Post Job Free
Sign in

Installation Project

Location:
Houston, TX
Posted:
July 15, 2016

Contact this candidate

Resume:

CHARLIE VALENZUELA

**** ****** ***** **. ********, TX 77407

832-***-**** • **********.*******@*****.***

Title:

AutoCAD Designer

Education:

AAS, Computer Aided Drafting and Design, ITT Technical Institute Houston, TX, 2008

Training:

HSE certification consistent of theoretical and practical training conducted in accordance with Global Industries HSE Management System.

PEC Offshore/TRAP/SafeGulf, SafeLand Certification

Languages:

Spanish, fluent.

Experience:

More than five years of professional drafting experience including experience in offshore pipeline installation and removal procedures. Proficient in Microsoft Office Applications.

Genesis, Houston, TX (Technip USA, Inc.) January 2012 to June 2016

Design and Drafting Designer

Pipeline Installation

Barge and Stinger Roller Settings

Pipe Haul Load out and tie downs

Pipeline lay tension schedules

Pipeline Initiation, Termination, Crossings, Davit Pick up and Riser Installation Procedures

Rigging Arrangement

PLET/PLEM installation procedures

Power Cable and flexible Pipe Installation/Riser

Installation Procedures

Installation Aids

Equipment Layout

Vessel Modification

Fire and Safety Plan.

Piping Layouts

Arrangement Drawings

BP Juniper, 2016

Drafter responsible for fabrication and Installation of 10km of 26” pipeline, 8 off diver installed tie-in spools, 1 off 750m umbilical, UTA, SDU, CDU, and associated flying leads also 5 off 1000m flexible flowlines 8” and 10”. Installation procedures, rigging, and lifting plans of 2 WYE and 1 Isolation valve skid subsea structures and 1 controls mudmat.

DGE Kodiak, 2014

Drafter responsible for installation pipeline, installation project design and drafting scope of work includes installation of flet, jumper, umbilical sleeper and concrete mattress. Fabrication of pullheads and friction clamp.

Shell, Cardamom, 2013

Drafter responsible for fabrication and installation of two 8" flowlines with 6" SCR's, installation of 2 first end PLETs and installation of 2 stress joints. Create spooling/installation stalk sheets for vessels. Create installation sequence drawings for equipment, flowlines and risers. Develop fabrication drawings for Pipe in Pipe, water stop joints & internal buckle arrestors.

PDVSA Dragon Accelerated Production Systems, Venezuela, 2013

Drafter responsible for 450ft. water depth. Installation of four subsea trees, nineteen 19 kilometers of 16" gas flowline, 19 kilometers of hydraulic and electrical umbilical, eight flexible jumpers, two 16" pig launchers, eight rigid tie in spools, 11 subsea pipeline structures and associated hydraulic/electric flying leads. All installation work completed using the Iron Horse construction vessel, G1200 pipe lay vessel and third party dive vessel.

Anadarko, Lucius, 2012

Drafter responsible for the design and drafting of installation of flexible flowline; multiple flexible gas lift jumpers; main gas lift and infield umbilical’s; subsea distribution units; electrical; fiber optic and hydraulic flying leads; design and draft flexible flowline end termination; and installation of rigid jumpers. 3D fabrication drawing support.

Technip USA, Inc., Houston, TX, February 2011 to January 2012

Design and Drafting Designer

Pipeline Installation

Barge and Stinger Roller Settings

Pipe Haul Load out and tie downs

Pipeline lay tension schedules

Pipeline Initiation, Termination, Crossings, Davit Pick up and Riser Installation Procedures

Rigging Arrangement

PLET/PLEM installation procedures

Power Cable and flexible Pipe Installation/Riser

Installation Procedures

Installation Aids

Equipment Layout

Vessel Modification

Fire and Safety Plan.

Piping Layouts

Arrangement Drawings

Global Industries, Inc., Houston, TX, February 2010 to December 2011

Drafter

Design and create fabrication drawings for 4 and 5 inch PLETs, develop PLET installation procedures.

Jumper fabrication details develop jumper installation procedures.

Develop pipeline initiation, termination, crossings, and riser installation procedures.

Umbilical equipment layout and develop installation procedures.

Develop flying lead Installation procedures.

Develop UTA Installation procedures.

LLOG, Mandy Project, Houston, November 2011 to March 2012

Drafter responsible for the fabrication of five flow line jumpers, four PLETs and pull heads. Installation of jumpers, umbilicals, PLETs, pipeline crossings, four and five inch pipeline, UTA, flying leads and SCRs. Key assignments included:

LLOG Exploration, Who Dat Infield and Export Pipeline Installation, Gulf of Mexico

Performed installation for the development a field in MC 503. Installation consisted of (4) 6" in-field flowline systems connecting the wells in MC 503 to semi-submersible along with 10" Gas and 14" Oil pipelines for exporting fluids from semi-submersible to subsea Tie-ins. All terminating in PLETS at the subsea ends and risers at semi-submersible end. Also included the fabrication and installation o (6) 8.625" OD flowline jumpers, all while utilizing DLB's Hercules and Chickasaw along with the G1200.

LLOG, Walter Oil & Gas, EW 878, 2012

Drafter responsible for the design and drafting of a 4” replacement line, by laying 81,317’ of 4” pipeline measured from the PLET location at EW 878 #3 back towards the platform GI 115 “A”. The line will follow the existing 4” route. The 4” line will initiate in GI 115 (380 FSW) with a DMA and terminate in EW 878 (1,540 FSW) with a PLET. Additional work includes three permanent crossings, two temporary crossings and installation of quantity (1) 4.5” jumper at EW 878 #3.

LLOG, Mandy Subsea Development Project, Mississippi Canyon 199, 2012

Drafter responsible for the design and drafting of flowing three wells in Mississippi Canyon (MC) 199 to a W&T production platform, Matterhorn TLP, in MC 243. The field was developed utilizing two 5” in-field flowline systems connecting the two north wells to the TLP. A 4” flowline connected the south well to the north well site. There are two umbilical’s: a 4” from the TLP to the north well site and a 3.5” connecting the north and south well sites. Scope of work also includes fabrication and installation of four 4.5” OD flowline jumpers (PLET to Manifold & subsea well to Manifold) and two 5.563” OD flowline jumpers (PLET to manifold). There are nine locations where pre-crossing work was performed.

Dubai Petroleum Establishment, Jalilah Development, Dubai

Installation of Pipeline, and Jacket / Platform LOC.: Fateh Field/Al Jalilah Field.

Jubille Phase 1A, 2012

Drafter responsible for offshore pipeline installation project. The project consisted of laying two pipelines initiating with suction piles and installing four PLETs and two water injection manifolds.

F.C. Designs, Houston, TX, November 2008 to November 2009

Drafter responsible for detailed shop drawings floor plans, elevations, detail cut sections of architectural woodwork from architectural plans and sketches, Print and make corrections as needed. Also word processing duties include transmittals, warranties, invoices, proposals, etc.



Contact this candidate