Objective Senior Construction Management Position

Expertise Construction, Planning, Estimating and Scheduling Specialist, Safety Supervisor,

Operations Management.

Highly motivated and dedicated professonal. Well developed communication skills. Effectively establishes rapport with individuals of diverse backgrounds and experience levels from apprentice plumbers to members of United States Congress. Astute in environmental regulations and laws and able to take cutting edge technologies and incorporate into infrastructure and facilities. Hold EM385 40 hour Safety and USACE Quality Control Manager certifications. Held Certified General Contractor license in state of Florida. Maintained Department of Defense “Secret” security clearance. CPR Certified.

Summary of

Experience

2015-present Owner

Solon Springs Enterprises, LLC. Yuma, AZ

Provide construction management services for government projects. Employed maximum of six people in jobs ranging from Construction and Project Managers to Superintendents, SSHO’s and QCM’s.

2014-2015 Project Manager

Perez Corporation, MCAS Yuma AZ

Act as Project Manager supervising four Superintendents during execution of various MILCON, 8A, JOC, IDIQ and sole-source projects. Aggregate program totals approximately 7 million dollars/FY. Closely monitors all Safety/QCM/Environmental and building code requirements. Work very closely with ROICC/I&L personnel throughout all phases of projects including design, scope of work development, budget/estimating, scheduling and implementation of safety/QCM protocols during work in place execution. All projects come in on-time and within budget.

2009-2012 Senior Facilities Manager and Engineering Lead

Department of Defense, United States Marine Corps, MCAS Yuma AZ

Civil Engineering Lead responsible for the implementation of $350 Million in new construction in support of the Joint Strike Fighter Task Force located on Marine Corps Air Station Yuma AZ. Instrumental in development and construction of master plan involving base-wide communication, water, waste, road and runway improvements. Managed the development of 5 new buildings: F-35 flight test simulator building (68,000 SF), two (2) state-of- the-art maintenance and administration hangars (54,000 SF each), communications center (52,000 SF) and a flight tower simulator building (27,000 SF). Additionally managed design and construction of 10,000 foot auxiliary landing field. All projects were fostered from concept to construction completion to include environmental and noise impact studies. Managed design and construction of new Arizona Public services substation to serve added total electric load. All projects attained LEED Gold certification and were constructed simultaneously, on time and within budget. Acted as member of team assembled to investigate facility readiness for Israeli Air Force integration of F-35.

6/06-2009 Construction Manager

Graham Construction, LLC- Sarasota, Fl

Responsible for construction program totaling approximately 15 million dollars. Includes Jobsite Superintendent/Project Manager for Lighthouse Toyota in St Augustine, Fl. Also responsible for preconstruction planning, Permitting, final site plan approval and from the ground up, onsite construction management for Wingate Hotel in Manatee County/Bradenton, Fl as well Toyota of Elizabeth City, NC. All projects were completed on-time and within budget.

7/05-6/06 Vice President of Construction

National Construction Services, Inc. – Jacksonville, Fl

Responsible for over 7.5 million dollars of commercial/office construction in various locations throughout Florida. Projects range from hurricane recovery/remodel for Pete Moore Chevrolet in Pensacola, Fl to an education center for a United Methodist Church in Lake Placid, Fl. Manage four superintendents as well as perform project management duties. Implemented new safety program in addition to restructuring Superintendent procedures and promulgating a new Superintendent handbook. Rewrote Company Safety Manual. Responsible for permit and final site plan approvals.

9/03-7/05 Project Manager/Superintendent

REC Construction - Jacksonville, FL

STT Construction Group – Jacksonville, Fl

PM/Super responsible for bidding and awarding subcontracts. Also responsible for permit expediting,

scheduling and construction of the following projects in Jacksonville:

MOE’S SOUTHWEST GRILL- five locations; Fruit Cove, Mandarin, Avenue’s, Atlantic, and Regency.

MA MA FU’S ASIAN HOUSE- Mandarin

RELAX THE BACK- Avenue’s Mall

CROSS CREEK STEAKHOUSE AND RIBS – Two locations; Baymeadows/9A and Lem Turner.

1/03-9/03 Operations Manager

Forever Fence – Jacksonville, Fl

Operations Manager responsible for all aspects of company grossing approximately 1.4 Million dollars per year. Duties include: Developing and implementing budgets for three separate divisions. Review and revise contracts. Make personnel decisions regarding hire, fire and salary considerations. Develop job descriptions and S.O.P’s for positions in company. Develop and implement safety program. Co-write employee manual. Responsible for scheduling installation crews. Order material for installation. Conduct final quality control job walks. Collect final payments. Negotiate cost of raw material.

4/00-12/02 Construction Superintendent

Contractor Management Group – Los Angeles, CA / Boston, MA

Site Superintendent for commercial, retail construction projects ranging from $100,000.00 to $750,000.00. Responsible for all facets of project including pre-construction job-site visit, subcontractor scope-of-work delineation, bid submittals and buyouts. Perform plan-check submittals and permit expediting. On site for entire project from demolition to turn-key client turnover. Day-to-day duties include subcontractor scheduling, job-cost tracking, project progress tracking, quality control, material delivery coordination and inspection walk-throughs.

4/98-4/00 Vice President / Production Manager

Entre Prises USA, Inc. – Bend, OR

Managed staff of 25. Administered an $871,000.00 budget encompassing four independent product divisions. Responsible for purchasing, production scheduling, safety programs, quality control, facility management and long-range facility planning. Leader of Continuous Improvement and Research and Development teams.

4/94-4/98 Project Planner / Manager

USN, Naval Special Warfare Development Group – Virginia Beach, VA

Project research, design, engineering and AutoCad 13 operations for maintenance and minor construction projects. Managed $650,000.00 construction program and budget. Developed and designed all construction projects including facility renovation, MILCON new construction, and Naval Reserve SEABEE construction program. Instrumental in design of multi-layered, hydraulic vehicle barrier system and in the design and manufacture of an advanced prototype laser sight system.

4/91-4/94 Engineering Office Manager

US Navy, Amphibious Construction Battalion One – San Diego, CA

Liaison to NAVPHIBASE Staff Civil Engineer, supervising 5 engineering technicians in various design projects including hazardous material mitigation area, refurbishment of a pier, renovation of 350 unit condominium, ceremonial platform, and Portside material storage area. Design and drawing of 2 vehicle wash racks (to meet updated environmental requirements), supervision of major pier-side lift/lash area outdoor lighting project, and design and construction of a hazardous material containment area, etc. Lead Engineer while deployed to Somalia during Operation RESTORE HOPE.

11/87-4/91 Planner

US Navy, Naval Mobile Construction Battalion Five – PT Hueneme, CA

Design and layout of a wide variety of projects in support of Desert Shield/Storm operations including camp headquarters for the 1st Marine Expeditionary Force, deployed camps, tent and fighting locations, material equipment and staging areas, ammunitions facilities, helicopter pads, layout of roads, drainage requirements, shower and galley facilities, metal k-span and pre-engineered buildings, etc.

REFERENCES: