the Central Server as well as a new back- up Dealing Room at a discreet location in Marousi, Athens, Greece in the event of emergency operations.

These installations included all of the Mechanical and Electrical systems as follows: o Cooling System with two (2) Close Control Units

o Duty & Standby Power Generators System with two (2) Generators o Uninterruptable Power Supply with two (2) UPS

o Main Distribution Panel Boards and Sub-Distribution Panel Boards and ATS o Remote Management off all the installations with Building Management System (BMS) o Fire Protection and detection System with FM – 200 and Fire Alarm System o LV and Small Power installations

o IT System

o Raised antistatic floor

Preventive Maintenance and Standby Services on a 24 hour per day basis for 365 days per year.

§ SOCIETE GENERALE BANK

Installation of B.M.S at all the branches of the Bank together with an online connection to the central B.M.S. of the Headquarters Office Building.

§ HELLENIC BANK

Construction of a new branch in Aspropirgos, Attica, Greece.

§ LAIKI BANK

6

CV – Stavros D. Chatzoulis

6

v Extension of the banking establishment on the 63rd Heroes Politexniou St. & Skoyze, Athens, Greece

v Reconstruction of offices of AEDAK on 5 Voulis in Athens.

§ NATIONAL BANK OF GREECE

Reconstruction of the branch on Alexandras & Fanarioton Streets, in Athens. I N D U S T R I E S

§ K.KARDASILARI AND SONS S.A. / FOOD

Construction of the complete Mechanical and Electrical installations at the new factory located in Schimatari, Viotia

§ VELCO – K. PLATIS S.A. / FOOD

Installation of a state of the art Air Conditioning system (heating & cooling) in the production and storage areas of the industrial plant

§ GR.SARANTIS S.A. / COSMETIC

Extension of the existing Mechanical and Electrical installations into the new cosmetics production areas of the factory located in Inofita, Viotia

§ FOURLIS TRADE A.E.V.E.

Fire Protection works of the warehouse located at Inofita, Viotia.

§ AVEPE (VARAGIS) SA

Taking over – Starting up Electromechanical Installations of the factory in the Schimatari,Viotia.

§ KOTSOVOLOS GROUP S.A.

Electromechanical Work of warehouse in Inofita, Viotia. R E S T A U R A N T S

§ ILTA ELLAS A.E.

The construction of a new building with a restaurant at the ground floor at 48 Armatolon & Klefton, Athens, Greece.

§ EFG EUROBANK PROPERTIES A.E.

Construction of a new restaurant within an existing office building on the corner of Ag. Konstantinos and Kifissias Avenue, Maroussi.

A R T G A L E R Y

§ ILTA ELLAS A.E.

The construction of a new building with an art gallery at 48 Armatolon & Klefton, Athens, Greece. T V S T U D I O S

§ ATHENS OLYMPIC BROADCASTING S.A.

Design and Construction of the interior of the International Broadcasting Centre (IBC) in the OAKA complex so that it can be used by the International Broadcasting Institutions for radio and television productions during the Olympic Games of 2004 in Athens. The works also included the installations for IT and Telephones. O F F I C E S – S T O R E S

§ FASHION CAR S.A.

The construction of a new seven storied office building complete with showrooms and 3 basement levels

§ COMPTON HOUSE HELLAS S.A.

Constructions of three (3) new Toy Stores for ELC together with offices and warehouse space all of which were located in Athens at 168 Vouliagmenis Avenue, Glyfada; The Mall in Marousi and Kifissia

§ PICAR S.A.

The refurbishment and restoration of the entrance lobby of the PALLAS Theatre in central Athens

§ ALPHA BROKER'S INSURANCES S.A.

Fitting out of new office building at Kantharou & Efplias Streets, Akti Miaouli, Piraeus

§ SONY TELECOM CLUB

Fitting out of offices and showroom on Mesogion Avenue, Athens

§ WACKENHUT HM (USA Security Company)

New office building in Metamorphose, Athens

Construction of the new Headquarters building at Metamorphose, Athens The construction included the new Main Computer Room with the Central Control Room (CCTV and Customer’s Alarm Room).

These installations included all of the Mechanical and Electrical systems as follows: o A/C and Ventilation System with

7

CV – Stavros D. Chatzoulis

7

o Duty & Standby Power Generators System with one Generator o Uninterruptable Power Supply with one UPS

o Main Distribution Panel Boards and Sub-Distribution Panel Boards and ATS o Remote Management off all the installations with Building Management System (BMS) o Fire Protection and detection System with FM – 200 and Fire Alarm System o LV and Small Power installations

o IT System

o Raised antistatic floor

§ BODOSAKIS FOUNDATION

Construction of a new sub-station at the existing offices located along Amalias Avenue, Athens

§ ZANNIO FOUNDATION CHILDREN'S PROTECTION AND EDUCATION Refurbishment of the Primary School at 131 Thiseos Street in Ekali. R E S I D E N C E S

§ CYBARCO A.T.E.

The Mechanical and Electrical installations for an 11 storey residential blocks in Zografou, Athens

§ KONSTANTINOS EVRIPIDIS

Construction of a new two-storey detached private residence complete with two basements and swimming pool located along Mitr. Grig. Kidonion Street, Rodopoli, Dionysos, Athens

§ ODYSSEUS KYRGIAKOPOULOS

Construction of a new private swimming pool located in P. Psychiko, Athens M E T R O

§ Α. ATHENS ELECTRIC RAILWAYS – (METRO LINE 1)

VICTORIA STATION (Underground Station)

Construction of all the electrical, mechanical and piping installations at the station and the tunnel o MV substations

o LV distribution switchboards and network

o UPS equipment for other electrical installations o Lighting installation and emergency lighting System o Controls, Communications and Operations installations o Access control, CCTV

o Third rail power system

o Sanitary and waste drainage

o Sumps and pumps systems

o Fire Alarms Systems

o Tunnel Ventilation

o Fire Fighting Systems

o Sumps and Pumps Systems

o Lifts, Escalators

§ B. ATHENS ELECTRIC RAILWAYS – (METRO LINE 1)

MONASTIRAKI STATION (Underground Station)

Construction of all the electrical, mechanical and piping installations at the station and the tunnel o MV substations

o LV distribution switchboards and network

o UPS equipment for other electrical installations o Lighting installation and emergency lighting System o Controls, Communications and Operations installations o Access control, CCTV

o Third rail power system

o Sanitary and waste drainage

o Sumps and pumps systems

o Fire Alarms Systems

o Tunnel Ventilation

o Fire Fighting Systems

o Sumps and Pumps Systems

o Lifts, Escalators

§ C. ATHENS ELECTRIC RAILWAYS – (METRO LINE 1)

FALIRO STATION (Ground Station)

Construction of all the electrical, mechanical and piping installations at the station and the tunnel o MV substations

o LV distribution switchboards and network

o UPS equipment for other electrical installations 8

CV – Stavros D. Chatzoulis

8

o Lighting installation and emergency lighting System o Controls, Communications and Operations installations o Access control, CCTV

o Third rail power system

o Sanitary and waste drainage

o Sumps and pumps systems

o Fire Alarms Systems

o Tunnel Ventilation

o Fire Fighting Systems

o Sumps and Pumps Systems

o Lifts, Escalators

9

CV – Stavros D. Chatzoulis

9

A P P E N D I X II:

HELLENIKI MICHANOLOGIKI MAINTENANCE SERVICES SA

M E T R O

§ METRO of ATHENS

Included all the Stations, the Tunnels, the Depot and the Operations Buildings o Preventative Maintenance of all the Mechanical and Electrical installations o Repairing Maintenance of all the all the Civil, Mechanical and Electrical installations o Construction of many projects like:

Infrastructure

Buildings

Special Electromechanical installations

H O S P I T A L S

§ LATSIO BERN CENTER HOSPITAL

All campus buildings

I N S T I T U T I O N A L / O R G A N I Z A T I O N S

§ ATHENS METRO

All the Stations, Tunnels, Buildings, and the Depot.

§ ECONOMIC UNIVERSITY OF ATHENS

All campus buildings

§ ATHENS COLLEGE

All campus buildings

§ COMMERCIAL AND INDUSTRIAL CHAMBER OF ATHENS

Headquarters building

B A N K S

§ SOCIETE GENERALE BANK

Headquarters building and all branches in Athens

§ BANK OF AMERICA

Headquarters building in Athens

§ NATIONAL BANK OF GREECE

Headquarters building in Athens and the branches in the Western Region of Greece

§ OMEGA BANK

All branches in Greece

F A C T O R I E S

§ GR. SARANTIS S.A. (COSMETICS INDUSTRY)

Factory in Inofita, Viotia

§ ΑVEPE S.A. (VARAGIS FURNITURE MANUFACTURERS)

Factory in Inofita, Viotia

§ K.KARDASILARI AND SONS S.A. (FOOD INDUSTRY)

Factory in Viotia

V A R I O U S

§ GERMANOS GROUP (TELECOMMUNICATIONS FIRM)

All branches of the “Multirama” chain of stores in Athens

§ KLONATEX GROUP OF ENTERPRISES S.A.

Headquarters building in Athens

§ TUV HELLAS

Headquarters building in Athens

§ RECKITT BENCKISER HELLAS CHEMICAL A.B.E.E.

Headquarters building in Athens

10

CV – Stavros D. Chatzoulis

10

A P P E N D I X III:

HME LTD

A I R P O R T S

§ ATHENS INTERNATIONAL AIRPORT

o Construction of many projects like:

Infrastructures

Buildings

Special Electromechanical installations

o Preventative Maintenance of all the Mechanical and Electrical installations o Repairing Maintenance of all the all the Mechanical and Electrical installations 11

CV – Stavros D. Chatzoulis

11

A P P E N D I X IV:

GNONON SA

B A N K S

§ SOCIETE GENERALE BANK

The construction of a new Headquarters office building and main branch in Greece at Kifissias Avenue, Psychiko, Athens. Part of this project was the Main COMPUTER ROOM of the Bank in the country and the Dealing Room.

The installation included all of the Mechanical and Electrical systems as follows: o Cooling System with three (2) Close Control Units o Duty & Standby Power Generators System with two (2) Generators o Uninterruptable Power Supply with two (2) UPS

o Substation, Main Distribution Panel Boards and Sub-Distribution Panel Boards and ATS o Remote Management off all the installations with Building Management System (BMS) o Fire Protection and detection System with FM – 200 and Fire Alarm System o LV and Small Power installations

o IT System

o Raised antistatic floor

§ NATIONAL WESTMINSTER BANK

Construction of the Main COMPUTER ROOM of the Bank in Greece at Kifissias Avenue, Psychiko, Athens.

The installations included all of the Mechanical and Electrical systems as follows: o Cooling System with three (3) Close Control Units o Duty & Standby Power Generators System with two (2) Package Generators o Uninterruptable Power Supply with two (2) UPS

o Substation, Main Distribution Panel Boards and Sub- Distribution Panel Boards and ATS o Remote Management off all the installations with Building Management System (BMS) o Fire Protection and detection System with FM – 200 and Fire Alarm System o LV and Small Power installations

o IT System

o Raised antistatic floor

Preventive Maintenance and Standby Services on a 24 hour per day basis for 365 days per year.

§ NATIONAL WESTMINSTER BANK

Construction of the new Dealing Room of the Bank at the headquarters offices in Greece at Korai Square, Athens.

The installations included all of the Mechanical and Electrical systems as follows: o Heating, Cooling & Ventilation System

o Duty & Standby Power Generators System with two (2) Package Generators o Uninterruptable Power Supply with two (2) UPS

o Substation, Main Distribution Panel Boards and Sub- Distribution Panel Boards and ATS o Remote Management off all the installations with Building Management System (BMS) o Fire Alarm System

o LV and Small Power installations

o IT System

o Raised floor

Preventive Maintenance and Standby Services on a 24 hour per day basis for 365 days per year. O F F I C E S

§ RENAULT

o The construction of a new office building and show room in Halandri, Athens, Greece. This building was the Headquarters of the company in the country. The construction also included the new Main COMPUTER ROOM with the Central Server.

o The construction of a new office building and show room in Glyfada, Athens.

§ GEMA SA

The construction of a new office building and retail space in Psychiko, Athens.

§ SONY HELLAS SA

The construction of a new office building and show room in Psychiko, Athens. This building was the Headquarters of the company in the country. The construction also included the new Main COMPUTER ROOM with the Central Server.

§ UNITED DISTILLERS OF GREECE SA

Fitting out of new Headquarters in Halandri, Athens, Greece. 12

CV – Stavros D. Chatzoulis

12

The project included all of the Mechanical & Electrical installations of the new offices. The construction also included the new Main COMPUTER ROOM with the Main Server. S P O R T A R E N A

§ MUNICIPALITY OF DAFNI, ATHENS

The construction of a new indoor Basketball Arena in Dafni, Athens, Greece.