NITHIYANANTHAN.P
#***, ********* *****, ******* ****
Athur-603101. +919********* Kancheepuram District. Email Id *************@*****.***
Career Objective :
To contribute to a progressive organization, by delivering my strong expertise in Planning, Erection, Commissioning and Maintenance of Electrical and Electronics system with my mix of people, process and functional domain strengths.
INJECTIONE MOULDIG MEACHINE EXPERIANCES :
L/T: 250T,350T,550T
FM; 110T,180T,150T,200T,550T,660T,910T
jsw; 350,450,550
L/S: 1800T,1300T,1400T
haitain 1600,1400
super mass 850.600
winsor,850
negri bose 150
Professional Work Experience: (5 Years)
ELETRICALE PROJECT
POWER CHANGE 11KV
POWER CHANGE 33KV
DG 1000KVA,750KVA,500KVA&150KVA
PLC PROBLEM
CHILLING UNIT AHU,VU,&EXHAUST
AIR COMPRESSER 6 BAR TO 30 BAR
WATER COLLINGAND AIRCOLLING CHILLER
COLLINGE TOWER
HRC
HOPPER DRYER
WATER TREATMENT
EOT CRANE 5 .TONE TO 20TONE
Roles And Responsibilities:
Coordination with production team for the planning for preventive maintenance & Utilities Works such as HT switchgears consist of VCB breakers, MCC, HT/LT Motors with HT cable (11kv),11kv/415 kV Power/Distribution Transformers, UPS, Battery charger, SMPS, VFD with battery bank
A work such as HT switch gears consist ofVCB breakers,MCC, HT/motor with HT cable A work such as HT switch gears consist ofVCB breakers,MCC, HT/motor with HT cable A work (33kv),33kv/415kv Power/Distribution Transformers,UPS,Battery, SMPS, VFD with battery bank
Auto power change over 33kva
DG Set with AMF panel & Plant Lighting.
Troubleshoots plant electrical problems to determine their cause and recommends options for eliminating such problems. Includes carrying out tests on equipment.
Capable of guiding/leading the electrical maintenance team and implementing the best maintenance strategy for the plant including High voltage of 11KV system.
Continuous Monitoring and Predictive maintenance of critical equipment and corrective actions to avoid breakdown.
Planning for resources and manpower for planned shutdown of the plant and execution including start-up.
Daily Power monitoring, calculations and reporting at monthly basis.
Material procurement through SAP and maintaining minimum spares for attending breakdown and reducing breakdown time.
Awareness on Hazardous area classifications and selection of electrical equipment.
Coordination with various departments for smooth functioning of the equipment by feedback and suggestions from them.
ISO documentation, Quality Circle formation for detecting problems and solving from shop floor employees.
PARKE TIME WORKE:
MEACHINICALE,
PLUMBINGE,
HVAC
MOBILE SERVICE
Academic:
H.S.C.
ST.COLUMBAS HR.SEC.SCHOOL.CHENGALPATTU
75%
D.E.E., (2012)
BPT Polytechnic College
50.5%
Computer Skills :
POWER POINT
MS – Office & MS-word
MOBILE HARD WARE
PERSONAL DETAILS:
Date of Birth : 28th MAY 1991
Father’s Name : Mr. PANNERSELVAM.T
Nationality : Indian
Languages Known : Tamil & english
Date: P.NITHYANANTHAN