Eng. Tewfik Benkerdou

** ** ******* ********

Ksar El Boukhari Medea 26300 Algeria.

Mobile: +213 (0-661-***-***

Email: **********@*****.**

** *****, *******, * ********

Driving license category (B)

More than 12 years experience in Construction, QA/QC, Pre-commissioning, Turnover / Mechanical Completion, Certification / Statutory Regulation and Third Party Inspection coordination of Oil & Gas EPC projects.

Depending on the position & project, I had to ensure some of the following duties:

• Lead / Attend meetings (coordination, progress, completion …etc)

• Preparations of reports / Status (daily / weekly…etc)

Review / Preparation of QA/QC documentation (Quality control plans, Inspection and Test Plans, Records ...etc); ensuring that these documents are in accordance with the project general specifications and applicable standards.

Construction, QA/QC, Pre-commissioning

Conduct / Schedule and follow-up of QC inspections.

Managing a team of supervisors, inspectors and test technicians to ensure the following Tasks: o Inspection of project materials and equipments at receipt on site to ensure their conformity with the project specifications.

o Ensure that all construction activities are in conformity with QA/QC documentation and the last revision of construction drawings (IFC).

o Ensure that all QC inspections are documented by reports properly filled and signed by all the parties involved in these inspections.

o Coordination with progress monitoring system team to keep a good tracking and recording of completed QC reports (PPCS/TOSTR/ICAPS/SICON).

o Follow-up and recording of all the anomalies, Technical Queries, damage reports and NCRs. o Follow-up and recording of all the modifications and deviations during construction phase for the preparation of the As Built documents & drawings.

Construction Management, Supervision & Monitoring DUTIES &RESPONSIBILITIES

PERSONAL DETAILS

of 4

Coordinate all site activities requiring ARH (Algerian Regulation Authority) intervention

(Correspondence, Technical and HSSE tests/inspections notifications, Delegations, Test records transmission, RFSU inspections, Energization / Hydrocarbon Introduction requests…etc) Certification / Statutory Regulation and Third Party Inspection coordination

Coordinate third Party equipments factory inspection. o Focal point of the whole MC process (coordination and monitoring of transmission, review and acceptance status of MC dossiers)

Turnover / Mechanical Completion

o QA / Technical review of MC Dossiers

o Perform Systems/Subsystems mechanical completion walk-down, identification and categorization of punch list items and follow-up of their clearance. o Preparation of loop folders.

o Review / Preparation and hand over of the project Documentation. August 2014 – April 2015 Deputy Project Manager / Site Manager Project: HBNS CPF Automation System Upgrade – Hassi Berkine Company: SEGITEC Process Automation Engineering & Services Client: Groupement Berkine (Sonatrach / Anadarko)

Contractor: Honeywell.

February 2012 – August 2013 QA Documentation Coordinator / QA-QC Coordinator Project: EL MERK(Mega project with a value of 5.2 billions $). Company: SAA (Sonatrach Anadarko Association)

Client: SAA

Six Lot Contractors for CPF, Offsites, Export Pipelines, Living Accommodation and Industrial Base, Power Sub-station, and Power lines June – December 2011 E&I QA/QC Engineer

Project: Southern Fields Development Project – In Salah Company: Petrofac

Client: ISG (In Salah Gas)

Contractor: Petrofac.

January – May 2011 Electrical Engineer.

Project: Viabilisation de la ville nouvelle de BOUGHZOUL Company: Groupement de Daewoo

Client: Etablissement public de la ville nouvelle de Boughzoul Contractor: Groupement de Daewoo.

PROFESSIONAL EXPERIENCE

of 4

October – December 2010 E&I QA/QC Engineer (Leader). Project: LPG / LDHP (HEH)

Company: LEAD C&T

Client: SONATRACH

Contractor: SAIPEM.

July 2009 – July 2010 Instrumentation QA/QC Engineer (Supervisor). Project: UTBS (Unité de Traitement de Brut Sud)

Company: LEAD C&T

Client: SONATRACH

Contractor: SAIPEM / LEAD C&T.

February 2009 – April 2009 Loop Folder Supervisor

Project: YLNG Project - YEMEN

Company: Yemgas

Client: YLNG (Yemen LNG /Total)

Contractor: Yemgas.

July 2008 – January 2009 E&I QA/QC Inspector

Project: Centrale Electrique de Batna – Ain Djasser Company: Ansaldo Energia

Client: SONELGAZ (KDM)

Contractor: Ansaldo Energia

January 2008 – March 2008 E&I QA/QC Engineer

Project: Oléoduc LZ2 24’’ GPL Hassi R’mel - Arzew

Company: LEAD C&T

Client: SONATRACH TRC

Contractor: Snamprogetti Spa - Saipem CA – Lead C & T Ltd) June 2007 – November 2007 E&I QA/QC Engineer

Project: YLNG Pipeline Project - YEMEN

Company: Amecspie & Hawk Int.

Client: YLNG (Yemen LNG /Total)

Contractor: JV Amecspie & Hawk Int.

PROFESSIONAL EXPERIENCE (CONT.)

of 4

January 2005 – September 2006 Instrumentation QC Engineer Project: INAMENAS GAS PROJECT - INAMENAS

Company: LEAD C&T

Client: SONATRACH – BP – STATOIL

Contractor: JK (KBR & JGC).

April 2004 – December 2004 Electrical Engineer

Project : OZ2 Phase II (SP6 – Station de Pompage - TIARET) Company: LEAD C&T

Client: SONATRACH

Contractor: GEIE (SAIPEM & SPIE)

August 2002 – April 2004 Instrumentation QC Engineer Project: Ohanet Development Project

Company: LEAD C&T

Client: SONATRACH – BHP

Contractor: ABB - PIL Ltd.

State Engineer in Computer Sciences

Graduated from the U.S.T.H.B, Bab Ezzouar, Algiers. Awarded in 2000

Arabic : mother tongue

French : fluent

English: fluent

EDUCATION

LANGUAGES

PROFESSIONAL EXPERIENCE (CONT.)