JERRY LUCERO FORMENTERA
Blk * Lot *** Phase *K* Kasiglahan Village, San Jose,
Rodriguez, Rizal Philippines
Contact No.: +639*********/ +639*********
Email Address: *****.**********@*****.***
POSITION DESIRED : SMAW PIPE WELDER
PERSONAL DATA :
Date of Birth : Feb 21, 1972
Place of Birth : Union, San Francisco, Cebu, Philippines
Citizenship : Filipino
Sex : Male
Religion : Catholic
Civil Status : Married
Height : 5’’3
Weight : 55 kg.
Language Spoken : Tagalog, English
Age : 43
Passport# : EB4299956
EDUCATIONAL ATTAINMENT: SY Graduated
High School : Union National High School 1986-1990
Elementary : Union Elementary School 1980-1986
TRAINING AND SEMINAR ATTENDED:
Erecting Scaffolding : February 13, 2014,
ADDRESS : Ingula Pumped Storage Scheme,
Kwazulu Natal. South Africa
NATIONAL CERTIFICATE 11 September 28, 2015
TESDA : 10 marcos highway brgy.mayamot,antipolo city PHILS.
WORKING EXPERIENCED:
Company : WHESSOE CONSTRUCTION PHILIPPINES
Address : Manila, Philippines
Project address : Ingula Pumped Storage Scheme, Kwazulu Natal. South Africa
Position : PIPE /PLATE SMAW WELDER
Date : July 22,2012-upto june 8,2015
Industry : Hydro Electric Power Plant
Duties and
Responsibilities : Full welding of cans or pipe of pre bended steel plate to form into-
3.6m- 5,1m diameter,from the range thickness of 35 mm up to 60mm using the special material 550QL and 690QL which is high carbon
Steel high tensil strength with matching electrode AWS type :10018-
d2 ESAB for 550 QL material and AWS type :11016haOERLIKON
For the 690 QL material using the procedure of pre heating and post
Heating from 177 degree celcius to 250 degree celcious maximum,
Full welding joined cans and pipe in the installation inside the tunnel
From draft tube penstock liner, high pressure headrace liner,
Bifurcator shell with zero rejection from U.T. MPI testing
Company : AL TAWFEEK MAINTENANCE SERVICES CO.
Position : Fabricator/Welder
Date : October 15, 2007 to January 26, 2011
Industry : SKIP DevissionMaintenance
Address : cr no.23426 P.o. box no.24349 Tel no.17786828
Kingdom Of Bahrain Medle East
Duties and
Responsibilities : Maintenance, Welding, Fabricating
Assemble some bucket, and repair tank of heavy truck, and repair of
Septic tank with welding procedure using of electrode 6011 0n root
Pass, electrode 7018 0n hot pass, filling, and capping
Company : ROBLETT International Construction Corp.
Industry : Construction
Address : 2f Door 2N Free Star Arcade
Hernan Cortez St. Subangdaku, Mandaue City 6014 Philippines
Tel no(032-***-****
Position : Structural Welder
Date : November 17 to December 28, 2005
Duties and
Responsibilities : Full welding of plate and of pipe support such as column beam,base
Plate, spider plate,and all kinds of braces with welding procedure, using of electrode 6011 for root pass,and electrode 7018 for hotpass
filling, capping with M.p.i testing procedure only
CHARACTER REFERENCE:
Engr. Jaime Legaspi Fronda
Tel # +973********
Satelite TV Broadcast Engineer
Informationv Affairs Authority
Bahrain Radio & Television Corporation
Hon. Samuel Leren
Bgry. Captain
Contact No: 091********
Mocpoc Norte Loon Bohol
I hereby certify that the above records are true and correct.
JERRY L. FORMENTERA
Applicant’s Signature