ROY REZA SIREGAR
Indonesian,
CURRENT ADDRESS
Perumahan.Buana Raya,Cluster Orleander No 41
Kel.Sei langkai Kec.Sagulung Batu Aji
Batam 29439
Phone :+62-823-****-****
E.mail:****************@*****.***
**************@*****.***
CARRIER PROFILE
More than Nine years of experienced as Structure Completion of piping of offshore oil and gas platform such as Wellhead platform, SPAR, FPSO’S, CPP, AND MODULE. I am weld known as a team player and have never left a project under bad conditions. Construction Project present many challenges and it give a good sense of achievement and job satisfaction to have been a par t of team that gets the job done
Understand and implement Engineering Policies and yard procedures through working practice
Ability to read shop drawing,Isometric,Piping & instrument Diagram (P&ID)
Responsibility for fabrication pipe in workshop
Creative And innovative in approach of finding solution
Having good personal & Interpersonal skill, Leadership potential and to be able of working in team.
Safety awareness ( support company Incident And Injury Free working environment Program)
COURSES/TRAINING & AWARD:
Bolting and Flange Management Integrity (23,24-Sept 2015 )
MJI 10 / 18 / 19 Joint Integrity Bolting
Certificate of completion of Hydro test & Pneumatic test Training
Flange Management Training Conducted by Hydra Tight
BOSIET OPITO Training 5700
EST Group’s GripTight™ Test Plugs Training.
Basic Rigging
Confined Space Training
IIF Commitment Certificate
Certificate Valve Training
WORK HISTORY
April 23th2016 – current
Company: Hydratight
Position: Lead Bolting Technician
Project: - QCON, Qatar Shell ( Qatar )
Summary of duties:
Completing all duties according to applicable safety measures and published procedures.
MJI 10 / 18 / 19 Joint Integrity Bolting
MJI 10 / 18 / 19 Joint Integrity Bolting
Using the ring Wrenches, Pipe wrenches, LDF Wrenches .RSL 2,4,6,8,14,18,30,H, Socket Wrenches, Square Drive key, Nor bar hand key, hydraulic pump, Cupper Hammer, Nut Speeder, Flange Splitter, Air Hose, twin Hose.
Repairing or replacing defective Material parts.
Carrying out maintenance.
Wearing appropriate safety clothes in designated safety areas.
Consulting with senior colleagues regarding technical issues.
Keeping the workplace in an organized and clean condition.
Correctly using hand and power tools.
Cleaning and lubricating Bolt, Pump, Wrench other parts.
September 22th 2015 – November 21th 2015
Company: Hydratight
Position: Lead Bolting Technician
Project: - Petro Rabigh( Saudi Arabia )
Summary of duties:
Completing all duties according to applicable safety measures and published procedures.
Using the ring Wrenches, Pipe wrenches, LDF Wrenches .RSL 2,4,6,8,14,18,30,H, Socket Wrenches, Square Drive key, Nor bar hand key, hydraulic pump, Cupper Hammer, Nut Speeder, Flange Splitter, Air Hose, twin Hose.
Repairing or replacing defective Material parts.
Carrying out maintenance.
Wearing appropriate safety clothes in designated safety areas.
Consulting with senior colleagues regarding technical issues.
Keeping the workplace in an organized and clean condition.
Correctly using hand and power tools.
Cleaning and lubricating Bolt, Pump, Wrench other parts.
MJI 10 / 18 / 19 Joint Integrity Bolting
November13th2015-27march2016
Company: HRE/HALLIBURTON.JAWA TIMUR
Position: Technician Bolting
Project :Bayu Urip Blok Cepu,Exxon Mobil
Summary of duties:
MJI 10 / 18 / 19 Joint Integrity Bolting
Hydro and Pneumatic Testing
Check Test Pack and NDT Cleared
Check line as per Isometric Drawing Test and permanent piping component
Install temporary testing components (flange, fitting, hoses)
Install testing equipment, tools and instrument (Manifold, Recorder, Test gauge, PSV, Pump or Long Tom skid
Supervise and coordinate with supervisor or foreman piping regarding Reinstatement issue
Install flange included bolting tightening
Check drawing before execution bolt tightening
Ensure flange joint and bolting tightening are manage and completed prior testing
Coordinate with the testing Group and preservation group that the testing and line cleaning has been Completed and ready For Reinstatement.
Support and adhere of the implementation of safe working Practice high Quality, Productivity and Compliance with the code of business Conduct
Make daily report or schedule, What we do next time
January2015 April 2015
Company:UGF/WASCO Engginering Batam
Position:Technician Hydrotesting/Bolting
Project :Modec FPSO Brazil
Summary of duties:
Hydrotesting and Bolting
Check Test Pack and NDT Cleared
Check line as per Isometric Drawing Test and permanent piping component
Install temporary testing components (flange, fitting, hoses)
Install testing equipment, tools and instrument (Manifold, Recorder, Test gauge, PSV, Pump or Long Tom skid
Supervise and coordinate with supervisor or foreman piping regarding Reinstatement issue
Assist Production Engineer to ensure material,Fabrication and Installation are in accordance with drawing and specification
Coordinate Install flange included bolting tightening
Check drawing before execution bolt tightening
MJI 10 / 18 / 19 Joint Integrity Bolting
Ensure flange joint and bolting tightening are manage and completed prior testing
Juni2014 –November2014
Company: TABEA/HALLIBURTON
Position Technician Hydrotesting/Bolting
Project:Aramco,Hasbah/Arabia
ENI,Tanjung Balai Karimun
Summary of duties:
Check line as per Isometric Drawing Test and permanent piping component
Supervise and coordinate with supervisor or foreman piping regarding Reinstatement issue
Assist Production Engineer to ensure material,Fabrication and Installation are in accordance with drawing and specification
Coordinate with the testing Group and preservation group that the testing and line cleaning has been Completed and ready For Reinstatement.
Support and adhere of the implementation of safe working Practice high Quality, Productivity and Compliance with the code of business Conduct
MJI 10 / 18 / 19 Joint Integrity Bolting
Agust29th2013–Agust02th 2014
Company: PT.SMOE INDONESIA.BATAM
Position :Technician Hydrotesting/Pneumatic tes/Bolting
Project Australia/APLNG
Summary of duties:
MJI 10 / 18 / 19 Joint Integrity Bolting
Hydro and Pneumatic Testing
Check Test Pack and NDT Cleared
Check line as per Isometric Drawing Test and permanent piping component
Install temporary testing components (flange, fitting, hoses)
Install testing equipment, tools and instrument (Manifold, Recorder, Test gauge, PSV, Pump or Long Tom skid
Supervise and coordinate with supervisor or foreman piping regarding Reinstatement issue
Assist Production Engineer to ensure material,Fabrication and Installation are in accordance with drawing and specification
Install flange included bolting tightening
Check drawing before execution bolt tightening
Ensure flange joint and bolting tightening are manage and completed prior testing
Coordinate with the testing Group and preservation group that the testing and line cleaning has been Completed and ready For Reinstatement.
Support and adhere of of the implementation of safe working Practice high Quality, Productivity and Compliance with the code of business Conduct
Make daily report or schedule, What we do next time
Dec 30th2009 – Oct 15th 2013
Company: PT. McDermott INDONESIA.BATAM
Position:MechanicalComm, Hydrotest Technician Flanges Management reinstallation
Project: KJVG Gorgon Project & Chevron CPP & LQ Utility Project
Summary of duties:
Piping
MJI 10 / 18 / 19 Joint Integrity Bolting
Hydro and Pneumatic Testing
Check Test Pack and NDT Cleared
Check line as per Isometric Drawing Test and permanent piping component
Install temporary testing components (flange, fitting, hoses)
Install testing equipment, tools and instrument (Manifold, Recorder, Test gauge, PSV, Pump or Long Tom skid
Supervise and coordinate with supervisor or foreman piping regarding Reinstatement issue
Assist Production Engineer to ensure material,Fabrication and Installation are in accordance with drawing and specification
Coordinate with the testing Group and preservation group that the testing and line cleaning has been Completed and ready For Reinstatement.
Support and adhere of of the implementation of safe working Practice high Quality, Productivity and Compliance with the code of business Conduct
Make daily report or schedule, What we do next time
Supervise and coordinate with supervisor or engineering piping regarding Hydrotest and Pneumatic testing
Make daily report or schedule, What we do next time
Supervise and coordinate with supervisor or engineering piping regarding Hydrotest and Pneumatic testing
Assist Production Engineer to ensure material,Fabrication and Installation are in accordance with drawing and specification
Install flange included bolting tightening
Check drawing before execution bolt tightening
Ensure flange joint and bolting tightening are manage and completed prior testing
Coordinate with the testing Group and preservation group that the testing and line cleaning has been Completed and ready For Reinstatement.
Support and adhere of of the implementation of safe working Practice high Quality, Productivity and Compliance with the code of business Conduct
Make daily report or schedule, What we do next time
Supervise and coordinate with supervisor or engineering piping regarding Hydrotest and Pneumatic testing
Supervise and coordinate with supervisor or foreman piping regarding Reinstatement issue
March 29th2003 – August 28th 2003
Company: PT. McDermott INDONESIA.BATAM
Position:Pre- Comm, Hydrotest Technicians Flanges Management reinstallation
Project: - Belanak FPSO
Summary of duties:
Piping
MJI 10 / 18 / 19 Joint Integrity Bolting
Hydro and Pneumatic Testing
Check line as per Isometric Drawing Test and permanent piping component
Install temporary testing components (flange, fitting, hoses)
Install testing equipment, tools and instrument (Manifold, Recorder, Test gauge, PSV, Pump or Long Tom skid
Supervise and coordinate with supervisor or foreman piping regarding Reinstatement issue
Assist Production Engineer to ensure material,Fabrication and Installation are in accordance with drawing and specification
CooInstall flange included bolting tightening
Check drawing before execution bolt tightening
Ensure flange joint and bolting tightening are manage and completed prior testing
rdinate with the testing Group and preservation group that the testing and line cleaning has been Completed and ready For Reinstatement.
Support and adhere of of the implementation of safe working Practice high Quality, Productivity and Compliance with the code of business Conduct
Make daily report or schedule, What we do next time
Supervise and coordinate with supervisor or engineering piping regarding Hydrotest and Pneumatic testing
Check line as per Isometric Drawing Test and permanent piping component
Install temporary testing components (flange, fitting, hoses)
Install testing equipment, tools and instrument (Manifold, Recorder, Test gauge, PSV, Pump or Long Tom skid
Supervise and coordinate with supervisor or foreman piping regarding Reinstatement issue
cleaning has been Completed and ready For Reinstatement.
Support and adhere of of the implementation of safe working Practice high Quality, Productivity and Compliance with the code of business Conduct
Make daily report or schedule, What we do next time
Supervise and coordinate with supervisor or engineering piping regarding Hydrotest and Pneumatic testing