Post Job Free

Resume

Sign in

Engineer Project

Location:
Perth, WA, Australia
Posted:
June 19, 2016

Contact this candidate

Resume:

WAN M. WAN MAHMUD

Unit **, ** Bronte Street, East Perth, WA 600*-****-*** 035 acvbhv@r.postjobfree.com

Nearly 15 years of multi-disciplinary experience, including structural engineering designs (iron ore, copper and mineral sands onshore structures, marine/offshore structures and transport infrastructure), project management and construction management experience in Australia, the United Kingdom and Malaysia, as well as mine industrial infrastructure design, wharf secondary structural design, railway infrastructure asset management and on-site construction and project management of major infrastructure projects

Skills

Mining processing structures (iron ore, mineral sands and copper), maritime (offshore structures) and bridges structural design, analysis and assessment

Project engineering and construction management of railway infrastructure and high-rise building projects

Professional History

Senior Structural Engineer November 2015 to December 2015

Nammuldi Silvergrass East Iron Ore Project Tender – Calibre Global, Perth

Performed material take off (MTO) of Primary Crusher Building, Crusher Base, ROM Pad, Transfer Stations, Drive Station, 11 tonne and 50 tonne Take-Up Towers, Low Level Modules, 18m Standard and 24m Heavy Trusses, Trestles, 45m Creek Crossing and Loading Points.

FEA Modelled and analysed the steel Gyratory Crusher Base to perform dynamic checks of the structure.

Senior Structural Engineer August 2015 to October 2015

API JV West Pilbara Iron Ore Project Tender – Calibre Global, Perth

Performed material take off (MTO) of Crushing, Scrubbing and Fines Screening buildings.

Modelled and calculated MTO of shuttles, standard truss, trestles and conveyors.

Calculated MTO of Stacker and Reclaimer foundations.

Freelance Structural Engineer Mar 2015 to May 2015

Plant Performance, Perth

Studied the current live load on top of BHP Billiton’s Mining Area C in Pilbara top load out (TLO) bin structure due severe corrosion

Designed Mining Area C (MAC) lifting lugs for screenhouse top chutes

Verified and performed FEA analysis on new grizzly chute breaker beams

Designed TLO dummy flooring for maintenance and walkway

FMG Kings Valley EWP walkway platform check.

Contract Structural Engineer Dec 2014

David Wills and Associates, Perth

Designed commercial projects and inspected for insurance claims

Senior Structural Engineer Aug 2014 to Oct 2014

Yandi 64Mtpa Study – Calibre Global, Perth

Yandi 64 Study Project (Y64) expanded production to a sustained 64 Mtpa through the debottlenecking of the feed to the Yandi Loop OPF. Y64 structural scope of works included adding new platform at Crushing Building to support new bypass conveyor with two new transfer stations.

Assessed and modified Transfer Station 212 to accommodate new apron feeders and chutes with sluices

Checked drive station for new tension loads and dynamic study of overland conveyor CV 212

Made MTO calculations and attended review meetings, HAZID constructability, operability and maintainability meeting

Senior Structural Engineer Sept 2013 to Dec 2013

Rio Tinto’s Yandi Sustaining Project – Calibre Global, Perth

Checked steel structure, including connection checks of scrubbing and screening building and scrubber skid frames to Rio Tinto’s Design Criteria and the Australian Standards AS 4100

Checked plate work such as chute, trammel cover, oversize bin and surge bin

Checked concrete foundation for tanks, scrubbing building, electrical switch room and bins

Designed scrubbing elevator concrete pit to Alimak’s requirements and the Australian Standards

Performed other checking and design work such as conveyor support frames, monorails and lifting frames

Senior Civil/Structural Engineer – Minerals and Metals division Nov 2012 to Jul 2013

Bozshakol Copper Project in Kazakhstan – Ausenco, Perth

Designed dust filter chamber support platform, monorails, pipe supports and steel plate works of distributors, hoppers, bins and overflow hopper

Designed primary crusher waste concrete chamber, pumps’ concrete foundations, tank concrete ring beams and concrete slabs

Remodelled and checked 4–span simply supported steel bridge with 350mm thick in-situ concrete deck

Considered snow, ice/frost and earthquake loads

Senior Civil/Structural Engineer – Minerals and Metals division Mar 2012 to Nov 2012

Kwale Mineral Sands Project in Kenya– Ausenco, Perth

Designed FEED and wet Zircon building, screens building, cyclone building slimes thickening structure, conveyor trusses, monorails, transfer station, pipe and cable tray supports, concrete footings, 25 tonne monopole jib crane foundation and air intake foundation

Performed dynamic analysis of the screens structure and shaking tables platform

Checked product storage, tailing disposal and pipe rack structures

Considered earthquake load

Structural Engineer – Maritime Section Mar 2010 to Mar 2012

Rio Tinto Expansion Project in Australia – Sinclair Knight Merz, Perth

Worked on Cape Lambert Port B 200 Mtpa Iron Ore Phase A and B projects

Designed and analysed 350mm think wharf deck subject to heavy crane load, secondary steel (conveyor supports, pipe supports, pipe anchors, cable tray supports and lifting lugs), valve station platform substation truss, cathode protection and modular structure lifting

Analysed large vessel mooring lines during construction

Performed dynamic check on loading point conveyor support structure

Structural Engineer – Maritime and Infrastructure Section Oct 2008 to Feb 2010

Sinclair Knight Merz, Perth

Oversaw bridge design and project management

Provided bridge superstructure assessment analysis including grillage analysis and prestressed beam analysis with SAM-Leap5 bridge software for Victoria River Bridge

Provided preliminary design and report for two tee-roff highway bridges according to the Main Roads Western Australia specifications for Geraldton Southern Transport Corridor Stage 2

Provided tee-roff type bridge viaduct and tram station proposals for Glenelg South Road Tram Overpass in Adelaide

Provided assistance in preliminary and detailed design of PSC deck units - highway and footbridge superstructures according to Northern Territory Authority specifications for Tiger Brennan Drive in Darwin

Provided detailed design calculations for wastewater steel platforms for W2W Beenyup Wastewater Treatment Plant in Western Australia

Bridge Engineer – Bridges Division Dec 2006 to Sep 2008

Opus International Consultants (formerly Veryards Ltd.), Manchester, United Kingdom

Network Rail’s London North West Structures Assessment Contract 2003-2013, Year 5

Network Rail’s London North West and Midland National Bridge Strike Initiative, Phase III

Network Rail’s London North West and Midland National Bridge Strike Initiative, Phase II

Network Rail’s London North West Structures Assessment Contract 2003-2013, Year 4

Performed bridge inspection, structural assessment and analysis

Investigated and provided detailed structural assessment calculations for road, railway and footbridges made of masonry, steel and concrete

Project Engineer – Project Controls and Construction Management 2000 to 2006

Opus Group Bhd. (formerly Kinta-Kellas Plc.), Subang and Slim River, Malaysia

Tracked project schedule with Primavera P6

Performed project engineering and construction of dual-track electrified railway infrastructure (AUD$2.9B)

Managed construction of road and railway bridges from piling work to completion, drainages, earthworks and Civil-Systems interfacing works

Project Engineer – Construction Management Division 1999 to 2000

Aims-Styrene Sdn. Bhd., Putrajaya, Malaysia

Oversaw scheduling and construction of three-block of high rise buildings in Precinct 8A

Site Engineer – Construction Division 1998 to 1999

Percon Piling Sdn. Bhd., Kuala Lumpur, Malaysia

Oversaw construction of bored pilings of Ampang-Kuala Lumpur Elevated Highway (AUD$308M)

Graduate Structural Engineer – Structural Division 1997 to 1998

SMHB Sdn. Bhd. (formerly Binnie and Partners), Kuala Lumpur, Malaysia

Oversaw design and analysis of structures according to BS 8007 and BS 8110, including liquid retaining structures for Sungai Selangor Water Supply Scheme, Phase II, liquid retaining structures for Jerudong Waterworks in Brunei and reinforced structures for Smart School Project

Software Skills

Microsoft Project

Microsoft Office including Excel (Advanced) and Word

Structural Analysis: Staad Pro V8i, SpaceGass, Microstran, SAP2000, Etabs and Sam-Leap5

Connection Software: Limcon

FEA Software: Strand7

Drafting Software: Tekla 17.0, Autodesk Autocad, Microstation Viewer and Naviswork Freedom

Scheduling Software: Primavera P6

Education

B. Eng. (Hons.) Civil and Structural Engineering

Universiti Kebangsaan, Malaysia, 1998 (National University of Malaysia)

Affiliations

Member of Engineers Australia (MIEAust No: 3063285)

Graduate Engineer of the Institution of Civil Engineers (UK)

Referees

Neal Kakulas

Lead Engineer at Calibre Global

acvbhv@r.postjobfree.com

041*-***-***

Nic Jacov

Principal Structural Engineer at Calibre Global

acvbhv@r.postjobfree.com

043*-***-***

Peter Tambakis

Principle Engineer at Calibre Global

(Formerly at Ausenco)

acvbhv@r.postjobfree.com

042*-***-***

Vic Dietrich

Principal Civil/Structural Engineer at Ausenco

acvbhv@r.postjobfree.com

042*-***-***



Contact this candidate