S.PRAKASH
E -Mail : ******************@*****.*** (Contact Mobile no.729-***-****)
PROFESSIONAL OBJECTIVES
Improving level of competence and reliability through hard working and dedication also to continually upgrade with technical skills through observations and perseverance.
PERSONAL PROFILE
Date of Birth & Age : 31.05.1973
Sex : Male
Marital Status : Married
Passport No. : M2198370
Position : AUTOCAD Draughtsman
PERMANENT ADDRESS : 59, Arasankattu Street,
Pothanur – Post,
Namakkal (Dist),
PIN-638 181, Tamil Nadu, India.
TECHNICAL QUALIFICATIONS
Draughtsman Mechanical(National Trade Certification)
July 1990 – July 1992 Indian Red cross Training Institute, Chennai.India
* Aggregate Marks obtained : 79 %
* Class Obtained : First Class
Draughtsman Mechanical(National Trade Apprentice Certification)
July 1994 – July 1995 BHEL- Training Institute, Trichy.India
* Aggregate Marks obtained : 75 %
* Class Obtained : First Class
COMPUTER SKILLS : AutoCAD 2006, 2008,R14, LT2011,LT216
LANGUAGES KNOWN : Tamil & English.
EXPECTED SALARY : 8000 Dh.
Contd.. 2
:: 2 ::
Professional Technical Experience :
M/s. BEC PROJECT LTD. SAIDAPET CHENNAI.
Since FEB2005 TO STILL NOW “Senior CADD Draughtsman (Detailing & Checking)”
CIVIL & Structural
Preparation of Detailed Drawing for Concrete reinforcement detail Roof Main structure, Bracing,Column, Purlin, side cladding staircase & mezzanine beams etc.
M/s. PERFECT INDUSTRIES L.L.C (DUBAI)
FEB. 2002 TO SEP.2004 as “Senior CADD Draughtsman (Detailing & Checking)”
Project : SHARJAH INSTITUTE OF TECHNOLOGY
Client. : RULER’S OFFICE, SHARJAH
Supplier : PERFECT INDUSTRIES L.L.C
Preparation of Detailed Drawing for Roof Main structure, Bracing,Column, Purlin, side cladding staircase & mezzanine beams etc.
Project : CEMENT PLANT
Client. : AL KHATER - QATER
Supplier : PERFECT INDUSTRIES L.L.C
Preparation of Detailed Drawing for Roof Main structure, Bracing,Column, Purlin, side cladding staircase & mezzanine beams Hopper,tanks,curing chamber etc.
Project : EMAAR HEAD QUARTERS.
Client. : NOOR GROUP CONSULTANTS
Supplier : PERFECT INDUSTRIES L.L.C
Preparation of Detailed Drawing for Roof Main structure, Bracing,Column, Purlin, staircase & mezzanine beams Roof Raised Floor Framing & Grating Details etc.
Project : SS STORAGE TANK
Client. : MASAFI MINERAL WATER
Supplier : PERFECT INDUSTRIES L.L.C
Preparation of Detailed Drawing for Roof Main structure, Bracing,Column, Purlin, side cladding staircase & mezzanine beams etc.
Contd..3
:: 3 ::
Project : CONFERENCE PALACE HOTEL (ABU DHABI-UAE)
Client. : SIX CONSTRUCT
Supplier : PERFECT INDUSTRIES L.L.C
Preparation of Detailed Drawing for Roof Main structure, Bracing,Column, Purlins & mezzanine beams Catwalk Access ladders, Handrails etc.
M/S, DSM SOFT (P) Ltd., TRICHY.
March – 2001 to Sep.2002 as Senior CADD Draughtsman
M/S,GEA ENERGY SYSTEM (I) Ltd., Chennai.(An ISO 9001 Company)
JULY 1997 – FEB 2001 as Senior CADD Draughtsman (Detailing & Checking)
Project : IOCL-MATHURA REFINERY EXPANSION (SRU)
Client. : PETROFAC INTERNATIONAL LTD.
Supplier : GEA ENERGY SYSTEM (I) Ltd., Chennai.
Project : IOCL-HALDIA
Client. : STORK ENGINEEERS & CONTRCTORS – NETHERLANDS.
Supplier : GEA ENERGY SYSTEM (I) Ltd., Chennai.
Project : CDUI - LPG RECOVERY ENHANCEMENT
Client. : CRL – COCHIN.
Supplier : GEA ENERGY SYSTEM (I) Ltd., Chennai.
Project : LPG - LAKWA
Client. : GAS AUTHORITY OF INDIA LTD.
Supplier : GEA ENERGY SYSTEM (I) Ltd., Chennai.
Project : KESAR PETROPRODUCTS
Client. : TUMA TURBOMACH LTD.
Supplier : GEA ENERGY SYSTEM (I) Ltd., Chennai.
Contd..4
:: 4 ::
Project : LAB FRONT END - BRODA
Client. : NIRMA LIMITED – AHMEDABAD.
Supplier : GEA ENERGY SYSTEM (I) Ltd., Chennai.
Project : INDIAN OIL CORPORATION LTD.,
Client : ENGINEERS INDIA LTD., New Delhi
Supplier : GEA ENERGY SYSTEM (I) Ltd., Chennai.
Preparation of assembly and detail drawings of Air Cooled Heat Exchangers.
Preparation of assembly and detail drawings Pressure Vessel as per ASME code.
Preparation of Isometric Piping and Bill of Materials,
Preparation of Detailed Drawing for Heat Exchangers, Main structure, Bracings, Staircase, Column, Platform, Platform and support, Chq-plate, handrails, Stack platforms, ladder, etc.
Detailing of ducting Arrangements, Ducting Layout drawings for Flue gas Ducting, Air Ducting systems & Duct Supporting.
Preparation of design drawing & Fabrication drawing for Main Structure, Bracings.
Preparation and Detailing of Roof, Purlin, Side Cladding, Stair cases, Ladder & Other all Structural parts.
Preparation of G.A and Fabrication drawing for Tower, Vent stack Tower.
Preparation of Pressure Parts Drawings for Furnace, Panels, Headers, Drums, Bed coil, Super heater & Economiser for FBC Boilers.
Preparation of Supporting structure & Ducting Drawings
Preparation of Pressure Parts Drawings for Furnace, Water Wall Panels
. Preparation of Supporting structure & Ducting Drawings
Contd.. 5
:: 5 ::
M/s VEESONS ENERGY SYSTEM (P) LTD., Trichy. India
January 1996 – June 1997 as CADD Draughtsman (Detailing & Checking)”
Project : NEYVELI LIGNITE CORPORATION LIMITED
2x220 MW EXPANSION OF FIRST
THERMAL POWER STATION
Client : ANSALDO ENERGIA S.P.Q ITALY
Supplier : VEESONS ENERGY SYSTEM (P) LTD., Trichy. India
Preparation of Detailed Drawings for Boiler Main Structures & Bracings.
Preparation and Detailing of Stair cases, Column, Platform, Truss, Girder & Chequered Plate.
Detailing of Stack Assembly, Ladders & Handrails
Preparation and Detailing of Duct Assembly and Duct supports.
Preparation of Detailed Drawings for Boiler Main Structures & Bracings.
Preparation and Detailing of Stair cases, Column, Platform, Truss, Girder, Gratings.
Preparation and Detailing of ALL Duct Assembly, Duct Connections Duct supports.
Detailing of Piperack Structures & Duct Supporting Structures.
M/s IAEC INDUSTRIES MADRAS LTD,.
July 1992 –August 1994 as CADD Draughtsman (Detailing & Checking )
Preparation of Material Handling Equipments Belt Conveyors, Chain Conveyors, Bucket Wheel Elevators, Screw Conveyors Drawings.
Preparation of Supporting structure Drawings for Material Handling Systems
Preparation of Pressure Parts Drawings Furnace,Panels, Headers,Drums,Bed coil,Super heater & Economiser for FBC Boilers.
Preparation of Supporting structure & Ducting Drawings.
Place : Chennai - 15 Thanking You,
Date : 19-07-2016
Yours Faithfully,
( S.PRAKASH )