Post Job Free
Sign in

Electrical Project

Location:
Teresa, CALABARZON, Philippines
Posted:
June 17, 2016

Contact this candidate

Resume:

Edwin Dela Rosa Villamor

#*** *** ***** **. ********** Angono, Rizal

Mobile No.: Smart +639*********

Globe +639*********

E-mail address: ********@*****.***

OBJECTIVES:

To engage in a job where my knowledge and capabilities will be mostly utilized to be an asset to the company. I am to work with, and at the same time enhance and improve my skill, not only in my field of specialization, but also to the other field of work as well.

Position Applied for : Electrical Foreman / Supervisor

Profile:

Experienced in Industrial Plant Construction and in Building electrical installation; Installing, maintaining, and repairing of electrical wiring, electrical equipment, controllers and fixtures, ensuring that work is in accordance with relevant codes.

Experienced in installation, trouble shooting, repair and maintenance of electric motor, power generation, electrical control equipment, electrical facilities, water pump and compressors

Experienced in Plant Mining Construction and Pre-Commissioning.

Experienced in installation and maintenance of electrical and instrument equipment in hazardous area.

Highly organized and has strong dedication to work which leads to completion of projects

Safe Worker of the Month Awardees (Foreman Electrical).

EMPLOYMENT RECORDS

Aug. 22 2014 to April 15, 2015 : Aden Services

Xayaburi, Laos (PDR)

Project : Andritz Hydro Camp

Xayaburi Hydro Electric Project

Ban Houay Suay Xayaburi District, Road 4

Xayaburi Province, Lao PDR

Position : Electrical Supervisor

Job Description

Responsible for executing the construction activities associated with the electrical installations

Supervise the electrical installation required to execute the work in accordance with the schedule and in compliance with the project objectives specifications, procedure, requirement and directive.

Provide leadership to cause the creation of the organization structure and process required to fully execute the requirement of services and is responsible for the execution of electrical services, quality, performance and construction cost

Monitoring the daily productivity from the manpower and distribution of manpower as per priority and prior planning.

Evaluate, inspects and report equipment and system performance.

Responsible for advance testing and measuring tools to verify proper functioning of equipment and system.

Analyze troubleshoots,diagnoses,repairs of equipment

Monitors the implementation of safety orientation, safety indoctrination and gang box meeting and provide coaching and improvement.

Responsible for maintenance of the building after finish the project.

Maintain safe working condition in the site.

Sept. 26, 2013 to March 26, 2014 : Kentz Engineers & Constructors

Papua New Guinea EPC4

Project : Well Pad Area (Drilling) & Processing Plant

PNG-LNG Project under CBI & Clough JV

Position : Electrical & Instruments Foreman

Job Description

Prepare Job Hazard Analysis for applying permit to work

Conduct pre-start meeting and real time hazard assessment in the work area before start the work

Responsible for the supervision and planning of activities of electrical crews at work area

Responsible for the installation of electrical and instrumentation equipment at work area based on installation details and drawings

Responsible for the installation of fire and gas detectors in local electrical room and process area

Responsible for the termination of cables in electrical equipment, junction boxes, transformer, switch gear, UPS and MCC.

Ensure that proper procedures for safety and installation works are being followed and complied

Monitor and control the activities of the electrical group to ensure the quality and completion of works based on the requirements

Read and interpret electrical drawings, electrical plans, P&ID, diagrams and specification

Test electrical and electronic equipment for continuity, current, voltage and resistance. Including line checking and insulation testing for electrical and instrument cables

Conduct Insulation Resistance of Instruments Cable, Control Cables and Power Cables

Responsible of cable pulling of pair signal cable from field instrument to field junction box and pulling of multi pair and multi core cable from field junction box to marshalling system cabinet box as per cable schedule drawing.

In charge of cable glanding, cable termination, core marking and cable dressing as per termination details.

Installation of field instruments such as Pressure Transmitter(PT), Temperature Transmitter(TT) and Differential Pressure Transmitter(DPT) as per hook up drawings

Assist commissioning engineers during loop commissioning and testing of system and sub system equipment

Preparation of site work repair, work progress and ensure the safety of the workers at work area.

Dec. 28, 2012 to June 12 2013 : Elite Venture Ltd. Liberia

14 St., Sinkor Monrovia, Liberia

Project : Bomi Hills and Bea Mountain Exploration

Mining Camp

Position : Electrical Supervisor

Job Description

Diagnoses causes of electrical problems or failures for the purpose of identifying equipment and systems repairs.

Informs personnel regarding procedures and status of work orders for providing information for making decisions.

Taking appropriate action and complying with health and building regulations.

Inspects electrical systems and their components for the evaluating condition.

Identifying necessary repairs and recommending preventive maintenance Installs electrical system components lighting, alarms, electrical panels, switches, circuits, timers, lift station control panels.

Enhanced and upgraded electrical capabilities. Repairs electrical components and systems motors, circuits, transformers, generators, switches, intercom systems, kitchen equipment for the ensuring a safe working condition.

Responds to emergency situations during and after hours of resolving immediate safety concerns.

Maintains assigned vehicle, equipment, and tools for the purpose of ensuring availability in a safe operating condition.

Participates in meetings, workshops, training, and seminars, as assigned of conveying and gathering information required to perform job functions.

Prepares written materials, repair status, activity logs for the purpose of documenting activities and conveying information

June 11, 2012 to Oct. 30, 2012 : Sumisetsu Philippines,Inc.

Electrical & Mechanical Contractor

8th Floor, G.C Corporate Plaza

150 Legaspi St.Legaspi Villages

Makati City. Philippines 1229

Telephone : (02)817-5571

Project : PMM PROJECT A BUILDING PHASE 1-INFILL

FIRST PHILIPPINE INDUSTRIAL PARK (FPIP),

TANUAN CITY, BATANGAS

Position : Electrical Foreman/Supervisor

Job Description

DUTIES AND RESPONSABILITIES:

Responsible for the total construction work plan operation at site area.

Knowledge liaises with the control room direct and instructs commissioning and operation personnel assist and monitor locals which are training on the plan.

Understand maintenance turnaround and liaise with vendors Q.A dept and all discipline, foreman/technician skilled workers on all matter of start-up activities.

Knowledge must demonstrate, to know safe working practices appropriate to the location, and to demonstrate competence and contribution to hand over.

Isolation devices and methods of installation of control system.

Handover and reporting procedures of plan layout and its connection with other system.

Know how to identify process system faults to include lack of services and supply. And variances in services, mechanical and electrical breakdown process and utility setting deviations.

Limits of responsibility.

Jan.30, 2011 to Sept. 29, 2011 : Kentz Engineers & Constructors

(Electrical & Instrumentation)

Mozambique, Africa

Project : Moatize Coal Mine

Position : Electrician (Team Leader)

Job Description

Responsible for termination of instrument cable for I/O units or marshalling panel.

Gland and termination including small power & armored cable 4core x 240mm

Termination of MCC Panel to Isolator going to the motor 600 KW.

Cable pulling and termination of 500mm cable to MCC Panel

Assist and termination of internal connection in MCC according to the drawing

Installation of cable ladder, cable tray, cable trunking, wire gutter.

Termination of medium cable to safe ring from transformer 6.6KV.

Termination of power cable 500mm from neutral grounding resistor to transformer.

Loop-checking of cable and megger of power cable from motors to VSD 600KW.

Testing and commissioning of all electrical equipment such as Motors, Control panel,-

MCC Panel and Variable Speed Drive (VSD,).

Experienced in Plant Mining Construction and Pre-Commissioning

July 12, 2009 to July 15 2010 : Anel & Elektrosis Joint Venture

P.O. Box 2398

Doha, Qatar

Position : Electrical Foreman

Project : Qatar National Convention Center

Doha, Qatar

Overall Responsibilities:

Responsible for site supervision

Responsible for ensuring the quality and workmanship of the electrical installation

Responsible for the safety and well being of my workers.

To make accurate report regarding accomplishment of my group.

Estimates the time and material costs required for projected jobs; keeps cost and job records and submits reports; initiates requisitions for supplies, tools, and equipment.

Thorough knowledge of the practices, methods, equipment, materials, and tools of the electrical trade

Trains and instructs subordinates on detailed procedures.

Supervision of cable gland and termination works of High voltage (11kV) and Medium (1kV/600V) Voltage incoming/outgoing cables.

Key Activities:

To be responsible in ensuring that I will get all the necessary instruction from supervisor and engineers.

To ensure the responsible supervisor and engineer will give me a copy of all documents,

Drawings catalogues and handbooks relating to the project.

To ensure all the installation works will comply to the standard and specification of the project.

To make an inventory of all materials, tools, and equipment and to ensure there are enough materials, tools and equipment available at site.

To assign work assignment to charge-hands in accordance with the project program.

Experienced in Testing and Commissioning of MCC and VFD.

Termination of MCC panel, ACU, Chillers.

Installation of Bus Duct, small power, IT, emergency lighting, normal lighting, security, fire alarm, conduits and steel raceway.

Installation of MICC cables for extra-low voltage, power and lighting system.

February 2007 to March 2009 : Rotary Humm (M.E.P.) Service LLC

P.O.Box 28834 Dubai, U.A.E.

Position : Electrical Foreman

Projects : ATLANTIS (The Palm)

Jumeirah Hotel

Dubai, U.A.E.

: (IBIS Hotel) & (Novotel Hotel)

AI Barsha, Sheik Sayed Road

DUBAI, U.A.E.

Reports to : Supervisor

Overall Responsibilities:

Responsible for quality of installation, ensuring that it keeps to plan and that it achieves the desired profit.

Ensure good supervision of the work and the personnel for an assigned area.

Ensure all reports are accurate and delivered on time.

Ensure all personnel are working to a high standard of workmanship and strictly to the project safety plan.

Key Activities:

Ensure that I receive briefings on all aspects of construction works from the responsible supervisor / manager.

Ensure the responsible supervisor / manager has a copy of all documents, drawings, catalogues and handbooks relating to the project.

Ensure that the works standard complies to the specification for all works installed by my team.

Organize stock control on site.

Assign packages of work to charge-hands in accordance with the project.

April 15, 2000 - April 11, 2001 TYCO Engineering & Construction (Malaysia)

Sdn Bhd, Kulim, Kedah, Darul Aman, Malaysia

Position : Electrician

Project : Silicon Water Technology Fabrication Facility

Job Description:

Layout installation of medium and high voltage transformers, switchgears, panel boards and other electrical devices. Layout installation of wire mesh, cable trays, and electrical conduit for the raceway. Installation of lighting fixtures, power outlets, smoke detectors, card reader, magnetic door lock, fire alarm system. Installation of generator for the temporary electrical supply. Installation of grounding system for the 66KV and 33KV OHL pole. Cable pulling of supply power for the pump motors. Duties also include testing and commissioning.

Install electrical raceway (i.e. cable tray, rigid steel conduit pipe, wire trunking)

Install and mounting of electrical boxes and devices (i.e. utility box, junction box, receptacle

Outlets, lighting fixtures, emergency lightings, switches, over current protection devices.

Install electrical equipment (i.e. distribution of panel board, M.C.C panel, dry type transformer)

Cable pulling and termination according to cable routes and load schedules.

Control cable wiring and termination.

loop check and insulation resistance test of electrical circuits

Assemble modifications of motor control center and motor starter (i.e. control cable wiring of output signal (analog for VFD interface to programmable logic control PLC panel current of overload protection.

Sept. 10, 1997 – July 15, 1998 FPD Guardforce LTD.

Guardforce Center, 3 Hok YuenSt, Hung Hom,

Kowloon, Hong Kong

Position : Electrician

Project : Hong Kong International Airport Chek Lap Kok

Job Description:

Responsible for layout and installation of cable ladder, cable tray, trunking and conduit pipe.

Responsible for cable pulling (control cables) and termination inside process interface building and also in the field.

Responsible for termination and testing of information command station (ICS), field control system, (FCS) and emergency shutdown panel.

Termination and wiring of Door Access Control & Detection Unit.

Mounting and termination of Card Reader Keypad and Non-Keypad, Door Motor Holder, Based Magnetic Switch, Electro Magnetic lock, Break glass, Door Interface Unit, Power Supply Unit, Public Address System.

Pulling of Fiber Optic cable, Belden Cable and termination for fixed linked bridge terminal.

Mounting of pole for intruder detection security system (MICROWAVE)

Installation and termination of Microwave System and CCTV .

March 4, 1996 – April 1997 Balfour Beatty limited

Suite 2102, 21/F Tower 6, China Tsim Sha Tsui,

Hong Kong

Position : Electrician

Project : Hong Kong International Airport Chek Lap Kok

Job Description:

Responsible for layout and installation of cable ladder, cable tray, raceway and conduit pipe.

Assigned in substation for gland and termination of low voltage cable.

Performed cable pulling of low voltage and high voltage cables includes dressing and c1eatching of cables

Performed erection of electrical panel boards and snagging.

Mounting and alignment of electrical equipment such as 11KV high voltage switchgear Board, low voltage switchgear board, power factor correction unit, 110 & 30 volts battery charger, power transformer 1500KVA and taking up tightness of BUS Bar jointing.

Fabrication of support and installation of 5 layers by .78 kms cable tray for power control, communication and instrument cables both eastern and western tunnel.

Pulling of direct burial cable power and pilot cable from one substation to another. (BICC Cable 240mm2 up to 1000mm2).

Gland meggering and termination of control cable at respective terminals.

Filling of battery solution (electrolyte) on battery charger 110 and 30 volts for switchgear control protection.

Modification and relocation of equipment as of as built and final drawing.

October 17, 1988 – June 9, 1993 : AI Henaki Trading & Construction Company

P.O. Box 6716 Riyadh 11452, Riyadh, K.S.A.

Position : Electrician/Operator of Water Treatment Plant

Project : Water Treatment Plant

Job Description:

Responsible for electrical pipes, cable trays, cable ladders and wiring installation of electrical scheme of construction as specified in the drawing.

Power distribution cable laying of low voltage cables, perform the works on termination at the transformers.

Do the works in fabrication and assembling; installation of motor pumps and ventilation fans control panels. Installation of rigid steel conduit (RSC), Poly Vinyl Chloride (PVC) conduit pipe.

Installation of fire alarm detector, smoke heat detector, bell and break glass control panel. Termination of control wiring master and local control panel.

Termination of power cable at 830KW, supplied generator.

Termination of power cable for 2.5kv submersible pump.

Synchronization of incoming 5.5kw generator into outgoing grid.

July 11, 1987 – July 7, 1988 : Arabian Technical Contracting Company

P.O. Box 2967, Riyadh 1161 K.S.A.

Position : Senior Electrician

Job Description:

Installation of motor control systems (MCC), fire alarm system, telephone and intercom systems, lighting and power layout.

Maintenance and servicing of motors, transformers, MCC's and capacitors heaters, compressors, lighting fixtures and other electrical appliances.

Lay outing of electrical pipes and direct submerge cables.

Erection street lighting 16, 20 & 30 meters high mass steel poles traffic light poles and installation of controllers.

Installation and termination of luminaries’ lamp.

Jointing and termination of power cable 13.8kv, XLPE Cable

Jointing of low voltage and high voltage cables using Raychem kit.

Hi-pot testing of high voltage insulation cables.

Electrical building and wiring installation.

PERSONAL INFORMATION:

Date of Birth : April 15, 1966

Place of Birth : Taytay, Rizal

Age : 49 years old

Nationality : Filipino

Civil Status : Married

Religion : Catholic

Height : 5”7”

Weight : 75 kgs.

I hereby certify that that the above information is true and correct to the best of my knowledge;

Edwin Villamor

Applicant



Contact this candidate