Vikrant Mehar
**** ** **** **** ***********, FL *2608 acw1mj@r.postjobfree.com 480-***-****
Summary - Construction Engineering graduate with 2 years of experience, seeks a full time position, utilizing technical skills and experience in construction industry
Software Skills
Microsoft Office, Project 2013, Primavera P6, Micro station, ArcGIS, CAD, Prolog, Timberline
Education
Masters
Master of Science in Construction Engineering – Arizona State University Aug 2014 – May 2016
GPA – 3.5
Bachelors
Bachelor of Technology in Civil Engineering – College of Engineering Pune, India Jul 2008 – May2012
GPA – 4.0
Experience
University Technology Office – Arizona State University
Technology Consultant (Student Worker) Sep 2014– May 2016
Assisted clients with; troubleshooting Windows & Mac operating system issues, software installation, virus scans, and also educating them about newer technologies
Assisted students with educational technologies along with providing technical support in computing sites, classrooms, learning studios, and collaborative spaces
Black & Veatch Construction Pvt. Ltd. Pune, India
Project Engineer Jul 2012 – Jul 2014
Project Scheduling, maintaining & tracking logs – change orders, RFI’s and submittals
Reviewed contract drawings, specifications and participated in cost & budget meetings
Generated project bill of quantities and float analysis
Studied purchase orders and assisted in negotiating assigned subcontract
Developed and updated project documentation, and maintained thorough understanding of the provisions and requirement of all contract documents, including plans, specifications, purchase orders and contracts
Estimated concrete and steel take-offs for underground trenches, drains, roads, foundations etc.
Prepared calculations and designs associated with structural members and connections
Developed design details and specified appropriate construction materials
Coordinated construction quality control services between the design team and client
Projects
1.Projects during my time in Black and Veatch as a Project Engineer (2012-2014), Pune office, India
Therma south energy Units 1 &2 ( 2 x 150 MW Coal fired Power plant); Davao, Philippines Jun 2013 – Jul 2014
Responsible for estimation, scheduling, design calculations, drawings review, RFI submittals, material procurement, tracking project expenditures, and reviewing change orders.
Design and drawing reviews of the following elements - Tank Clarifiers, Steel Pipe rack, Tank Foundations, Site Grading, and Storm Water Drains.
Software used – Risa 3d, Staad Pro, MS Project, Primavera, Auto CAD
IOCL Ennore, (LNG Regas Terminals) Tamil Nadu, India Dec 2012 – Jun 2013
Responsible for estimation, minutes of meeting, cost analysis, scheduling, co-ordination with Mechanical and Electrical departments regarding underground trenches and ducts, drawings review, RFI submittals, tracking project expenditures, and reviewing change orders.
Software used – Timberline, MS Project, Primavera, MS Office
Solar PV, 110 MW, California, US Jul 2012- Dec 2012
Responsible for scheduling, minutes of meeting, client meetings, hydrology model simulation and design, RFI tracking and submittals, estimation of materials and man hour scheduling.
Software used – Arc GIS, HEC HMS, MS Project, Primavera, MS Office
2.Projects during my time as a Masters student (2014-2016), Arizona State University, US
Implementation of BIM (Building Information Model) Process (Research Project) Dec 2015
Execution of Front End Planning process in the Project Information Model (PIM) phase & Zero Accident Techniques in the Asset Information Model (AIM) phase for a given scenario
Project Management and Leadership Experience (Research Project) May 2015
Partnered with a professional organization to support them in improving their business process and organizational performance while using the techniques of deductive logic and Lean principles
Construction Productivity (Semester-long project) Dec 2014
Calculated productivity of a construction process at a commercial construction site, based on the data collected over a period of three weeks. Analyzed the trends and came up with causes of low productivity in a 28-page report
Cost Estimation of a Residential Property Dec 2014
Detailed cost estimation of a residential property, including substructure and superstructure, HVAC, interiors and labor rates for location (Tempe, AZ) was developed using Success Estimator and excel spreadsheet.
Professional References:
NAME EMAIL PHONE TITLE/COMPANY RELATION
Rakshit Raghavan acw1mj@r.postjobfree.com 480-***-**** Controls Engineer/Cumalite Former Supervisor
Anurag Bura acw1mj@r.postjobfree.com 716-***-**** Structural Engineer/Nitterhouse Former Supervisor
Pallavi Deshmukh acw1mj@r.postjobfree.com 540-***-**** Engineer/CISCO Colleague