GARY J. MCDONNELL
*** ******* **** ***** 012********
GREAT BARR MOBILE 075*-*******
BIRMINGHAM
B42 1EJ
PROFILE
Fully qualified electrician, with 23 year experience of industrial and domestic electrics who enjoys working within a team, or equally at home working and prioritising own objectives. Excellent time management skills who enjoys new challenges. 100% Committed to getting the job done within a timing plan or schedule without comprising health and safety and within budget.
WORK HISTORY
Auto Tech 2011-Present Day
Principle Row
Full Commissioning of Robot Cells Within JLR
Hard Ware And Software package (Allan Brady)
Modification and rewrite of PLC using DCP Charts. (Allan Bradley Plc ) Working to the Ford Standard (DCP)
Integration of CMU with PLC
Fault finding on new and old installations working off E-plan drawings
Testing PLC programs to JLR Safety Standards And ensuring Everything is Signed off on the robot cells so the Robot cells can go into full operation using their staff
APRIL 2000 To August 2011
APRIL 2000 To 2011
MANUFACTURING ENGINEER
UYT
Renown Drive, Coventry
Working within the automotive industry, Project work to improve processes and production, working on modifications to weld & press projects liaising engineering personnel within an international company, working off electrical diagram’s to modify PLC s, rewriting programmes for Nachi and Fanuc robots. All projects have to be completed on tight timescales and with budget. In-depth modifications on touch screens for the manual operation of weld cells, press touch screen vision soft ware (VT,VT2,MT250 &Pro Face)
Problem solving during implementation of new machinery, and snagging afterwards
Maintenance of 1800,600,200 production presses, emergency cover for maintenance department, dealing with breakdowns of production machinery. Prior role maintenance engineer.
UNIPART KAUTEX
1998 TO 2000
Renown Drive, Coventry
MAINTENANCE TECHNICIAN
Working within a busy maintenance team, reacting to breakdown situations, working with plastic blow moulding machines used in the manufacture of petrol tanks for Honda and Rover. Working a Total preventative measures system. PLC diagnosis Siemens s7
AES (UNIPART)
1995 TO 1998
TIPTON, WEST MIDLANDS
MAINTENANCE TECHNICIAN
Working within a busy three shift maintenance section, responsible for the continued
Production of Toyota car parts. Ensuring minimum down time of machinery due to mechanical faults. Fault diagnosis of CNC machinery.
QUALIFICATIONS
Official installer of V Phase
EAL (EMTA) cert No 96569902 part P
CERTIFICATE FOR Domestic Electrical installers 100/4501/6
UNITS
F/102/7127, J/102/7128,L/102/7129,F/102/7130,J/102/7131,L/102/7132,R/102/7133.
Y/102/7134,D/102/7135,H102/7136,K/102/7137,M/102/7138,T/102/7139,K/102/7140
M/102/7141,T/102/7142,A/102/7143.
CITY AND GUILDS
BASIC INSTALLATION PRACTISES AND TECHNOLOGY
ASSOCIATED ELECTRONICS TECHNOLOGY
ELECTRICAL INSTALLATION THEORY AND PRACTISE PART TWO
BS 7671:1992 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
(IEE WIRING REGULAIONS, 16TH EDITION)
ELECTRICAL INSTALLATION THEORY AND PRACTICE PART 1
BS 7671:2008 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
(IEE WIRING REGULAIONS, 17TH EDITION)
FANUC ROBOTICS RJ3 ELECTRIAL MAINTENANCE
PILZ MACHINE SAFETY COURS (CITY AND GUILDES.)
CERTIFICATE OF ROBOT TRAINING (aw operation & programming) NACHI UK LTD
2391 Testing and Inspection practical passed
LOTUS 1-2-3 Basics
LOCKWELL Mitsubishi GX Developer programming with A Series & FX Series PLCS PT 1
FORK LIFT TRUCK BASIC TRAINING.CAPACITY 2,000KG.SIDESHIFT
COMPETENT PERSON AT LV&11/Kv substation entry and supervision
First aid appointed person 29th June 2008 till November 2013
MCS Photovoltaics Installation and commission 9/08/2011
MCS Working at heights 9/08/2011
MCS C.o.s.s.h 9/08/2011
MCS Manual Handling 9/08/2011
INTERESTS
Helping with my 2 children
Socialising Keep Fit