Post Job Free

Resume

Sign in

Mechanical Engineering Management

Location:
India
Salary:
as per your nomes
Posted:
October 18, 2016

Contact this candidate

Resume:

Vishal kumar

#**, **** ******, ****** *****. Haryana

Mobile:-917*********

E-mail:- acw35s@r.postjobfree.com

Professional snapshot

Overviews and Objective:-

Creative, dedicated and proactive SCM professional having almost 2 year and 6 month of Experience in the material management & procurement. Presently designated as an Executive-SCM in the Honda Car India Ltd. Through professional with experience in the operations and people management with key focus on optional utilization of technical and manual. I, with my total dedication and discipline, had achieved the Goal and Objective during the tenure of assignment both as an individual and team

Work Experience: (5.6 years):-

Presently working with HONDA CARS INDIA LTD, as Executive Dec’2013 to till date at Tapukara, Bhiwadi Plant.

Previous company experience

Previous working with M/S AMTEK TAKEFOR AUTOMATIVE LTD. It has technical collaboration with neumayer tekfor (GERMAN) manufacturer of Fracture CON ROD, Their regular customer: - SPIL, TATA, JCB, FIAT (Itly),FM(Russia). I joined here as GET from Sep’2010 to Sep’2011. After that worked as team leader Sep’2011 to Sep’2013.

Profile – Executive-SCM( Material Management & Procurement) in HONDA CARS INDIA LTD.

Presently designated as Executive –SCM(Material Management & Procurement) in parts logistics control (Power Train) at Honda Cars India Ltd. Tapukhera, Bhiwadi Alwar(Rajasthan) having responsibility of material requirement planning as oer production plan for fulfillment of Transmission assembly line, shop floor coordination, maintaining proper FIFO during Dispatch of gear box as per plan, inventory management of gear box & analyzing release of critical parts on daily and weekly basis, rejection control, responsible for sending rejected parts to supplier and also coordinating with supplier for delivery of required parts at right qty and on right place. Preparing PDCA on monthly basis, ensure FG received by line side would be delivered at right time during engine assembly at main line, Procurement of polycover, bins, trolley accessories like towing bar, moving wheels, fixed wheels, iron locks and also responsible for trolley maintenance at right time, also responsible for cross checking the ills. New event parts and model coordination, Ensure all child parts would be available before Event starts after crosscheck by parts quality section.

Responsible /Accountabilities:-

1.Plan: - layout planning for child parts storage, Monthly PDCA preparation, SOP preparation, Dispatch plan, and Material plan as per production and share to supplier for delivery at right time.

2.In-bound: - managing procurement of receiving of child parts and raw material required for the assembly of Transmission case of different models of cars from local suppliers and overseas sources as per planned schedule.

3.Quality Check:- Ensuring that the parts received from local suppliers is checked by parts Quality check section for quality checks inspection before feeding to production line as per check sheet.

4.Store/ Warehouse Inventory: - Storing of parts received from parts quality check section at the correct storing rack address as per the receiving date and LOT wise to maintain FIFO and easy traceability of part.

5.Line feeding:- Managing delivery of right parts and right location to the production line at right time without stoppage of line as per job card and production plan of the day.

6.Rejection Control:- Ensure parts rejected by parts quality check section and line side rejected parts to be sent back to supplier with rejection note and with proper documentation and also ensure all rejection invoice would be submit to finance deptt for debit.

7.Inventory Control: - Monitoring the proper documentation of all transactions of materials and preparing the critical parts list for the planned production of various models of cars (Petrol and Diesel) and informing to all officials for in time procurement without stoppage of production. Monitoring physical cycle count of all parts and making stock reconciliation of inventory management.

8.Liaison activities:- Attending the cross functional (CFT) meeting with Quality, supplier readiness, management team, engineering dept, supplier quality management team, logistics team etc.

9.Supplier Delivery:- Evaluating delivery rating of suppliers performances and initiate corrective action for supplier Delivery Performance improvement.

10.Procurement of trolley accessories: - procurement of polycover, Bins, Trolley accessories like towing car, moving wheel, iron locks sand also responsible for trolley maintained for delivery on line side for packing FG parts.

11.New model event parts coordination:-Liaison with NPD and PQ section ensure unique parts in upcoming model and also ensure parts would be available in OK condition at the event day.

12.Trouble report:- Responsible for rising trouble report to local and global supplier for quality issue like rust and packaging issue also for any standard deviation and also ensuring their counter measure by concerned supplier.

13.Training and Refresh Training:- proper training and frequent refresh training to fresher, sub-ordinates and 3 PL staff as per the training schedule to follow the SOPs for smooth function of the production line.

14.Use of 5M:- proper managing of Manpower, Material, Machine, Method and Money for the smooth function of the section as per the Material Management concept,

Professional Achievement:-

Successfully conducted 4 new events ( 2CB,2WD,2TQ,2SJ)

Promoted as Team Leader for Transmission SCM.

Handling a team leader of 2 supervisor and 34 casuals.

Operational of line (Transmission line without stoppage)

IT Skill:- knowledge MS Office, Power point, internet application

Academic profile:-

Degree

School/ College

Univ./ Board

%age

B-Tech in Mechanical Engineering

Swami Vivekananda Engg. Institute & Technology

Punjab Technical University (Jalandhar)

70

Diploma in Mechanical Engineering

Govt. Polytechnic, Ambala City (Haryana)

Haryana Technical Board (Chandigarh)

60

Metric

New Happy Sr. Sec. School

(Yamuna Nagar)

Haryana Board (Bhiwani)

63

Extracurricular Activities:-

Working as a team leader on “Collage Events”

Working as volunteer in school time for discipline.

An active member of RUN FOR NATION.

Personal Details:-

Date of birth : 2 May 1985

Marital status : Married

Father’s Name : Sh. Jeewan lal

Nationality : Indian

Permanent address : # 20, Bank Colony, Yamuna Nagar (HR)

Languages known : Punjabi, English, Hindi

Strengths : Readiness to walk extra mile to achieve Excellence, Hardworking, Confident, Punctual

Hobbies : Listening to soft music, Travelling.

Declaration:-

I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibilities for correctness of the above-mentioned particulars.

Place: ( Vishal Kumar)



Contact this candidate