RESUME
Bakersfield California, 93313
USA
: 661-***-**** (home)
661-***-**** (Mobile)
e- : *****************@*****.***
Leonardo A. Perez Jr., EIT
Position: Electrical Design Engineer / Electrical Engineer
Summary: Have more than 15 years of solid experience in providing engineering plans and design services for new installation or upgrades of electric power equipment. Provides technical guidance to young engineer, designer or drafting personnel. Reviews completed drawings for technical accuracy and compliance with client standard, specifications and NEC codes.
Experience:
1. March 2015 – Present Parsons Bakersfield California
Position: Project Designer – Oil and Gas
2. January 2013 – March 2015 TJCross Engr., Inc (a Parsons Coy.) Bakersfield California
Position: Project Design Coordinator
3. Aug. 2006 – January 2013 TJCross Engineers, Inc. Bakersfield California
Position: Senior Electrical Designer
4. January 2000 – August 2006 Al-Ittefaq Steel Products Company Dammam KSA
Position: Electrical Design Engineer
5. June 1997 – Jan. 2000 Hitachi Plant Engineering & Construction Co., Ltd Makati Phil.
Position: Electrical Design Engineer
Duties and Key projects:
Chevron, CAHN3 Water Cleaning Plant IGF Expansion, Lost Hills, CA.
Create electrical proposal drawings for new installations of Allen Bradley Motor Control Centers, Rockwell Variable Frequency Drives and cable tray layout for the whole facility.
Provide electrical one line diagram, electrical load list, wiring diagram (power, controls and instrumentations) and design / arrangement layout of the new equipment inside the electrical building.
Design the arrangement layout of the new equipment inside the electrical building as per NEC code working space and Client Safety in Design requirements.
Prepare electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing. Make sure all the calculations and specifications meet the minimum requirements of NEC codes, IEEE and client Safety in Design requirements.
Prepare hazardous area classification, grounding and electrical plan drawing. All electrical drawings been designed and checked as per the API-500, NEC codes, Client Standards and Safety in Design requirements.
Chevron, Sour Gas Injection Compressor K-450 and K-900 Project, Cymric, CA.
Create electrical proposal drawings for new installations of 480V Switchrack, 480V Compressors Variable Frequency Drive Nema 3R enclosures, PLC panel and electrical building layout.
Provide electrical one line, motor schematic diagram, electrical load list, wiring diagram of the Eaton Variable Frequency Drive panel, wiring diagram and installation details of all instrumentations.
Design the arrangement layout of the new electrical panels in a Switchrack as per NEC code working space requirements, NEMA enclosures types, and Client switchrack installations standards.
Design the layout of conduits for motor, instrumentations and junction box of the sour gas compressors as per API-500, NEC codes and client standards.
Determines the type of enclosures and installation requirements of electrical panels inside the hazardous area classification as per API-500 and NEC code standard.
Prepare hazardous area classification, grounding and electrical plan drawing. All electrical drawings been designed and checked as per API-500, NEC codes, Client Standards and Safety in Design requirements.
Prepare electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing. Make sure all the calculations and specifications meet the minimum requirements of NEC codes, IEEE and client Safety in Design requirements.
Chevron, 17Z Booster Compressor Repackaging Project, Cymric, CA.
Create electrical proposal drawings for new installations of 480V Motor Control Centers, 4.16Kv Variable Frequency Drive panels, PLC panel and electrical building layout.
Provide electrical one line, wiring and schematic diagram of 4.16KV, 1500HP motors power supply, electrical load list, wiring diagram of the 4.16KV Siemens Variable Frequency Drive panel, wiring diagram and installation details of all instrumentations.
Design the arrangement layout of the new equipment inside the electrical building as per NEC code working space and Client Safety in Design requirements.
Evaluate and re-design the layout of conduits for MV motor, instrumentations and junction box of the refurbished 1500HP gas compressors as per API-500 and NEC code standard.
Determines the type of enclosures and installation requirements of electrical panels inside the hazardous area classification as per API-500 and NEC code standard.
Prepare hazardous area classification, grounding and electrical plan drawing. All plan drawings been designed and checked as per the API-500, NEC codes, Client Standards and Safety in Design requirements.
Prepare electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing. Make sure all the calculations and specifications meet the minimum requirements of NEC codes, IEEE and client Safety in Design requirements.
Chevron, 31X Produced Water Plant and 15Z Water Injection Plant, Cymric, CA.
Create electrical proposal drawings for new installations of 12KV Cooper Reclosers and 12Kv distribution line for 3000KVA transformers, Eaton 480V Switchgears, Eaton 480V Motor Control Center and Eaton 480V Variable Frequency Drive panels ranging from 20HP to 600HP motors.
Design the arrangement layout of all electrical panels inside the building and layout of transformers and switchgears as per NEC code working space and Client Safety in Design requirements. These Includes the trench, electrical vault, conduit, conduit stub-up and cable tray layout and support as per NEMA VE2 standard.
Provide electrical one line diagram, electrical load list, wiring diagram of all the electrical panels and instrumentations for the whole water plant facility.
Design the layout of cable tray and MC cables for 600HP injection motors, skimming, backwash, oil, and agitator pumps motors, instrumentations and junction boxes for the whole water plant facility.
Prepare electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing. Make sure all the calculations and specifications meet the minimum requirements of NEC codes, IEEE and client Safety in Design requirements.
Support the client electrical contractors for installation, trouble shooting and commissioning of the 12KV recloses, LV Switchgears, Variable Frequency Drives and 125VDC battery cabinet.
Prepare hazardous area classification, grounding and electrical plan drawing. All drawings been designed and checked as per the API-500, NEC codes, Client Standards and Safety in Design requirements.
Oxy, 25Z and 29R Compressor Station, Elk Hills, CA.
Create electrical proposal drawings for new installations of 480V Motor Control Centers, 4.16Kv GE Multilin Starter panels, PLC panel and electrical building layout.
Provide electrical one line, wiring and schematic diagram of 2500HP motor, electrical load list, wiring diagram of 4.16KV GE Multilin starter panel, wiring diagram and installation details of all instrumentations.
Design the arrangement layout of the new equipment inside the electrical building as per NEC code working space and Client Safety in Design requirements.
Design the new layout of conduits for MV motor, instrumentations, PLC panel and junction box of the new 2500HP gas compressors as per API-500 and NEC code requirements.
Determines the type of enclosures and installation requirements of electrical panels inside the hazardous area classification.
Prepare hazardous area classification, grounding and electrical plan drawing. All drawings been designed and checked as per the API-500, NEC codes, Client Standards and Safety in Design requirements.
Prepare electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing. Make sure all the calculations and specifications meet the minimum requirements of NEC codes, IEEE and client Safety in Design requirements.
Oxy, PICO Lease - PICO Infrastructure Project, Long Beach, CA.
Create electrical proposal drawings for new installations of 12KV power pole and riser pole for 2500KVA transformers, load centers Switchgears and Baker Hughes 2.4KV Variable frequency drive for all producing and injection wells.
Design the arrangement layout of all electrical panels inside elevated electrical platform and layout of transformers and load centers switchgears as per NEC code working space and Client Safety in Design requirements. Including the conduit, conduit stub-up, cable tray layout and support as per NEMA VE2 standard.
Provide electrical one line diagram from 12KV down to 120Vac power supplying for the entire load center of drilling wells and switchrack, electrical load list, wiring diagram of all the electrical panels and instrumentations for the entire PICO lease infrastructure project.
Design the layout of cable tray and conduits for producing and injection wells, water tank and pumps motors, instrumentations, PLC panel and junction boxes for the entire PICO lease infrastructure project.
Prepare hazardous area classification, grounding and electrical plan drawing. All drawings been designed and checked as per the API-500, NEC codes, Client Standards and Safety in Design requirements.
Prepare electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing. Make sure all the calculations and specifications meet the minimum requirements of NEC codes, IEEE and client Safety in Design requirements.
Plain Exploration & Production Company, Arroyo Grande Water Reclamation Project, Arroyo Grande, CA.
Create electrical proposal drawings for new installations of 12KV power pole and riser pole for 1500KVA transformers, Eaton 480 Voltage Switchgears, Eaton 480V Motor Control Center and Eaton 480V Soft Start panels.
Design the arrangement layout of all electrical panels inside the building and layout of transformers and switchgears as per NEC code working space and Client Safety in Design requirements. Including the conduit, conduit stub-up, cable tray layout and support as per NEMA VE2 standard.
Provide electrical one line diagram from 12KV down to 120Vac power supplying both for two electrical buildings, HYLA steam generators switchrack, and FWKO panels, electrical load list, wiring diagram of all the electrical panels and instrumentations for the whole water reclamation plant.
Design the layout of cable tray and conduits for HYLA steam generators, free water knock out (FWKO), injection and water pumps motors, instrumentations, PLC panel and junction boxes for the whole water reclamation plant.
Prepare electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing. Make sure all the calculations and specifications meet the minimum requirements of NEC codes, IEEE and client Safety in Design requirements.
Prepare design and calculations as per NEC Code Article 695 requirements of fire pump system of the plant.
Duties and Key projects (Saudi Arabia):
Al Ittefaq Steel Products Company, Mill Reheating Furnace, Dammam and Jeddah Saudi Arabia
Create electrical proposal drawings for new 400V Power Distribution Board panel and Motor Control Center for 60TPH furnace blowers, hydraulic power pack system and charging roller table motors.
Design the arrangement layout of all electrical panels inside the building, design the controller panel, controls and schematic diagrams for the hydraulic power pack system and roller tables of the re-heating furnace.
Design the layout, wiring and fabrication of the pulpit control room and control desk of the 60TPH Re-heating furnace operator.
Prepares electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing.
Al Ittefaq Steel Products Company, Mill Rolling Stand and Cooling Bed, Dammam and Jeddah Saudi Arabia
Create electrical drawings for 400V Power Distribution Board panel, DC Drive Panel for all rolling stand, crop and flying shear DC motors and Motor Control Center for cooling bed walking beam, roller and cold shear motor.
Design the arrangement layout of all electrical panels inside the building; design the controller panels, controls and schematic diagrams for walking beam, roller table and cold shear motor.
Design the layout, wiring and fabrication of the pulpit control room and control desk for cooling bed operator.
Prepares electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing.
Al Ittefaq Steel Products Company, Mill Wire Rod, Dammam Saudi Arabia
Create electrical proposal drawings of the wire rod mill electrical equipments bought in England for layout of power and control panels, Power Distribution Board panel, evaluation and re-design of DC Drive Panel for rod DC motor, AC drive for the roller table motors and control panels for the hydraulic compactor motors.
Designing the arrangement layout of all electrical panels inside the building, design the location of the instrumentations and wiring diagrams, and re-design the controller panels, controls and schematic diagrams of compactor hydraulic and bundling system of the rod mill.
Design the layout, wiring and fabrication of the control room and control desk for the compactor and bundling rod system operator.
Prepares electrical design calculations. These calculations include raceway sizing, cable tray sizing, conduit and wire sizing, voltage drop, cable pulling, panel, motor and circuit breaker sizing, transformer load and junction box sizing.
Training: July 1998 – Dec. 1998 Hitachi Plant Eng’g & Const’n Co., Ltd Tokyo Japan
Education : June 1991 – March 1996 Adamson University Manila, Philippines
Bachelor of Science in Electrical Engineering
Registration / Licensure:
FE-EIT, Electrical (158740) - Visalia, California
Registered Electrical Engineer - Manila, Philippines
Registered Master Electrician - Manila, Philippines
Computer Background:
AutoCad (2D and 3D)
Microstation (2D and 3D)
ETAP 12.6.0 & 14
Microsoft Office
References:
Available upon request.
Others:
Authorized to work in USA (Permanent Resident)
Flexible and willing to relocate