Post Job Free
Sign in

Project Manager Engineer

Location:
Houston, TX
Salary:
85000 per year
Posted:
June 29, 2016

Contact this candidate

Resume:

José A. Aguilar Chávez

Chemical engineer – Project Manager -

Universidad Nacional Autonoma De México

Personal Information

Age: 42 years old

Married

Address: Bosques de los arrayanes SMZ III, Mz 39 Lt 13-1, Héroes de Tecamac Sección II Fraccionamiento Paseos del Bosque, Mpo. Tecamac, Estado de México, CP. 55764

Cell phone: +**-**-**-**-**-** 69

e-mail : ************@*****.***.**,

************@*******.***

Professional CED at Mexico: 4335488

Objective

Contribute to the development of my clients or the institution to which I represent, bringing my experience, knowledge and skills allowing respond to the current expectations and needs.

Interest areas

Projects management, Projects coordination, Integrity Management analysis & Risks

Labor experience

16 years of experience

INTERTEK TESTING SERVICES OF MEXICO S.A. de C.V.

Poniente 134, No. 660, Col. Industrial Vallejo, C.P. 02300. México D.F. Tel: 59 98 09 00 Ext 6311

Bos: Ing. Rodolfo Gallardo – Gerente de Operaciones –

Mayo/2013 –Currently

Project Leader. As Leader Project I am in focus in to plan and organize to human resources for to give service in activities of inspection and support for Quality Department of our client, finding always to work with the highest standards in efficiency and the best practice of Engineering.

FLENCO DE MEXICO S.A. de C.V.

5, Av. 16 de septiembre, Barrio de Santiaguito Tultitlan, Estado de México, Zip Code 54900, México Phone : +52-55-589*-****

Boss: Eng. Jorge Ancheyta Guillen – Operations Director –

Project Manager.

Jun/2011 –Nov 2012

My main responsibilities were keep the control of different projects, interacting with the different areas involved such as: Department Purchase, engineering, production and finance. Report Processes Management and attention of requirement customer. Scheduling of different stages of projects: Engineering, procurement and fabrication. Management of requirements with suppliers and service providers, seeking to optimize resources and time since starting of project until project over. Review and supervision for assurance of quality with compliance with applicable procedures, specifications customer, WPS, PQR, NDT, Welding Procedures, Control of material certificates, weld mapping, verification of compliance with current regulations applicable to equipment and plants.

LLOYD GERMÁNICO MEXICO S.A. de R.L. de C.V.

75, Bosque de Duraznos, Int. 605. Bosques de las Lomas, México DF, Zip Code 11700, Phone. 52 45 01 93

Boss: Eng. Eckhard Hinrichsen – Director Operations –

Sep/2009 – March/2011

Engineer Integrity & Risk Specialist

I worked as an engineer specialist in integrity and risk. I participated in the reassessment of Risk Based Inspection (RBI) for the cryogenic plant number II of Pemex Gas and Basic Petrochemicals (PGPB), I managed the database ULTRAPIPE tool in the measurement of thickness to get the results to generate inspection plans and risk assessment for piping circuits and process equipment, to prioritize the maintenance of the plant. Performed the annual review in the area of security for compliance with NOM-013-SECRE-004, for cryogenic storage facility “Costa Azul” natural gas owned by the ECA Company. I also developed programs and resources allocations, estimated hours for the economic development of technical proposals for bidding on projects for pipeline systems Oil & Gas. Projects: “EXECUTION OF A PROGRAM BASED IN RISK OF CRYOGENIC PLANT NUMBER II OF “Complejo procesador de gas en Ciudad PEMEX". “ and “ANNUAL VERIFICATION IN THE MAINTAINING OF OPERATION, SAFETY AND TRAINING OF LIQUEFIED NATURAL GAS PLANT POWER COSTA AZUL IN ENSENADA BAJA CALIFORNIA”.

PUMA PETROLEUM GROUP TRAFIGURA INC.

115, Reforma Av., 21st floor, Lomas de Chapultepec, México City, Zip Code. 11010, Miguel Hidalgo Phone. (54-11-459*-****

Boss: Jorge Carlos Monnerais – Project Manager

Oct/2008 - June/2009

Coordinator Projects

I coordinated the different activities during the implementation in the initial stages of the project on track, scheduling activities; manage with service suppliers and government levels management. Generating of budget global and analysis Risk for the performance of project. Administration and control of documents generated, Coordination for the development of conceptual engineering, basic engineering, controlling processes, monitoring activities at different stages of project development, reporting to management. This project was to build facility storage with a capacity of 1 million barrels of gasoline and a 325 km pipeline transportation system, with a projected investment of 500 million dollars. Project: "SYSTEM FOR STORAGE, TRANSPORT AND DISTRIBUTION OF PETROLEUM PRODUCTS TUXPAN – TOP OF TOGO – SAN MARTIN - CUAUTLA"

BUFETE OF ENGINEER & RISK ANALYSIS S.C

245, Torcuato Tasso, Office 103, Chapultepec Morales, México City, Zip Code. 11570 Phone. 50 25 33 13

Boss: Director Eng. Juan Gilberto May Hernández

Project Manager & partner Company.

May/2006 – March/2008

INSTITUTO POLITECNICO NATIONAL - GRUPO GAID - RISK ANALYSIS DIVISION

Av, Cumbria 56, Tianguistengo Cuautitlán Izcalli, México City 31072, Phone: 58739984

Boss: Eng. Enrique Cuellar Reyes – Leader Projects

Specialist Senior in Risks Analysis and Industrial Safety.

May/2005 - April/2006

- INSTITUTO MEXICANO DEL PETROLEO -

Eje Central Lázaro Cárdenas and Norte 152, San Bartolo Atepehuacan, G. A. Madero, 07730, México City. Phone: 91758238

Boss: Eng. René de la Mora Medina – Leader Projects

Specialist Risk Analysis and Industrial Safety.

Jun/2002 - May/2005

Studies

1996-2000

Bachelor in Chemical Engineering: Degree

FACULTAD DE ESTUDIOS SUPERIORES DE ZARAGOZA UNAM, México City.

Thesis 2004: “Advance Technological in the Oil Industry for the control of the external corrosion in pipelines systems”

Languages

English: 80% Spoken, 80% Read, written 80%

Qualities

Capacity of Leadership and making of decisions, disciplined, organized, even-tempered, I like challenges, to take analyzed risks, and I am honest, responsible, with character, reasonable, rigorous when it is necessary; with service vocation.

Known Software: I Manage the Integrity assessment Program, for Pipelines (IAP v5.8), Integrity Management Program, to administrate information for Facilities and Pipelines, allowing to administrate and evaluate Risk on facilities, like Storage Tanks, Pumps, Compressors, facilities for measurement and regulation and the like. PHAST (Program Hazard Assessment Software Tools), Software basic AUTOCAD 2D Y 3D. DNV Pro basic, Windows V. XP, Office Version XP y Windows Vista. DNV PRO, Office, Out Look Express, Internet, Corel Draw basic, Project basic, Ultra pipe Basic.

Norms and Standard

ISO 9001:2000, ASME B318, ASME B31.4, ASME B31.3, API 570, API RP 571, API RP 574, API RP 577, API RP 578, API 650, API 580, API 581, ASME B31G, NRF PEMEX,, API 653, APÍ 510, DOT 192, DOT 195, DOT 192, NOM-013-SECRE-2004, ASME SEC V

Courses:

Preparation course for certification in API 570 "Inspection, Reaper, and Rerating Alteration of In-Service Pipe System", by Lloyd Germanic Mexico. Curse for use of Program of the Integrity Administration (Integrity Management Program), Administration of work groups, visual controls tool, Technique 5 s, Methodology to meet ISO 9000. Double lock evaluation and basic adjust in lockers of tin. Computation Course. Resolutions of problems in Engineering with Fortran languages programming. Visual inspection Level I & II.

Methodologies in the Identification and Evaluation of Risks

Methodology of Kent Mulbahuer to evaluate and identify risks in pipelines and pumps, compressors, measure and regulation facilities, Methodology HAZOP, What if, FMAS, “Check-List” for areas of mechanic maintenance, knowledge in Environmental Impact.



Contact this candidate