Post Job Free
Sign in

Ccca, Cdt, Aws Qc1/Cwi, Asnt Tc-1A Level Iii, And More

Location:
United States
Posted:
May 22, 2016

Contact this candidate

Resume:

Carl Hedberg 775-***-**** *********@*****.***

http://www.linkedin.com/pub/carl-hedberg-cdt-ccca-u-stamp-holder/a/a99/2a9/

Construction Testing & Engineers Sacramento, California

Combination Inspector/Resident Inspector September 2014 – December 2015

Provide visual observation/inspection a various fabrication facilities, job-sites, residential and commercial locations as needed to document the in-process and/or completed assemblies, mock-ups, ensuring the project is built within contract document specifications, owner requirements, and complying with local, state and federal building codes. Monitor or perform various destructive or non-destructive tests as requested.

NDE Technical Services Houston, Texas

Vendor Auditor August 2013 – September 2014

Perform vendor QA audits (materials, mill, welder, paint, hydro tests, NDT) in pump manufacturing facilities, structural steel fabrication shops, mining, petroleum and LNG skids to ensure the project is built within contract document specifications, owner requirements, and complying with local, state and federal building codes.

TUV-NORD Madrid, Spain

Vendor Surveillance/Auditor April 2013 – June 2013

Provide Level III Radiographic interpretation at the Crescent Dunes Solar Power Plant in Tonopah, Nevada. Procedure reviews, in-process observation, auditing of processed radiographic film to ensure conformance to client and applicable code requirements.

Tetra Tech Inc. Elko, Nevada

QA/QC Supervisor October 2011 – May 2012

Being the liaison between the Client and Tetra Techs’ management team, my responsibility as CM was to understand the time critical elements, ensure timely procurement and logistics around the active mining operations of the Banshee Ventilation Raise EOR at the Barrick Goldstrike Mine in Carlin, Nevada. The project, a new ventilation shaft 1250’ deep by 14’ diameter. Attending daily mine/Contractor coordination meetings, review engineering, mine, Contractor generated paperwork, RFI’s, change orders, monthly pay applications etc. Chaired Contractor pre-bid walk through(s), site meetings, plan for lay-down areas, timely review and return of submittals and responses to RFIs, tracked billable hours against scheduled activities for invoice review and authorization of payment, generating daily site observation reports, weekly and monthly progress reports and the monthly MSHS man-hour totals for all personnel contributing on timely delivery of this project.

McKay & Sposito Portland, OR

Construction Inspector August 2011 – October 2011

Provide on-site inspection (civil, mechanical, structural, and electrical) at the Dam Improvements and Fish Passage at Soda Springs, Oregon for McKay & Sposito’s client PacifiCorp Energy.

Baker Project Consulting LLC. Green River, Wyoming

Construction Manager/Inspector April 2010 – September 2010

The Lead On-Site Construction Inspector for the Residences and Bunkhouse Replacement Project, located at the Seedskadee National Wildlife Refuge (NWR). Represented the U.S. Fish and Wildlife Service (Service) in the field, provided daily progress reports to the Government assuring that the project is being constructed in accordance with the terms and conditions of this contract. I interfaced as I felt necessary, daily if needed with the COTR, CO, and Refuge Manager and his staff, and effectively communicated with all team members to discuss the project status and/or address potential problems or concerns as they arose.

REC Silicon Moses Lake, Washington

Owners Representative – Mechanical Inspector April 2008 – May 2009 Mechanical inspector for the 3.0 and 4.0 facility expansion. Responsibilities include monitoring the progress of all the various Subcontractors site wide. Monitoring could entail verification of the base material, pipe diameter, welding procedure, valve installation and valve tag identification through to the utilization of the correct testing medium when hydrostatic, pneumatic and blow down tests were being performed, Walking systems for preparation of turn-over packages, preparing punch lists on completed systems and monitor all start up and commissioning activities and the red lining of P&ID's at completion. Interfacing with the Construction Managers for coordinating daily production and testing requirements as well as tracking manpower on a daily basis. Walk site to insure all health and safety issues are being addressed.

KJM & Associates Inc. Bellevue, Washington

Project Manager June 2004 – August 2007

Hired by KJM & Associates to strengthen their Construction Management division on proposal submissions to existing clients and in developing new clients. Edited KJM's in-house safety program, edited their Project Controls Manual and drafted their Construction Management Manual. Subcontracted out to PB Buildings, Inc. as an infrastructure asset inspector for PB's Phase II Asset evaluations of Boeings nationwide properties performing both the Architectural and Structural portions of these audits. For Puget Sound Energy, wrote procedures/forms for PSE to use in-house so that all Contractors working on future PSE projects would utilize the same forms on every project.

City of Tukwila Tukwila, Washington

On-Site Representative July 2003 – March 2004

Responsibilities for the Interurban Avenue Bridge Widening and Pedestrian Trail Bridge Project included technical and administrative activities requiring experience in contract compliance and quality assurance. Observation and inspection of proper documentation of the work installed by the contractor, specifically of heavy civil construction, excavation and embankment, site utilities, bridge pier, girder, deck, sidewalk, barrier, signal, luminaire and interconnect systems and roadway construction. Ensured contractors compliance with Federal, State, City and County permits such as Federal Environmental Impact Permits, Washington State Environmental Impact Assessments, State Water Quality Permits and Hydraulic Permits due to working over the Green River.

Parsons Brinkerhoff Buildings, Inc Seattle, Washington

Infrastructure Asset Management Auditor May 2003 – July 2003

Performing condition assessments of real property assets at a commercial manufacturing facility. Performing both the Architectural and Structural portions of these audits. These audits review the existing conditions of the various components identified by Boeings' facilities and engineering personnel for review and compare them to their theoretical lifecycle as established by industry standards. Audits were from bridge over crossings to roofing. Renewal and replacement time periods and preliminary replacement cost estimates are identified by the auditing personnel for the individual components and then documented for review by Boeing personnel for future budget planning.

Phase 1 was completed on time and on budget. Phase 2 to follow.

Flad & Associates Seattle, Washington

Construction Administrator January 2001 - February 2003

Responsibilities for the 1.3 billion dollar Amgen "Helix" Project included P3 Coordinator, Cost Item Coordinator for the design teams CA's, Document Control Coordinator and Project Close Out Coordinator for the Executive Architect Team. Daily activities included attending bid opening, bid review, pre-construction and start up meetings, review and monitoring of RFI's, submittals and substitution requests, observe in-progress construction activities for contract and schedule compliance and weekly subcontractor meetings. Review contractors' monthly pay application. Coordinate design team and Owner walk throughs for developing punch lists and coordinate all subcontractors close outs for the Executive Architect.

Montgomery Watson Pasadena, California

Senior Resident Engineer August 1999 – January 2001

Responsibilities for the Wastewater Treatment Facilities Upgrade at the City of Banning included monitoring and observe all construction activities for compliance to plans and specifications. Review schedule status, evaluate and make recommendations regarding contractor-initiated value engineering proposals, review and approve contractors monthly pay request and fill out monthly status reports. Conduct weekly progress meetings and negations, receive and issue field correspondence and documentation. Communicate effectively while client interfacing and coordinate the inspection and testing services as required to assure positive outcomes with minimal disruption to daily operations and schedules. Prepare punch list at time of substantial completion and monitor progress of the punch list items. Coordinate the contractors' start up and testing activities, and manufacturers' basic training sessions, with City operations staff. Inspector at the HARRF Waste Water Treatment Plant, Leslie Lane Reservoir and pipeline project for the City of Escondido.

Professional Service Industries, Inc. Modesto, California

Project Manager May 1991 - August 1992

Responsible for scheduling, coordination, and supervision of all Welding Inspectors and NDT personnel statewide covering the Boeing Expansion Project located in Everett, Washington. Responsibilities included overseeing daily activities, supervise or perform the training and development of staff. I utilized systematic methods for continuous review, certification, inspection and testing of project components, including persons, systems, materials, documents, techniques and workmanship to determine whether or not such components conform to the plans, specifications and applicable standards. Maintenance of all inspection and test reports, material certifications, updating of contract drawings, and QC documents. Issuing RFI's, DCR's, NCR's and CN's as required. Telephone interfacing with jobsite construction and client personnel. Address safety questions and problems, conduct safety meetings on a weekly basis, conduct safety audits, record and report OSHA 200 forms. Level II UT, PT and MT certified.

Past and Present Registrations/Certifications

Construction Specifications Institute Certified Construction Contract Administrator, Construction Documents Technologist, City of Newport Beach Special Inspector, Spartan School of Aeronautics Industrial Testing & Inspection, City of Irvine Special Inspector, American Welding Society QC-1 Welding Inspector, I.C.B.O. Special Inspector, County of Los Angeles Deputy Building Inspector, City of Los Angeles Deputy Building Inspector, Clark County Building Department Approved, Caltrans, ADOT & WSDOT Approved, ICS Home Inspector, ASNT Level III Inspector in UT,RT,MT,PT, Safety Training by A.S.I., B.A.T.T. & LA RSO, Federal Aviation Administration Private Pilot, Red Cross CPR and First Aid Certified, Hydro Switching, Security Awareness.



Contact this candidate