Post Job Free

Resume

Sign in

Data Entry Quality Control

Location:
Cocoa, FL
Salary:
33.00 hr
Posted:
July 07, 2016

Contact this candidate

Resume:

Esther M Sardina

920-***-****

*** ********* ** ********* ***

acvlki@r.postjobfree.com

Objectives

Looking to apply my years of knowledge and experience in the manufacturing and production industry with a company where I can succeed and grow. Where I can challenge my knowledge with each task I perform to the best of my abilities.

Skills

Inspection: IPC 610 & IPC 620, AS9100, ITAR, First Article Inspection, Source Inspection, In Process Test, Read Blue Print, read electrical Schematic, Final inspection, in process inspection, Troubleshooting, Visual Inspection, Audit inspection, Use of Test Implements, Scope Inspection, Source inspection, Micrometer, CMM, Mechanical inspection, flight hardware, Pneumonic and hydraulic inspection, Final Analysis MRB-Review Board, Visual Basic, Java, Pearl, SQL, Agile, Microsoft Word, Excel, PowerPoint. Automated test of Software, GSE program system.

Documentation control, SOP Documentation, implementation of process for SOP, Update Documentation with latest procedures. Review relines and drawings, review failer report analysis, review final audit documentation, source inspection documentation. Type 30 wpm, Data entry documentation, Administrative/data entry tasks. Basic MS Office applications. Microsoft Sharepoint

Education

July 6 2014 Bachelors of Science in Computer Science (GPA 3.43)

Everest University Melbourne, FL

Completed all assignments in a timely manner

Experience

May 2015 May 2016 Production Associate II (Quality Control Dept.)

Plexus Corporation 2444 Schultz dr Neenah WI, 54957

Perform inspection of material and units to comply with IPC 610, ITAR Inspection of documentation to verify BOM and receiving material are to the latest revision. Data entry of test results performed on daily basis. Upload data to software programs, input data to documentation packages on a daily bases. Inspection of printed circuit boards and flex cables for solder discrepancies and proper component identification. . All inspection is done under scope and per IPC 610 and customer drawings. Inspection of conformal coat is performed on a daily bases for evidence of proper seal on component and board. Grid and sim scope inspection was performed on daily bases. Final inspection of Qv8 and Iv9. GSE system.

October 2014 February 2015 Quality Control

Insight Global ( Comtech Systems) 300 N Orlando Ave, Orlando FL, 32801

Perform inspection of material and units to comply with IPC 610 and IPC 620, AS9100, ITAR. Inspection of documentation to verify BOM and shipping material are to the latest revision. Review MRB material and process per engineering instructions. Mechanical inspection on units is performed per customer drawings. In process inspection of wired chassis is performed and documented per electrical schematic and verification of correct connection is done by measuring point to point with Ohm meter. Pull test of cable wire is performed per customer specification. Documentation is verified using SAP Application. First Article Inspection. Data entry of results of audits on a daily basis. Input of data for several job accounts, Administrative task to include copy and fax or scan documentation for managers and supervisors.

August 2011 January 2012 Sr Quality Analyst/ Test Analyst

PDS Technologies (Lockheed Martin) 51 West Kennedy Blvd, Tampa FL, 33609

Familiar with ASTM / DOD sample tests of raw material, chemicals, and/or finished product for Quality controls to ensure compliance with quality develops and implements testing and Inspection procedures. Audit results of test to determine if product specifications are met. Performed First Article Inspection, Recommends corrective action where necessary and develops plant quality control manuals. Complete fabrication of PTDS Persistent Threat Detection System Aeronautical lighter than air surveillance system for customer. Duties included system level integration, test and deployment of heavy machinery and mechanical sub-assemblies, avionics and electronics sub-assemblies, fiber optics sub-assemblies, hydraulics systems, metal work including manufacturing and machining. Worked alongside of engineers in the task of testing software debugging problems, making sure procedure was met per customer satisfaction. Implemented and updated test procedures on updated software. Automated test and debugging of software on a day to day bases. Developed user manuals for software test. Analyzed test data to verify criteria acceptance, data entry on a daily bases on excel spread sheets to keep information accurate. Performed source inspection of final product before shipment to ensure compliances were met to include test documentation and engineering documentation, and ITAR.

December 2007 June 2009 Quality Inspection

Harris Corporation 2400 Palm Bay rd. NE, Palm Bay FL, 32919

Quality control for numerous deployable reflector projects in the Harris Space Structures Group. QA inspector on deployable communication satellite reflector programs in clean room environment. 9 meter programs include: Sirius FM5, Sirius FM6, XM Photogrammetry, MLI installation, stowage installation, stowage operations, deployment operations, lock-up operations, pyrotechnics installation, Pneumonic and hydraulic inspections, High level of field service experience including extensive work at customer clean room Hi-Reel / ESD facilities, during flight hardware integration, disintegration, movement and testing in preparation for launch readiness. RIDS Receiving Inspection Database System, and PDM/Agile. I'm also experienced with12, 14, 18 & 22 meter deployable satellite communication reflectors. Analyzed test data for automated test and manual test of software on units to meet customer specification of software. Performed source inspection at clients facility to verify compliance before shipment of product, this included various locations. IPC 610 and ITAR. Data entry of results to system on daily bases.

February 2005 March 2006 Quality Inspection

Superior Technical Resources (DRS) 1581 Robert Conlan Blvd. NE Palm Bay FL, 32905

Inspection and building of cable wiring, and different types of crimps, was performed per IPC 610. Inspection of hardware and electrical connections was performed after vibration test to insure hardware was still snug and electrical connections were not bothered, electrical mechanical assembly of chassis. Software test was performed on military field computers. Inspection of cast molded parts. Inspection of integrated units, performed final inspection of integrated units performed final Audits, First article inspection of PCB boards and units chassis. Source inspection was performed in clients facility, this involved examination of finished product before shipment, Examination of documentation to make sure product was built to customer drawings and engineering specification, examination of test documentation.

January 2001 February 2004 Quality Inspection (Sub-Contractor)

Coils Unlimited 315 Guss Hipp Blvd. Rockledge FL, 32955

Manufactured prototype transformers for various companies, Jobs were executed with engineering drawings and specifications. All jobs were done per customer drawings, per IPC 620. Stripping and tinning wire for a good lay solder. All was done per IPC 620. Performed first article inspection, Worked with engineering in writing operating procedures. Test of units performed manually with Inductance Bridge, dielectric breakdown test of units, ohm meter, and oscilloscope. Phase test of unit’s implemented with oscilloscope. Implemented shop operational procedure for manufacturing and test.

July 1998 January 2001 Quality Inspection /Test Tech

Renco Electronics 797 International pl. Rockledge FL, 32955

Responsibilities to include: in-process and final test of products. Test performed were turn ratio, voltage ratio, inductance test, leakage inductance, and dielectric breakdown of units. Visual inspection and checking dimension on units after varnishing to insure that it was still within tolerances All inspection were performed per customer drawings and specifications. Performed rework on cables and rework on boards, removing bad component and replacing with correct value. Winding of transformers for proper turns was performed on winding machine. Potting and sealing transformer after test to keep moisture out. Solder of terminals on high voltage transformers. Supervised a group of 20 employees and trained them on procedures.

November 1995 March 1998 Quality Inspection /Test Tech

Johnson Mathey 1801 Technology Dr. Melbourne FL, 32901

Inspection of printed circuit boards, flex cables for solder discrepancies and proper component identification. Performed assembly of coax and fiber optic cables to insure on damage was visible. Assembly and solder of surface mount cards were also performed at various stages. All inspection was done under scope and per IPC 610 and IPC 620. Application of conformal coat was done as touch up on boards and inspected for a good seal on component and board. Reworked cut or damaged circuit per IPC 610. Source inspection of completed units was performed to verify compliance of product, making sure that product was built accordingly to customers specification and engineering drawings to also include review of documentation of calibration and test equipment used at the time of manufacturing.

November 1990 October 1995 Quality Inspection /Test Tech

Transformers Inc. 1920 Murrell blvd, Rockledge FL, 32955

Electric Mechanical, test and assembly of transformers were performed daily. Tested transformer in a green stage before varnishing or encapsulating units to assure electrical specs were within range. Final test and inspection were performed per customer drawings and specification. Coordinated Motorola project with engineers and supervisor

to train employees for the build of unit. Supervised project form beginning to end. Mixing of raw material for impregnation and encapsulation of power supply. Performed thermal shock test on power supply’s going from hot to cold temperatures for various hours to test stress of material and to verify no discrepancies has taken place.



Contact this candidate