GURPREET SINGH
House No. - RZE ***
Gali No.-*, Near Nihal bhavan
Nihal vihar(New Delhi)
E-mail: *******.****@*****.***
Contact No.: +91-705*******
To secure a challenging position in an organization, headed on
with technical responsibilities and where I can use my accorded
skills for the growth of organization.
Operating system : Windows 9x/2000/XP/8
Areas of interest : Breakers, Transformers, Panels, Testing
Of Switchgears, Protection of Power
System, Preventive and Breakdown
Maintenance,Control wiring and
Cabling
Software Specification : AUTOCAD, MATLAB, MS-OFFICE
B.Tech. (Electrical Engineering) (2008-2012)
College : Kautilya Institute of Technology and Engineering,
Jaipur
University : Rajasthan Technical University, Kota
Percentage : 68%
XII(2008)
School : Children’s Academy, Hanumangarh
Board : Rajasthan Board, Ajmer
Percentage : 60%
X(2006)
School : Government Senior Secondary School,
Hanumangarh
Board : Rajasthan Board, Ajmer
Percentage : 75%
Organization : Eurest Compass services; Client – Bharti Airtel
Site : World Mark-3
Description : Handling of all electrical distribution system through building, Handling of
HVAC, DG set & Fire fighting system, UPS, PAC units, WLD system
Organization : Brady Services Pvt. Ltd.(BSPL); Client- GMR
Site : Terminal-2(Hajj Terminal) and Cargo IGI Airport
Description : Operation and Maintenance of all 12 Substation under T-2 terminal(33/11
; 33/433 ; 11/440), PM and BM of all switchgears, Fault clearing, Testing
of all switchgears (Breakers, Transformers, Cables, Bus bars, Relays,
MFMs), Making of checklists for all PMs, keep 5s zone as per standards in
all substations, Installation of battery banks(110;24V) for essential supply
for panels, Handling of HVAC and Fire fighting system, UPS, Packaged and
Ductable AC units, WLD system
Organization : Ravi Sharma electricals; Client- Taneja Developers and Infrastructures
PVT Ltd.(TDI)
Project 1 : Tdi Mall, Kundali (Sonepat)
Description : Cable laying and terminations of LT PANELS throughout the mall, Earthing
(for all DG sets, Lt panel, MDB’s, Meter Boards panels, SDB’s, LDB’s, Poles),
complete cabling HVAC room for pumps and panels, Underground cable
laying through HDD(HDPE pipe)
Project 2 : Club Tivoli, TDI city (Sonepat)
Description : Laying of Hydrant and Make up lines for Fire Fighting System
Project 3 : Tdi School, Tdi City(Sonepat)
Description : Construction of pipe line & Main holes for STP, laying of pipe line and
Fixing of sprinklers for fire Fighting system, Wiring in flats(for staff 3BHK &
2BHK), Earthing for Poles, X-mers and DG sets
Organization : Suratgarh Super Thermal Power Station, Suratgarh(Raj.)[1500MW]
Training : Generation of Electricity using thermal energy
Duration : 30 Days
Description : Imparted with the knowledge of generation of electricity and machines
Organization : GSS(Grid Sub Station;11/.440KV) in Talwara Jheel
Training : Different kind of switchgears in GSS
Duration : 15 days
Description : Imparted with the knowledge about working of different kind of
switchgears in GSS
Seminar : Present and future aspects of Distributed Generation in India and Rajasthan
Description : Imparted with the knowledge about Decentralized Generation of Electrical
power in India and Rajasthan.
Member of NSUI from my college
Member of 1st prize winner team of Fashion Show organized in MNIT, Jaipur
Active participation in Blood Donation Camps organized in Our college camps
Co-ordinator of National Conference on Distribution Generation
1st prize in LAN gaming in Malviya National Institute of Technology, Jaipur
1st prize in Aid Making in Malviya National Institute of Technology, Jaipur
I hereby declare that all the details furnished above are true and correct to the best of my knowledge. If given a chance, I shall be willing to give dedication, reliability, enthusiasm in my work to the organization for the growth of it.
Gurpreet Singh
Date :
Place :