Edward Jackson
Redcar
Cleveland
Ts10 1pp
D.O.B 03-01-1955
An experienced Engineer/supervisor who offers a wide range of transferable
skills. Prioritises workload according to deadlines and utilizes excellent
communication skills with work colleagues at all levels. A flexible and
adaptable team member who undertakes his work with enthusiasm.
September 2015 to present date.
Doosan Babcock- Area Piping Supervisor.
TGE Ethane Project
Grangemouth, Scotland.
Installation of process pipe-work on new Ethane storage and
Process facility. Issuing isometrics and 3D model drawings to
Tradesmen, expediting pipe spools, materials and equipment,
Deliver toolbox talks to workforce, liase with management and
Client on progress and ensure safe working practices are used.
August 2013- June 2015
Petrofac-Piping Superintendent
Shetland Gas Plant
Shetland Isles.
Management and supervision of supervisors and tradesmen
on construction of new LNG Plant for Total. Preparation of work-packs
and permit to work allocation, Issuing of relevant P&I D's, Isometrics
and G A's to supervision and explaining scope of works.
Red Lining Isometric drawings for test packs prior to handover to Test Team.
Providing technical assistance with the field engineers, and promoting HSE
approved working practices to the workforce. Ensuring toolbox
talks and preparatory talks are undertaken, attending site
coordination meetings and daily progress meetings with senior
management. Manage sub-contractors and ensure that works
are installed to clients specifications, put in place relevant guidelines
for certification processes, and encourage a HSE inspired work ethos.
May 2013- August 2013
Interserve. Piping Supervisor
Runcorn TPS
Cheshire
Installation of 1st & 2nd pass pipework on economisers on new EFW
Thermal power station in the Wirral, also low and high pressure pipework
installation on evaporators, punch out of systems and testing to same.
Daily supervision of pipefitters and welders, toolbox talks, PTW acquisition,
Risk assessment and method statement review and pre work assessment checks.
Attendance at planning and progress meetings with company and client
representatives. Recording man hours (Timesheets).
July 2012- May 2013
Doosan-Babcock. Piping Supervisor
Inneos, Grangemouth, Scotland.
Supervision of piping and structural trades on new Tail Gas
Unit for existing S.R.Us on inneos refinery. Also shutdown
Works in same plant for process tie-ins. Preparing work permits,
And work packs, and allocating work to labour force. Submission of
Timesheets on a daily basis. Allocation of work to multi-trade labour
force on KG Flex- Ethylene project. Including, preparation of work
packs, field surveys, procurement of piping materials and requisition
of pre-fabricated spools, and issueing of permit to work documents.
Punch-out of piping systems prior to hand over to test team.
March 2012 - May 2012
Amec. Piping Supervisor, North Tees
Shutdown works to existing chemical plant,works included
Replacement of carbon steel &stainless steel pipework as
Per clients requirements. Hydrostatic testing to same pipework
And re-instatement after testing.
Nov 2011 Feb 2012-
Fabricom Oil & Gas.
Piping supervisor, SSI Redcar Blast Furnace Project.
Removal of old piping systems and replacement of same
To existing steel plant prior to re-commissioning of plant
And start up. Works included cooling pipework, Releif flare
Pipework, steam tracing pipework & Instrument and breathing
Air pipework. Punch-out of piping systems prior to hydro-testing,
re-instatement and hand over
Jan 2009 December 2009
Fabricom GDF SUEZ.
Piping supervisor Supervision of installations on new
Bio-fuels plant for Ensus at Wilton International site.
Work included overseeing fabrication of carbon &
Stainless steel pipework and erection and testing
To clients specifications.
October 2003 October 2008
Manager Riverside homes probation hostel.
Management of maintenance team, carrying out preventative
Maintenance to boiler houses, chiller units,and all heating and
Ventilation systems in Government Probation buildings.
November 2002 October 2003
Piping supervisor SPIROTEK B.V Groningen, NETHERLANDS.
Supervision of piping installations on new polypropylene plant. Work included
expedition of materials, fabrication and erection of carbon and stainless steel
pipe work. Punching out of pipework systems prior to re-instatement and
handover to Hydro test team.
April 2001 October 2002
Sub-contract Supervisor-Deutsche-Babcock.
Supervision of various work packages on re-vamp and new construction on
Flexi-Coker Refinery in Euro port Rotterdam. Works included overhaul of
existing Hydro treating plant and installation of new piping systems to new
plant.
April 1996 March 2001
Supervising Engineer. James Scott Major Projects.( AMEC)
Supervision of new cooling tower installations and associated piping systems at
GCHQ Cheltenham, also installation of new Pump House, Plant and Pipe work.
Supervision of new piping installations and associated plant to BNFL Saltwick,
Preston. Supervision of workforce on various contracts throughout the UK
including shutdown works and plant conversions to thermal power stations.
January 1990 February 1996
Piping/Mechanical Co-ordinator AMEC.
Co-ordination of piping and mechanical works packages on various contracts
throughout the U.K. Works included work at B.P Coryton, Lindsey Refinery,
B.P. Grangemouth and shut-down works on Wilton complex, Cleveland.
January 1988 December 1989
Piping Supervisor A.O.C.
Supervision of pipe work packages on new B.P. refinery at Whych Farm Dorset,
and FurzeyIsland Poole, Dorset.
January 1987- December 1987
Piping supervisor- Steels engineering.
Supervision of workforce installing carbon steel,stainless steel & kunifer
Pipework on Shell Eider production module prior to hydrostatic testing
And load out onto barge. Work included expediting System pipe spools,
Site modifications, site erection, test verification, & reinstatement.
April 1986-December 1986
Piping supervisor- U.K. Construction.
Installation of new pipework on Blast-Furnace rebuild at Redcar Steelworks.
Including cooling water, flare relief, & nitrogen pipelines. Flushing of
pipework
Prior to hydrostatic testing & re-instatement.
July 1985- April 1986
Piping Supervisor- Fluor B.V.
Supervision of piping installations on new Flexi-Coker Refinery in Rotterdam,
Netherlands. Overseeing works carried out by sub-contract labourforce,
From off-site fabrication to site erection,hydrostatic testing & reinstatement.
Materials used included: Chrome-Moly,Stainless Steel & Carbon Steel.
Qualifications
HNC Mechanical Engineering.
C&G Piping and Mechanical Services.
Site Safety passport held.
Bosiet-Offshore Certified.
ECB-compressed air breathing.
Interests
Cycling, walking and Golf.
Contact Numbers
Tel: 016**-******
Mob: 078********
Total/CNL/2015