Herbert A. Pinote

Objective

Electrical Construction

Education

University of the Visayas Cebu City, Philippines

Bachelor of Science in Electrical Engineering

Certificate

Languages

Registered Electrical Engineer Professional Regulation Commission of the Philippines

Cebuano, Tagalog and English.

Job qualification

Work experiences,

Electrical Construction,Testing & Pre-Commissioning.

Site Safety supervision.

December 1, 2015 – May 31, 2016 - Toshiba tie-up with Mitsubishi Corporation - 3x 55MW Coal Fired Thermal Power Plant project- Balingasag, Misamis, Northern Mindanao, Philippines.

Project owner: Minergy Power Corporation

Position: Electrical Erection Engineer.

Monitoring and supervision the entire electrical installation at site including 138KV AIS 8-Bays substation/switchyard.

Cable management.

Review site drawings, material availability, method statement, field quality plan, inspection test plan and project specifications.

Monitoring work progress of the subcontractor against the project schedule.

Conduct daily meeting with Electrical sub-contractor and discuss site issues that need to be resolved. Also attend weekly site coordination meeting with all discipline.

June 1, 2014 – June 30, 2015 - Mitsubishi Hitachi Power Systems- 1x 154MW Coal Fired Thermal Power Plant project- Guacolda-5, Atacama Region, Chile, South America.

Project owner: Empressa Electrica Guacolda

Position: Electrical Supervisor.

Supervision and monitoring of 220KV cable work and connections from Generator Main Transformer to existing GIS via cable trays. This includes Hi-pot/Megger, VLF, interlock & various testing.

Monitoring and Supervision of all Electrical installation works including auxiliaries like Paging, Clock, Telephone and fire alarm systems.

Installation supervision of Cathodic protection for Condenser, Debris Filter, Ball strainer & Seawater intake

Supervision during electrical assembly of gantry cranes for Turbine & Seawater intake.

Supervision and Assist MELCO Vendor for the assembly & Testing of Main & Aux. transformer and IPB/GMCB including Busduct installation from Generator to Excitation transformer thru Excitation panel.

Attend daily meeting with sub-contractors and discuss site issues that need to be resolved. Schedule & Safety is always the main agenda.

December 15,2012 – April 28, 2014 - Worley Parsons Arabia, Ltd.- PMC -40x55MW(SCGT) GE 7EA (Existing) + 10 STGx128MW & 40 HRSG (CCGT) Closed Cycle Power Plant project, PP10 - Riyadh, Kingdom of Saudi Arabia.

Project owner: Saudi Electricity Company

Position: Field Electrical Engineer

Conduct inspection of completed electrical works that includes witnessing & supervision for Site acceptance testing of aux. panels, MCCs, switchgears, transformers and other various electrical equipment.

Conduct inspection of Electrical related Materials that reached at site store to see to it that the EPC comply based on approved vendor. Physical condition also will be visually check if have some signs of damaged during transport. Equipment internal and functional check will be done during site installation.

Witness Factory Acceptance Test of MV Auxilliary transformer at Riyadh ABB factory.

Monitoring & Supervision during cable laying & connections of 380KV cables from GSU to existing GIS via partly underground & through cable rack. This includes VLF, Hi-pot/megger, interlock and various testing.

Check updated electrical drawings if as per Project Technical specification as well as compliance with the latest Comment Resolution.

Site progress monitoring & supervision to avoid delays & lesser deficiency prior to Request for Inspection (RFI) issuance.

Witness of Electrical commissioning.

Issue Work Deficiency Report (WDR) and Non Conformance Report (NCR) if there are Electrical installation which are not in accordance with the Project technical specification & quality.

Attend Electrical section daily meeting and discussed site issues with the Client.

January 28, 2012 – November 30,2012 – Doosan Heavy Industries & Construction, Limited – 4x 700MW Oil Fired Thermal Power Plant Project, RPP2- Rabigh, Western province, Kingdom of Saudi Arabia.

Project owner: Saudi Electricity Company

Position: Electrical Engineer

Supervision during the installation of HV cable works & connection for 380KV line from Station & GSU transformer to existing GIS via cable trays. Also witness VLF, highpot/megger & various testing.

Supervision during installation of underground ductbank, embedded & exposed conduit for Power only of various LV & Medium voltage equipments at BOP and Power block area.

Supervision of Earthing and Lightning protection installation.

Coordination with other discipline for interferences.

October 21, 2010 – November 30, 2011 – Mitsui & Co. Ltd. Joint venture with Mitsubishi Heavy Industries, Limited – 1x815MW Paiton-3 Coal Fired Thermal Power Plant Expansion Project, IPP - Paiton, Surabaya, East Java, Indonesia.

Project owner: PT PLN

Position: Electrical Supervisor

Supervision during installation of exposed conduit, cable tray and raceway for lighting, communication, instruments, overhead/gantry cranes, Hoists, Pulverizer motors, Forced draft fan, Gas recirculating fan, MOVs, deslagger, sootblowers and other various equipments including oil units.

Cable work monitoring and supervision for MV, LV, control and signal cables including MEGGER and MV cable HIPOT testing.

Telephone, paging and clock system

Supervision of Earthing and Lightning protection installation.

Supervision of Electrical, Protection & DCS panel installation.

March 1, 2008 – June 30, 2010 – Mitsubishi Heavy Industries, Limited – 3x325MW Oil Fired Thermal Power Plant and RO Type Desalination Project - Shuqaiq, Jizan province, Kingdom of Saudi Arabia.

Project owner: Shuqaiq Water & Electricity Company (IWPP)

Position: Electrical Engineer

Supervision & Monitoring during pulling of the 380KV High Voltage direct buried cable including connections from Generator Main Transformer to GIS Substation. The works including installation of link boxes and earthing @ joint locations. Witness the VLF, highpot/Megger and various testing .

Monitoring during construction of AREVA supplied 380KV GIS substation.

Supervision with MELCO Vendor of Transformer and IPB assembly and testing.

Supervision of Earthing and Lightning protection installation.

Supervision of Empressed current type cathodic protection installation at CWP seawater Intake, FGD Absorber, 3x100meters dia-Potable Water tanks, 3x80 meters dia- Crude oil tanks and Crude oil unloading Dolphin.

Supervision of pulling of cables for power, fiber optic and FIDS cable installation also erection of poles & camera assembly for CCTV system. Cable connection and witness commissioning initiated by third party.

Daily progress meeting and discussion on how to improve production with high level of quality without violating any safety rules. Project Schedule must be the main agenda of the daily meeting.

Sept 27, 2006 – Feb 28, 2008 – Mitsubishi Heavy Industries, Ltd. – 5x115MW & 9-Boilers Oil Fired Thermal Power Plant and RO type Desalination Project- ARAMCO Petro-Rabigh - Rabigh, Western province, Kingdom of Saudi Arabia.

Project owner: RAWEC (IWPP)

Position: Electrical Supervisor

Supervision during installation of MELCO supplied 110KV GIS substation.

Supervision during pulling and connection of the 110KV High Voltage 2km direct buried cable from GIS to 2x130MVA Unit Transformer for Desalination Plant and from Main Generator Transformer to GIS .

Supervision during installation of underground ductbank, embedded & exposed conduit for instruments, overhead/gantry cranes, Hoists and various equipments

Supervision and Assist MELCO Vendor for the assembly & Testing of Main & Auxilliary transformers and IPBs.

Supervision of Earthing and Lightning protection installation.

June 2, 2004 – Sept 6, 2006 – A & P Paraskevaides & Partners, LLC- 6 High Rise Bldg. Project at Jumeirah Beach Residence- Sector 1, Dubai, UAE.

Owner : TECOM

Position: Electrical Site Engineer

Review issued electrical shop drawing and coordinate with other discipline if any interference.

Prepare Electrical material take-off for the actual requirement of the project.

Prepare work schedule & manpower, equipment/tools requirements.

Attend site coordination meeting.

Prepare inspection request and conduct site installation inspection together with Owner Engineers and General Contractor’s Engineers.

Prepare as-built drawing

Prepare daily/ weekly/ monthly progress report.

Day to day supervision and monitoring of the entire electrical installation including fire alarm, intercom and BMS systems.

Conduct High Potential testing to Medium voltage cables and Megger test to all Low voltage cables including line checking.

July 1, 1999 – April 21, 2004 – Mitsubishi Heavy Industries, Ltd. - 4x600MW Oil Fired Thermal Power Plant Project, Ghazlan-2 - Juaymah, Eastern Province, Kingdom of Saudi Arabia

Project owner: Saudi Electricity Company

Position: Electrical Supervisor

Supervision during installation of MELCO supplied 380KV GIS substation.

Supervision of Cable Tray installation. Installation was based on the construction drawing that gave clear details of the type and size of the cable tray to be installed. Availability of cable tray elbows and other accessories was monitored properly to avoid construction delay.

Supervision of Lighting System construction of the project. This system construction will range from material availability monitoring, implementation based on construction drawings and applicable Electrical Standards. Stages of lighting system construction must be regularly applied for client technical group inspection, upon approval next construction stage will be implemented. The range for this work will start from conduit installation up to cable or wire connections. After the entire lighting construction process, client inspectors will test the actual luminance of the lightings as per given standards.

Supervision during installation of underground ductbank, embedded/exposed conduit for equipments, earthing & lightning protection system.

October 1997 – June 1999 – Koten Enterprises Co.,Inc. - Highway Road project (Skyway)– Manila, Philippines

Position: Electrical Site Engineer

Supervision of panel, lighting fixtures & poles and cable installations.

Testing & commissioning of installed lightings.

Attend site coordination meeting that discusses issues from different discipline for resolutions. Schedule & safety is the top priority.

April 1995 – October 1997 – Bayan Telecommunication Company –Telecommunication Expansion Projects – Eastern Visayas, Philippines

Position: Electrical Project Engineer

Review construction plan prior to implementation of Proposed Exchange buildings and Telecom cable layout.

Supervision, monitoring and coordination while the construction is on progress.

Evaluate the monthly bill of quantities installed submitted by Project Contractor for payment.

Prepare as-built plans.

November 3, 1993 to October 8, 1994 – JD Bernardo Engineering & Construction – Emilio Aguinaldo College School Building Project – Malate, Manila, Philippines

Position: Electrical Supervisor

Supervision of Electrical installations including pulling of cable from main panel to service entrance.

Document preparation & submittal including follow-up to MERALCO (Electricity service provider) for the installation of transformer, CTs & KW-HR meter & Service entrance cable connection.

June 1989 – January 1993 – Megawatt Construction Corporation – Residence, Warehouse, Hotel and Commercial Building Projects – Cebu City, Philippines

Position: Electrical Engineer

Design & Material Estimation works of Electrical Plan.

Review Electrical construction plan prior to implementation.

Supervision, monitoring and coordination while the construction is on progress.

Prepare Electrical bill of quantities for billing purposes.

Prepare Electrical as-built plan.

PERSONAL DATA:

Date of Birth: July 30, 1964

Place of birth: Baybay City, Leyte, Philippines

Age: 51

Sex: Male

Civil Status: Married

Religion: Christian

References

Engr. Eike Hatasa - MHPS Elect’l Manager- Chile project.

Engr. Haruo Nishijima - MHPS HSE Director- Yokohama, Japan.