Edward Jackson

** ****** ****

Redcar

Cleveland

Ts10 1pp

D.O.B 03-01-1955

An experienced Engineer/supervisor who offers a wide range of transferable

skills. Prioritises workload according to deadlines and utilizes excellent

communication skills with work colleagues at all levels. A flexible and

adaptable team member who undertakes his work with enthusiasm.

September 2015 to present date.

Doosan Babcock- Area Piping Supervisor.

TGE Ethane Project

Grangemouth, Scotland.

Installation of process pipe-work on new Ethane storage and

Process facility. Issuing isometrics and 3D model drawings to

Tradesmen, expediting pipe spools, materials and equipment,

Deliver toolbox talks to workforce, liase with management and

Client on progress and ensure safe working practices are used.

August 2013- June 2015

Petrofac-Piping Superintendent

Shetland Gas Plant

Shetland Isles.

Management and supervision of supervisors and tradesmen

on construction of new LNG Plant for Total. Preparation of work-packs

and permit to work allocation, Issuing of relevant P&I D's, Isometrics

and G A's to supervision and explaining scope of works.

Red Lining Isometric drawings for test packs prior to handover to Test Team.

Providing technical assistance with the field engineers, and promoting HSE

approved working practices to the workforce. Ensuring toolbox

talks and preparatory talks are undertaken, attending site

coordination meetings and daily progress meetings with senior

management. Manage sub-contractors and ensure that works

are installed to clients specifications, put in place relevant guidelines

for certification processes, and encourage a HSE inspired work ethos.

May 2013- August 2013

Interserve. Piping Supervisor

Runcorn TPS

Cheshire

Installation of 1st & 2nd pass pipework on economisers on new EFW

Thermal power station in the Wirral, also low and high pressure pipework

installation on evaporators, punch out of systems and testing to same.

Daily supervision of pipefitters and welders, toolbox talks, PTW acquisition,

Risk assessment and method statement review and pre work assessment checks.

Attendance at planning and progress meetings with company and client

representatives. Recording man hours (Timesheets).

July 2012- May 2013

Doosan-Babcock. Piping Supervisor

Inneos, Grangemouth, Scotland.

Supervision of piping and structural trades on new Tail Gas

Unit for existing S.R.Us on inneos refinery. Also shutdown

Works in same plant for process tie-ins. Preparing work permits,

And work packs, and allocating work to labour force. Submission of

Timesheets on a daily basis. Allocation of work to multi-trade labour

force on KG Flex- Ethylene project. Including, preparation of work

packs, field surveys, procurement of piping materials and requisition

of pre-fabricated spools, and issueing of permit to work documents.

Punch-out of piping systems prior to hand over to test team.

March 2012 - May 2012

Amec. Piping Supervisor, North Tees

Shutdown works to existing chemical plant,works included

Replacement of carbon steel &stainless steel pipework as

Per clients requirements. Hydrostatic testing to same pipework

And re-instatement after testing.

Nov 2011 Feb 2012-

Fabricom Oil & Gas.

Piping supervisor, SSI Redcar Blast Furnace Project.

Removal of old piping systems and replacement of same

To existing steel plant prior to re-commissioning of plant

And start up. Works included cooling pipework, Releif flare

Pipework, steam tracing pipework & Instrument and breathing

Air pipework. Punch-out of piping systems prior to hydro-testing,

re-instatement and hand over

Jan 2009 December 2009

Fabricom GDF SUEZ.

Piping supervisor Supervision of installations on new

Bio-fuels plant for Ensus at Wilton International site.

Work included overseeing fabrication of carbon &

Stainless steel pipework and erection and testing

To clients specifications.

October 2003 October 2008

Manager Riverside homes probation hostel.

Management of maintenance team, carrying out preventative

Maintenance to boiler houses, chiller units,and all heating and

Ventilation systems in Government Probation buildings.

November 2002 October 2003

Piping supervisor SPIROTEK B.V Groningen, NETHERLANDS.

Supervision of piping installations on new polypropylene plant. Work included

expedition of materials, fabrication and erection of carbon and stainless steel

pipe work. Punching out of pipework systems prior to re-instatement and

handover to Hydro test team.

April 2001 October 2002

Sub-contract Supervisor-Deutsche-Babcock.

Supervision of various work packages on re-vamp and new construction on

Flexi-Coker Refinery in Euro port Rotterdam. Works included overhaul of

existing Hydro treating plant and installation of new piping systems to new

plant.

April 1996 March 2001

Supervising Engineer. James Scott Major Projects.( AMEC)

Supervision of new cooling tower installations and associated piping systems at

GCHQ Cheltenham, also installation of new Pump House, Plant and Pipe work.

Supervision of new piping installations and associated plant to BNFL Saltwick,

Preston. Supervision of workforce on various contracts throughout the UK

including shutdown works and plant conversions to thermal power stations.

January 1990 February 1996

Piping/Mechanical Co-ordinator AMEC.

Co-ordination of piping and mechanical works packages on various contracts

throughout the U.K. Works included work at B.P Coryton, Lindsey Refinery,

B.P. Grangemouth and shut-down works on Wilton complex, Cleveland.

January 1988 December 1989

Piping Supervisor A.O.C.

Supervision of pipe work packages on new B.P. refinery at Whych Farm Dorset,

and FurzeyIsland Poole, Dorset.

January 1987- December 1987

Piping supervisor- Steels engineering.

Supervision of workforce installing carbon steel,stainless steel & kunifer

Pipework on Shell Eider production module prior to hydrostatic testing

And load out onto barge. Work included expediting System pipe spools,

Site modifications, site erection, test verification, & reinstatement.

April 1986-December 1986

Piping supervisor- U.K. Construction.

Installation of new pipework on Blast-Furnace rebuild at Redcar Steelworks.

Including cooling water, flare relief, & nitrogen pipelines. Flushing of

pipework

Prior to hydrostatic testing & re-instatement.

July 1985- April 1986

Piping Supervisor- Fluor B.V.

Supervision of piping installations on new Flexi-Coker Refinery in Rotterdam,

Netherlands. Overseeing works carried out by sub-contract labourforce,

From off-site fabrication to site erection,hydrostatic testing & reinstatement.

Materials used included: Chrome-Moly,Stainless Steel & Carbon Steel.

Qualifications

HNC Mechanical Engineering.

C&G Piping and Mechanical Services.

Site Safety passport held.

Bosiet-Offshore Certified.

ECB-compressed air breathing.

Interests

Cycling, walking and Golf.