CAREER SUMMARY: I have over Five years’ experience in Oil and Gas, Refinery and Petrochemical Plant, Offshore and Onshore oil and gas Engineering, Procurement, Installation, Fabrication, Construction, Mechanical / Field Engineering, Technical Bids Preparation, Design and Drafting using AutoCAD and preparing schedules using Ms Project.
I have worked as an Offshore/Onshore AutoCAD Engineer, Offshore Field Engineer, Site Engineer and as a Maintenance Planning Engineer.
EXPERIENCE ACQUIRED:
1.Refinery and Petrochemical Experience
-Maintenance Planning Engineer: 2 Years
-Vibration Analyst: 2 Years
-SAP PM: 2 Years
2.Engineering, Procurement and Construction
- Field Engineer: 3 years
- CAD Engineer: 5 years
3.Offshore Pipeline and Construction Experience : 1 year
4.Onshore pipeline, Construction and Repair : 2 years
CONTACTS: Home Address: 39 Lucky London Street, beside Boloje Close, Osubi, Delta State, Nigeria. Email Address: acvp9f@r.postjobfree.com, acvp9f@r.postjobfree.com GSM: +234**********, +234**********
PERSONAL INFORMATION: Sex: Male Date of Birth: 28th October, 1984 Marital Status: Single Local Govt./State of Origin: Uvwie / Delta State Nationality: Nigerian
SUMMARY OF QUALIFICATIONS
Institution Attended
Qualification Obtained
Period
Fed. University of Tech,. Minna
B.Eng. Mech. Engineering (2nd Class Upper)
2002-2007
Alakoto High School, Tolu
Senior School Certificate
1995-2001
New Road Primary School
First School Leaving Certificate
1989-1995
WORKING EXPERIENCE:
Warri Refining and Petrochemical Plant Co. Ltd (Subsidiary of NNPC)
Position: Maintenance Planning Engineer (Contract Staff)
Duration: Feb., 2013 till Date
Work Location: Warri Refinery, Petrochemical Plant and Off-Site Locations
General Responsibilities:
1.WORK REQUEST:
Receive all work orders from the requesting departments to which he/she is assigned.
Register all work request and assign work request to respective department for execution
Plan and assign work request to respective department for execution.
Manages work backlog into work plan
Review and screen each work order to ensure completeness and proper authorization.
2SAP PM:
Responsible for daily creation of Work Request Notifications and Work Orders creation using SAP PM.
Responsible for the day to day SAP work request operations.
Releases the notifications and work orders to the specified department.
Utilizes the Computerized Maintenance Management System (SAP PM) and produces standard reports as required.
Carry out operations that require SAP inputs.
Responsible for maintaining equipment BOMs in SAP PM Module and equipment parts inventory (in partnership with Stores) to ensure parts availability.
Generate weekly, monthly and quarterly report using SAP PM.
3CONDITION MONITORING OF EQUIPMENT
Monitor the condition of static and critical equipment and write report about them.
Carry out data analysis on static equipment and write report on plant smooth operation.
Monitor data analysis on plant equipment and report for plant smooth operations.
Collect vibration data of equipment in the refinery and petrochemical plant
Analyse vibration data on questionable machines.
Plot the vibration graph and use it to analyse the reliability of the equipment.
Take speed of rotating equipment when required
Monitors and ensures that all field equipment are in a safe and efficient working conditions of the plant
To patrol the plant and ensure equipment are performing in the designed, safe manner and ensures they are stand-by equipment parts and spares available for immediate use if required.
4MACHINE / DATA CARD
Update machine/ history card.
Use machine and data card to spec for spare parts and equipment
Use machine cards and company spare parts booklet to spec for spare parts required for maintenance jobs
Use data card to get detail information about equipment when required.
5MATERIAL WITHDRAWAL
Receives material requisition voucher from requesting departments and raise Material Issue Voucher (MIV) for the required material.
Raise, Process Material Issue Voucher (MIV) and withdraw materials from warehouse for maintenance work
Collect out of stock (O/S) for materials that are not in the warehouse and get a contractor to supply the materials if the material is within specified budget.
Raise Material Requisition Form (MRF) for out of stock (O/S) materials for materials that required large huge sum.
Process and send MRF to procurement department for purchase
6INSPECTION OF MATERIAL
Carry out inspection of materials purchase by company.
Inspect all materials supplied by third parties for MRF raised.
Inspect and supervise third party construction and project jobs
Prepare inspection report for materials inspected.
7SCHEDULING
Schedule works to be done using Ms Project
Schedule preventive maintenance jobs for equipment
Prepare schedule for maintenance jobs
8THIRD PARTY (CONTRACTORS)
Liaises with contractors on third party jobs
Provide needed information to contractors to perform their jobs
9REPORTS AND OTHER DUTIES
Prepare vibration reports on critical equipment
Prepare inspection report for materials inspected.
Performs other duties as assigned.
Performs other duties as assigned.
Bablink Resources Nigeria Limited
Position: Site Engineer
Duration: Nov., 2012 to Feb., 2013
Work Location: Warri, Off-Shore and On-Shore
General Responsibilities:
Provide Technical, Engineering and Construction Input in the project
Check Plan, drawings and quantities for accuracy
Ensure that all materials used and works performed are as per specifications.
Liaise with any consultants, sub-contractors, supervisors and general workforce on the project
Liaise with clients and their representatives including attending regular meetings to keep them informed of progress
Day to day management of the construction site, including supervising and monitoring site labour force and the work of sub-contractor
Checking and preparing reports as required
Plan the work to be done and organise things to meet project deadlines
Write Project based procedures and Generic Procedures
Pre-Qualify Welders for Onshore Pipeline Project
Prepares List of Project Materials, consumables, Equipments, Tools
Managed construction site workers
Calculate the number of electrodes, number of joints to be production per welder in a day, to the used for the project
Attend Project management meeting
Prepare tenders, bid and pre-Qualification packages
Design and Drafting Support
Interpret design and drawings to construction crew.
Prepare daily progress report, expenses break-down report
Projects Executed
Dual 10’’ X 65km Owa-Aladinma Ogharefe Pipeline Project
Client: Pan Ocean Oil Corporation(POOC)
Scope of Work: Engineering, Design and Construction of Dual 10’’X65km Pipeline from Owa-Aladinma to Ogharefe Flow Station and Gas Plant Project.
DAMAS GROUPE, NIGERIA (DAMAS OIL AND MARINE SERVICES LTD)
Position: Field Engineer
Duration: 19th August 2012 till October 2012
Work Location: Offshore Sites, Lagos and Port-Harcourt, Nigeria
General Responsibilities:
Assist in the preparation of procedures, drawings and ensure that documentation comforms with project specs.
Prepare the Vandrezzer Akepo and SNEPCO documentations and design
Design Document: Create technical specifications and Procedure
Engineering Support: Prepare technical documents for review by Senior Engineer
-Produce designs, layouts and sketches with AutoCAD
-Generate drawings (Plans, Shop drawings) using AutoCAD.
Assist in the preparation of SNEPCO procedures and Drawings.
Ensure the fabrication work on site conform to the design
Ensures construction works conforms to engineering standards, specs and design
Ensure the material specification is used during fabrication and construction.
Prepares construction working drawing used by construction team
Check out for materials to be used for fabrication and make requisition when required
Perform basic calculations and padeye analysis and calculations for the design of lift rigging.
Interpret the design to the construction personnel
Prepare Sequence drawing, Anchors Pattern drawing, Installations drawings and fabrication drawing
Design of padeyes for lifting and Prepare BOM and MTO.
Monitor the work progress and ensure that execution as per procedures, schedule and sequence.
Participate in resolving any technical problems that arise during construction.
Some Design Done
Plough Design, Ramp and Stinger Design, Barda II General Arrangement, Beach Pull General Equipment Set-Up, Beach Pull Sequence Drawing, DLB General Arrangement Drawing, Pipe Load-Out and Stacking and Sheave Design and Details
BONGA FPSO Caisson Installation Project
Client: Shell Nigeria Exploration and Production Company Limited (SNEPCO)
Scope of Work: Installation of three Caisson at BONGA FPSO
Vessel: DLB Dolphin
Oando Monpod and Pipeline Installation Project
Client: Oando Petroleum Nig Ltd
Scope: Installation of Monopod and 8.3kmx6” Concrete Coated Pipeline from Forcados Shell Base and Beniboye Flow Station Shore Line to Akepo – 1 Monopod Platform
Vessel: DLB Dolphin
MECTHROLEUM NIGERIA LTD
Position: Mechanical Engineer / Field Engineer
Duration: April 2010 to August 2012
General Responsibilities
-Responsible for all Installation, Fabrication, Engineering and Technical support to the construction team.
-Interpret drawing/design and construction procedure to construction personnel
-Supervise installation of Mechanical equipment, Piping and Structures
-Provide technical support to construction team
-Prepares construction working drawing used by construction team
-Interpret the design to the construction personnel
-Ensures construction works conforms engineering standards, specs and design
-Monitor all installation works and enforces quality control
-Ensures that construction team fully understand the fabrication and installation procedure
-Supervises and Co-ordinate activities of different fabrication works in the workshop
-Stop all fabrications and installation works that do not meet specified requirements and ensure the re-work is carried out to clients specifications
-Drafting: Produce conceptual and layout drawings for proposals, bids
-Design Document: Create technical specifications and Procedure
-Engineering Support: Prepare technical documents for review by Senior Engineer
-Produce engineering drawings, layouts and sketches with AutoCAD in
a.Load and sea fastening details drawings
-Generate drawings (Plans, Shop drawings) using AutoCAD either based on information gain from sites or by discipline Engineers.
-Modify designs and drawings as required by discipline Engineers
-Provide Tender and Pre-Qualification support
-Prepares daily report and updates superior of Project progress
1.Auto Sampler Complete Installations Project
Position: Installation / Field Engineer
Work Location: Sapele, Amukpe and Oben Flow Stations
Client: Seplat Petroleum Development Company
Scope: Design, Procurement, Fabrication and Installations of 3 Auto Sampler, Probe Support and working Platform, Fabrication, Transportation and Installations Supports at Oben, Amukpe, and Sapele Flow Stations.
INFINITE E PRECISION TECHNOLOGY ENGINEERING Position: Project Engineer/CAD Engineer Duration: April 2009 to March 2010
Work Performed:
Design extra-low voltage system: Fire Alarm, access control, CCTV, Public Address System, Data, Voice, Satellite TV, whole-house audio.
System integration design (using AutoCAD for design and drafting)
oSingle–Triple Play solutions(Voice, Data & Video)employing optic fiber
oTechnical Security Systems (CCTV, Fire Alarm)
oAudio Visual systems: whole house audio and paging system
Design of conduit/signal layout and the Line/Riser diagram for extra-low voltage system(voice, data, video, CCTV, and Fire Alarm etc)
Co-ordinate design issues within the Design Team and the site teams.
Responsible for planning, execution, monitoring and control of projects.
Manage issues of projects and escalates issues when necessary.
Good Knowledge of reading drawings, understanding design and extracting quantities and ensure quality are met.
Manage, Co-ordinate and supervise different construction site projects.
Prepare work program using Microsoft Project software
Attends contractors and sub-contractors meetings.
INFINITE E PRECISION TECHNOLOGY ENGINEERING Position: Field Engineer Duration: April 2009 to August 2009 Scope:
Work Performed:
Structural cabling of telecom cables(cat 5e, cat 6,fiber)
Structural cabling of audio/visual (RG 56 etc) and technical security systems (CCTV, fire alarm system)
Termination of the different cables
Interpretation of design, daily site progress report and attends site meeting
Projects Executed:
Fire Alarm, CCTV, Data and Voice, Public Address System Installations,
Scope: Design, Procurement, Installations and Project Management of the above services
Fire Alarm, CCTV, Data and Voice, and Satellite TV System Installations
Scope: Design, Procurement, Installations and Project Management of the above services
GRABIS RESOURCES ENTERPRISE (NYSC) Position: Field Engineer Duration: March. 2008 to Feb. 2009
Work Performed:
-Installation of VSAT Equipment
-Supervision and co-ordinating of workers
-Interpret design or drawing to installation and field workers
HI-TECH CONSTRUCTION LTD Position: Trainee Duration: July 2006 to Dec. 2006
Work Performed:
-Design and drafting using AutoCAD and site supervision
CODES AND STANDARDS APPLIED
API, DNV, ASME, AWS etc
AWARDS
Educational Merit Award, Delta State Government Undergraduate Scholarship Scheme
PERSONAL SKILLS - Excellent oral and written communication skills - Excellent ability to work under pressure and high level of integrity - Excellent analytical, numerical and technical skills - Excellent planning, organizational and interpersonal skills and quick approach to changes - Excellent ability to work independently and with a team - Excellent computer application skills (Auto Cad 2D & 3D, Ms Project, Ms Word, Ms Excel, SAP PM)
HOBBIES Reading, Drawing, Reasoning, Teaching, Making Research and watching documentaries.
REFEREES
Available on request.