DANNON T. BEASLEY
BARGE SUPERINTENDENT
+1-228-***-**** *************@*****.***
**** ******* ***., ********** ** 39567
PERSONAL DETAILS
Nationality
Date of Birth
American
SUMMARY
DEDICATED ACHIEVER EXPERIENCED IN OFFSHORE CONSTRUCTION WITH TWENTY-TWO (22) YEARS OF EXPERTISE IN PROJECT EXECUTIONS, PIPELAY AND PLATFORM INSTALLATIONS ON DERRICK, AND LAY BARGE.
EXPERIENCE
BARGE SUPERINTENDENT
Swiber Offshore Construction Pte Ltd (Aug 2015 – Present)
Vessel : S.Conquest
Location : India and Singapore
Promoted to Barge Superintendent to manage and execute the following major projects :
Punj Lloyd ONGC WO-16 & SB-14 Pipeline Project
ONGC Pipeline Replacement Project
ONGC C-26 Cluster Pipeline Project
ONGC Daman Development Project
BARGE FOREMAN
Swiber Offshore Construction Pte Ltd (Nov 2012 – Jul 2015)
Vessel : S.Conquest
Location : India, Indonesia, Brunei, Myanmar, Vietnam and Singapore
Executed the following major projects :
Zawitka Offshore 28” Pipeline Installation
Brunei Shell Petroleum Bulan Bulan Pipeline (6”, 12”) & Riser Installation and Subsea Spool Tie-ins
Brunei Shell BSP Champion 7 Platform (installation of Riser, Riser Guards, and Subsea Spool Tie-ins)
Brunei Shell Petrol Osprey 10” and 16” Pipeline Installation
Premier Oil Pelikan 12” Pipeline Installation
Conoco Phillips South Belut 02 x 14” Pipeline Installation
ONGC Cluster 7 Project (4” & 6” Pipelay and Riser Installation, and J-Tube Installation on NT Platform)
PTSC / Su Tu Nau Project installation of 02 decks, 07 pipelines and modifications of WHP-B
BARGE FOREMAN
Petroleum Marine Services (2009 – Oct 2012)
Chet Morrison Contractors, Inc. (2006 – 2009)
Torch Inc. (2001 – 2006)
Vessel : PMS-12 DLB, CM-11 LB, CM-12, Express DPL, Rider LB, Midnight Runner LB
Location : Saudi Arabia, Egypt, Gulf of Mexico, Bay of Campeche, Boston Harbor
Installation Pipeline of various sizes ( 2”- 42”) & Riser Installation and Subsea Spool Tie-ins
Managed & Operated cranes of various tonnage and the control tower.
Supervised of all riggers, & welders.
Liaised with client representatives on requirements & issues.
Developed and Implemented ToolBox Meetings
Executed Anchor Setups
Planned and Plotted anchor patterns
CONTROL TOWER & CRANE OPERATOR
Horizon Offshore (1997 – 2001)
Torch Inc. (1994 – 1997)
Vessel : Pacific DLB, Atlantic DLB, American LB, Lone Star LB,
Location : Gulf of Mexico, Bay of Campeche, Boston Harbor, New York Harbor
Executed anchor winches and setups during pipelay constructions including spool and riser installation
Plotting, line tension, survey requirements and co-ordinates, vessel ballasting, trim and stability for all environment factors
Log-record of daily movement during projects
Diving Operations
Uploaded and Unloaded various size/tonnage of boats, pipe racks and trucks
TRAINING COURSE ACCQUIRED
Rigger Certification
Norm Awareness Certification
H2S Safety Certification
Lifeboat Training
Gulf Safe Certification
Crane Certification Course
Fall Protection Course
Water Survival
BOSIET
Confined Space Entry Course
REFERENCES
Stephen Church (Mr.)
Senior Vice President
(E) : *******.******@*****.***
Swiber Offshore Construction Pte Ltd
(Subsidiary of Swiber Holdings Ltd)
Engelbert D’Silva (Mr.)
General Manager
(E) : *******@*****.***
Offshore Engineering Resources Pte Ltd