Tony Zhao

Project Management

** ***** ** ***********, ************, and Project Management experience

Project Experience

Fluor Corporation (06/2001 – Present)

Proposal Engineer, BP Gulf of Mexico Floating Production Unit, Houston USA (03/2016 – Present)

Facilitated BRMF risk reviews for this lump sum and high liquated damage proposal

Coordinated HSE section of write-up of this proposal

Reviewed BP’s Project Coordination Procedure for Fluor Compliance

Project Engineer, Lake Charles Methanol Project, Houston USA (11/2015 – 02/2016)

Worked with discipline engineers and prepared module quantities, and coordinated with Fluor module yards so they can submit their bids for the 3rd Gen modularization project

Performed BRMF risk reviews to consider lump sum and high liquidated damages

Worked on the EPC Agreement and prepared Annexes and Exhibits

Commissioning Engineer, Spectra Nexus Pipeline Project, Houston USA (04/2015 – 10/2015)

Coordinated facility side of the Pipeline Project, which includes Compressor Stations, Metering Stations, etc

Tracked Material RFQ status to ensure RFQ packages are proceeding aligned with the baseline schedule until Purchase Orders are let

Worked with Contracts to include necessary information in the RFP in order for Contractors to provide the bids

Coordinated the Commissioning activities for the project

Project Engineer, Sadara Project Chem II, Houston USA (01/2015 – 04/2015)

Led the efforts to prepare the Fixed Asset Register for the project

Managing the RFI process between Houston office and site in Saudi Arabia

Project Engineer, Marathon ROUX FEED Project, Houston USA (02/2014 – 01/2015)

Assisted Project Manager to manage the OSBL scope of the project

Managed the Interfaces for the project

Facilitated Risk Reviews and managed the BRMF database for the project

Project Engineer, ExxonMobil Sakhalin Production Projects, Houston USA (06/2013 – 01/2014)

Managed multiple Production Projects in different phases: Pre-FEED, FEED, EPC

Prepared Project Execution Plan, Scope of Facilities, and Scope of Services

Coordinated with Procurement and Engineering to identify long lead materials and prepare datasheets for budgetary quotes and Purchase Orders

Assisted Project Controls to prepare Cost Time Resources (CTR)s to capture changes

Assisted Estimating to prepare different classes of Estimate

Project Engineer, Fluor Shanghai, China (01/2013 – 05/2013)

Assisted execution for the following projects:

Shell Hijau Gasoil Project, Malaysia

BASF Jade Tree Project, China

“Bravo” Project, China

Intellectual Protection / Security Manager, Corning Project in Beijing, China (02/2011 – 12/2012)

Developed Intellectual Asset Protection (IAP) and security plans and procedures

Evaluated IAP part of the bidding packages for all subcontractors and suppliers, and participated the final contract awards to subcontractors and suppliers

Providing IAP training to Fluor project staff, Fluor consortium team member employees, and subcontractor employees

Conducting IAP audits for Corning plant, project site office, and subcontractor site offices

Identifying, risk assessing, and mitigating project IAP and security incidents

Proposal Engineer, Fluor Shanghai, China (11/2010 – 02/2011)

Prepared or assisted the following project proposals:

Owens Corning Project in Hang Zhou, China

Boehringer Ingelheim Pharmaceutical Project in Shanghai, China

Midrex Project in Nan Jing, China

Turnover Manager, Dow Corning Project in Zhang Jia Gang, China (12/2008 – 06/2010)

Developed turnover execution plan and procedures

Identified system boundaries and developed color coded P&IDs for all 345 turnover systems

Utilized CompleteIt to manage the data and turnover documentation

Liaison with all discipline engineer leads to load engineering data into CompleteIt

Aligned with client and quality to obtain and load required inspection test records into CompleteIt

Managed punch list starting from it was raised, cleared by construction, and verified by client

Coordinated with project controls to develop and update the turnover schedule

Coordinated with procurement to support the purchasing and delivery of materials to meet the system turnover schedule

Execution of the turnover process in handling over the facility to the client

Contract Administrator, Dow Corning Project in Zhang Jia Gang, China (08/2008 – 11/2008)

Managed technical clarifications and evaluations for construction contractors

Worked in conjunction with contact manager to short list and ultimately to award the main construction contract

HSE Engineer, Fluor China Office in Shanghai, China (07/2008)

Led the efforts to investigate the fire incident occurred in Fluor China office

Led the efforts to identify all the potential fire hazards and implement all the necessary corrective actions for Fluor China office

Prepared Emergency Evacuation Procedure for Fluor China Office

Engineering Coordinator, LDK Polysilicon Project in Xin Yu, China (12/2007 – 06/2008)

Stationed out of Chengdu to manage Cheng Da engineering team efforts to review and comment design works on polysilicon plant prepared by Greenville office, TCS plant prepared by Manila office, and utility/infrastructure/offsites prepared by EDRI

Managed all the engineering deliverables to be approved and stamped by Cheng Da engineering team and made sure all blue prints to be sent to site in a timely fashion

Infrastructure Engineer, Oyu Tolgoi Mining Project in Mongolia (07/2006 – 11/2007)

Managed engineering and procurement efforts for concrete batch plant and subcontractor camp

Coordinated the general issues, such as manpower and construction equipment mobilizations and logistics with subcontractors

Managed the engineering and procurement efforts for construction warehouse, boiler house, and water treatment plant

Project Engineer, BASF/Huntsman IIP (Integrated Isocyanates Project) in CaoJing, China

(11/2003 – 06/2006)

Established and maintained Fluor’s turnover database (CompleteITsm) for this project. Ensured the accuracy of all data required for turnover and pre-commissioning activities. Coordinated turnover and pre-commissioning efforts among consortium members: Fluor, Daelim from South Korea, and CTCI from Taiwan. Trained and managed teaming contractor technicians to enter and status punch items and quality check sheets.

Planned and implemented work packages, which effectively drove the construction group to allocate manpower and other resources to perform work and meet schedule. Work packages tremendously assisted materials group to expedite materials and reduce inventories.

Led the engineering efforts to provide technical evaluations for design and build contractors. Organized and interviewed 11 bidders for 19 design and build buildings. Assisted to prepare and award contracts.

Stationed at CTCI’s office in Taiwan, coordinated and aligned the engineering, scheduling, and procurement efforts between Fluor and CTCI. Acted as liaison between Huntsman, CTCI, and Fluor.

Led the engineering efforts to prepare the target estimate. Managed the team of fifty engineers from all disciplines to come up with material quantities and manhours needed to complete the project.

Represented Fluor in the kick-off meeting. Prepared and presented civil engineering execution plan to BASF and Huntsman.

Project Engineer, Fluor Shanghai, China (05/2003 – 11/2003)

Performed Due Diligence for General Motor Company in Shanghai, China.

Performed Due Diligence for DuPont’s textiles and interiors plants in Singapore, Taiwan, and China. Koch Company was interested to acquire DuPont’s textiles and interiors division. Fluor was chosen by Koch Company to perform due diligence for DuPont’s global T&I plants .

Assisted to prepare project proposal for the U.S embassy in Beijing, China. Coordinated efforts among Fluor USA and Shanghai office Engineering, procurement, and contract departments.

Construction Support Engineer, Fluor Houston, USA (06/2001 – 05/2003)

Provided construction automation tools’ training and support (CompleteIT sm) for following projects:

ExxonMobil Baytown, Texas

ExxonMobil Baton Rough, Louisiana

BP Pasadena, Texas

Chevron Pascagoula, Mississippi

Citgo Lake Charles, Louisana

Citgo Lemont, Texas

Sempra Mexicali, Mexico

Cross trained and operated in InVision; Worked on performance engineering issues and supported MAA (Manpower Activity Analysis) program.

Hirschfeld Steel Company (07/1998 – 01/2000)

Project Manager, Astro Stadium, Houston

Performed the following tasks: Made schedules for the work crew; Made construction plans; Worked with contractors and vendors; Generated requests for information (RFIs); Generated as-built drawings; Solved daily on-site technical problems.

Butler Manufacturing Company (01/1996 – 06/1998)

Project Designer

Designed the following international projects and increased the understanding of design related technical and regulation issues with different countries.

General Motor Plant in Brazil

Bechtel power facilities in Philippine

Puma project in Mexico

Sales Engineer

Successfully sold the Carlsberg brewing project in Shanghai, China for 2.5 million dollars.

Enhanced interpersonal skills by working with clients, local architectural firms, and government officials.

Project Detailer

Used building design system to design and detail building components. Performed quality check for a number of projects.

Education

MBA in Management Information System, University of Houston, 2001

B.S in Civil Engineering, California State University, Fullerton, 1995

Professional Licenses and Certificates

Engineer-In-Training (EIT)

Contract Information

Address: 4007 Easton Bend Ct, Sugar Land, TX 77479

Email: *********@*****.***