MANSUETO R. MENDEZ - RESUME'
Address: Windsor Apartments, 12035 Old Huffmeister Road, Cypress, Texas, 77429, tel. N0. mobile: 956-***-****/ home: 956-***-****; email: **********@*****.***
PROFESSIONAL SUMMARY
Motivated Piping Supervisor highly effective on finding the best methods possible to complete exceptional procedures on construction projects for onshore & offshore. Strong knowledge of piping run installation principles especially on existing plant to avoid any obstruction & double works that may cause delay of completion per scope of work & time frame.
•
•
SKILLS
• Knowledge in Medical Assembly to cure people who have a heart problem.
* Knowledge in Oil, Gas/Petrochemicals, Refinery & Power Plant Construction Projects
• Expert on Well Hook-up, Flow Line Installation, Demolition of Line, Tie-In, Plant Shutdown,
Modification & Repair, Fabrication of Pipe Spools, Hydro & Leak Test & Commissioning.
• Handles Safety Matters, Scaffold Erection & Rigging Works
WORK HISTORY
• 10/19/2015 to 02/05/2016
Medical Assembler
CSI - Cardiovascular System Inc.
14740 Kirby Drive Pearland Texas, 77047
Duties & Responsibilities
Worked as Medical Assembler for people who have a blood clot problem. Prepared/Applied
Resin to medical assembled parts, testing/calibrate air supplied torque wrench.
* 11/1992 to 07/2013
General Foreman Mechanical/Piping
Mohammad Almojil Group
Dammam, Saudi Arabia
Duties & Responsibilities:
• Supervise/Handles multi craft construction personnel Offshore on board a Construction Work
Boat at Saudi Aramco Oil Fields for manned ( GOSP ) & unmanned platforms.
• Managed the installation of different type/classes/size of pipes & fittings for Oil, Gas, Air,
Chemicals, Water ( potable, vent/drain, fire ), electrical works for Power & Lighting,
Instrumentation ( SSTL Tubing ), Permanent Equipment, Painting Application, Hydro/Leak
Test, Commissioning & Start-up assistance.
• Coordinate for clearance with the Client Field Service Superintendent/GOSP Foreman for Plant
Shutdown, Tie-In, Demolition, Modification & Repair & for schedule of start-up.
• Initiate to start the activity pertaining to Work Package-Scope of Work per Plan & Specification
& do process the work permit procedures.
• Checked/Request/Follow-up additional materials not indicated in the BOM or not in the
drawing but required as per Flow Line requirements & for modification base on the actual run
or re-routing problems.
• Prepared JSA as Safety requirements daily prior to starting of job work.
• Multi craft that I managed were as follows namely; Foremen structural/Pipe fitters, E/I &
Scaffolding; Pipe fitters, welders, electricians, instrument tech./fitters, scaffolders, riggers,
crane operator, mechanic store man, painters, Safety Officer & Project Nurse.
• Assist Safety Officer & Project Nurse for employees safety & health monitoring.
• House keeping is a house rule.
• Report directly to Project Client ( PMT ) & Project Manager at onshore for daily activity, &
other subject matter for information & final disposition.
• 03/1991 to 09/1992
Foreman Mechanical/Piping
Brown & Root/Taylor Woodrow LLC
Leckweir, Oman
Duties & Responsibilities:
• Assigned in the installation of structural, piping run including supports for Water Injection
Line.
• Checked/Request/Prepared materials not indicated in the BOM, but indicated in the drawing.
• Handles Punch List Works
• In charge in the Hydro testing & Re-instatement activity.
• Assisted in Commissioning works.
• Final Turn over.
• 01/1990 to 09/1990
Foreman Piping
Arabian Gulf Oil Company
Benghazi, ( Messla ) Libya
Duties & Responsibilities:
• In charge in the maintenance of piping run, pipe supports installation, & replace/installed
new Flow line instruments.
• Monitor/Lunch Pig ( Pipe Cleaner ) from our area Messla to Ras Lanuf Refinery.
• Trained Libyans personnel assigned in my department.
• 03/1987 to 06/1988
Foreman Piping
Kuwait National Petroleum Corporation/EEI
Mina Abdulla Refinery
Al-ahmadi, Kuwait
Duties & Responsibilities:
• In charge in the installation of Piping run & supports, Tie-in works from Tank farm to
Terminal area Unit 206P.
• Installation of Sprinkler at Tank Farm.
• Handles Hydro Testing & Re-instatement works.
• 01/1981 to 03/1986
Junior Mechanical Engineer
Agus V Hydro Electric Power Plant
Ditucalan, Iligan City Philippines
Duties & Responsibilities:
• Handles Electrical & Mechanical works in the installation of piping run for, water ( potable,
sewer, air, rigid conduit pipes ),grounding cable & cable tray installation & cable pulling from
Power House to Switch Yard, Power Intake, Channel Intake & Diversion Weir.
• Assisted Mechanical Engineer ( Sr. Supervisor ) on progress report preparation.
• Handles as-built drawing on mechanical works for submittal to client for final billing &
Project turn over.
• Reconciliation Work.
EDUCATION
• School/University : University of the Visayas
• Address : Colon St. Cebu City Philippines
• Degree/Course Taken : Bachelor of Science in Mechanical Engineering ( BSME )
• Year Completed/Graduate : October 1980
• School/University : University of the Visayas
• Address : Colon St. Cebu City Philippines
• Degree/Course Taken : High School
• Year Completed/Graduate : April 1972
PERSONAL REFERENCES
• Mrs. Carla Hunt - Production Manager
CSI - Cardiovascular System Inc.
14740 Kirby Drive Pearland Texas, 77047
Telephone 651-***-****/ cell phone: 832-***-****
• Mr. Peter Gladston - General Construction Superintendent
Worley Parsons
Saudi Arabia
mobile : +966-*********
email add : *************@*************.***
• Mr. Abdulaziz Alnoiam - Project Manager
Mohammad Almojil Group
Marine Hook-up Project (Offshore)
Tanajib, Saudi Arabia
mobile : +966-*********
email add : ****************@************.***
• Submitted by:
Mansueto R. Mendez
Applicant