Site Service Specialist, GE Power Services, India.

Technical Services of Generator Product.

Email: *****.*********@*****.***

Contact No.: +91-982*******

Objective:

To obtain a challenging position in a high quality engineering environment where my resourceful experience and academic skills will add value to organizational operations

Summary of Skills:

Prepare SoW(Scope Of Work)

Anticipation of site activities

Lead Technical Project Management

Implementation of ITP(Inspection & Testing Plan)

Report daily site progress

To prepare MS Project Schedule & complete assignment with schedule

Risk Assessment & EHS risk review

Prepare & Implement FSI(Field Service Instruction)

Ensure job as per drawing & procedure

Preparation of eFSR(Electronic Field Service Report)

Part list preparation for stator core, winding & Generator Assembly

To Ensure In-process deviation for NCR’s

Preparing techno-commercial offers

Presentation & Documents preparation for customer meets

Components design in AutoCAD 2008 & CATIA V5

Qualifying vendors/suppliers

Tool Design for Project Execution

Troubleshooting & technical support for sites & workshop

Technical inputs to sales & tendering team

Product cost optimization

Hands on for

Generator Major Overhauling: Air Cooled, H2 Cooled, H2X Cooled

Stator Restack

Stator Rewind

Electrical testing: IR-PI, HV, Winding Resistance as per OEM procedure

Fault findings

Removal of slot wedges

Removal of old winding

Slot marking as per the winding diagram

Refurbishment of phase connection rings

Replacement of end winding supports

Installation of phase connection rings

Cleaning & repair of stator core

Installation of bottom bars & top bars

Series & phase brazing by means of Induction/Resistance brazing machine

Slot wedging

Insulation of phase connections

Electrical testing & final painting

Rotor Rewind

Manage Emergency Outages/Breakdowns

Partial rewind

Earth fault rectification of component

Experience

GE Power Services (Earliar ALSTOM)

August 2011 - Present

Engineering & Technical Services for Generator Product (Air Cooled & H2X Cooled)

Senior Engineer at L & T MHI Turbine Generators Pvt. Lt

January 2010 - August 2011

Technology transfer & facilities development for stator core stacking of 660 & 800 MW super critical TG. On job training in Mitsubishi Electric Corporation, Kobe, Japan(4 Months)

Senior Engineer at ANDRITZ HYDRO

Dec 2008 – January 2010

Process & Engineering of Large Hydro & Turbo Generators

Work Shop Supervisor at Enercon EmbH

Dec 2006 – Dec 2008

Manufacturing of Wind Mill Generators (SYNCHRONOUS with Salient Pole Rotor)

Engineer at ABB Ltd.

Dec 2004 – January 2006

Manufacturing of squirrel cage HT motors & Wind Mill Generators 11kV, 6.6kV, 3.3kV, Responsible for shop floor planning & coordination winders team for below activities with

Certifications

Generator Stator core stacking

Mitsubishi Electric Corporation, Japan, August 2010

AutoCAD 2008

Autodesk June 2009

ALSTOM International EHS Passport

NEBOSH Europe March 2013

Fast rewinding of stator

ALSTOM, Belfort, France. June 2013

660 MW Power Plant Simulator

NTPC, Noida

Languages

English (Professional working proficiency)

Japanese (Elementary proficiency)

Education

JRN Rajasthan Vidyapeeth University

Bachelor of Technology (B.Tech.), Mechanical Engineering, 2007 – 2010 (Part Time)

The Maharaja Sayajirao University of Baroda

M.S. University, Mechanical Engineering, 2001 - 2004

Activities and Societies: NCC, Member of ISTE, Bodybuilding, Karate, CAD

Interests

Body building, Martial arts (brown belt in karate), Playing cricket, Playing volleyball, Biking, Swimming

PROFESSIONAL EXPERIENCE

Projects worked

Venture Energy Resources Ltd., BHOLA, Bangladesh, GTG-42.5 MW,T216-235

Duration : Jan 2012-Feb 2012

Role : Lead Winder

SoW : Stator core repair & rewinding, Rotor retaining ring insulation replacement

Numaligarh Refinery Ltd., Assam, GTG-34 MW,T204-240 (ALSTOM Belfort Make)

Duration: Feb 2012-March 2012

Role : Lead Engineer

SoW : Stator rewinding, Rotor retaining ring insulation replacement

Rayalaseema Thermal Power Plant, ANGENCO, STG-210 MW, THRI (BHEL Make)

Duration : Jun 2012

Role : Lead Engineer

SoW : Stator earth fault finding & replacement of top bar

TATA Power, Mumbai, STG-80 MW,TARI 93-38 (BHEL Make)

Duration : Jul 2012

Role : Lead Engineer

SoW : Generator dismantling & measurement for reverse engineering

NTPC, Rihand, Super Thermal Power Plant, STG-500 MW (ALSTOM UK Make)

Duration : Aug 2012

Role : Lead Engineer

SoW : Stator lifting & ‘O’-Ring replacement. Capital overhauling

LANCO, Anpara, STG-600 MW (China Dongfang Make)

Duration : Sep 2012

Role : Lead Engineer

SoW : Removal of retaining ring & armature winding earth fault finding

Re-installation of rotor retaining ring

NTPC, Kawas, GTG- 110 MW,T237-370 (ALSTOM Belfort Make)

Duration : Sep 2012

Role : Lead Engineer

SoW : Stator end winding NFT (natural frequency test) fault rectification

BPDB, Saidpur- Bangladesh GTG-20MW,T174-160 (ALSTOM Belfort Make)

Duration : Dec 2012

Role : Lead Engineer

SoW : Rotor retaining rings replacement, Introduction of ripple springs in stator

BPDB, Rangpur- Bangladesh GTG-20MW,T174-160 (ALSTOM Belfort Make)

Duration : Jan 2013

Role : Lead Engineer

SoW : Rotor retaining rings replacement, Introduction of ripple springs in stator

BPDB, Sylhet- Bangladesh GTG-20MW,T174-160 (ALSTOM Belfort Make)

Duration : Feb 2013

Role : Lead Engineer

SoW : Machining of rotor retaining ring, RR replacement with 18Cr18Mn material,

Stator rewinding

POWERTEK, TELOK GONG, Malaysia,GTG U#1-110 MW,T240-370 (ALSTOM Belfort)

Duration : Apr 2013

Role : Lead winder

SoW : Partial rewinding of Stator

NEEPCO, AGTP, Agartala,GTG U#2- 21 MW,T600 (ALSTOM Belfort Make)

Duration : Jun 2013

Role : Lead Engineer

SoW : Dry ice cleaning of stator winding, Stator slot wedge replacement,

Rotor retaining ring removal, insulation replacement & retaining re-installation.

TATA Trombay, U#7 STG, 80 MW,BHEL-TARI 93-38 (BHEL Make)

Duration : Aug 2013

Role : Lead Winder

SoW : Rewinding of STG stator

Successful Development of resistance brazing machine

IKPP,Serang, Indonesia, 70 MW, T230-268

Duration : Sep 2013

Role : Lead Winder

SoW : Stator rewinding

NLC (Neyveli Lignite Corporation), STG U#7, 210 MW (BHEL Make)

Duration : Nov 2013

Role : Lead Engineer

SoW : Stator winding earth fault finding & replacement of two nos. of top bars

BPDB, Baghabari, GTG#U1, 70MW, T 229-320 (ALSTOM Belfort Make)

Duration : Jan 2014

Role : Lead Engineer

SoW : Machining of Generator Rotor Retaining Rings on conventional type VTL

NTPC, Anta, GTG#U2, 88MW, WY18L-095LL (ALSTOM Baden Make)

Duration : Mar 2014

Role : Lead Engineer

SoW : Replacement Generator Stator Air Chamber Seal

Essar Power, Jamnagar, STG-600MW (Harbin Electric Co. Make)

Duration : Jun 2014

Role : Lead Engineer

SoW : Stator slot wedge tightness test

NTPC, Korba, BHEL 500 MW (BHEL Make)

Duration : July 2014

Role : Lead Engineer

SoW : Doppler flow measurement, CUPROPLEX-S & full cleaning of TG Stator

NTPC, Singrauli, 210 MW (BHEL Make)

Duration : Nov 2014

Role : Lead Engineer

SoW : Replacement of stator top bar, Water leakage arrest of bottom bar

Perlis, Tenaga Tecnologi,Malaysia STG 255 MW WY23Z-109 (ALSTOM Mannheim Make)

Duration : Nov 2014

Role : Lead Winder

SoW : Stator full rewind

NTPC, Anta GTG#U1, 88MW, WY18L-095LL (ALSTOM Baden Make)

Duration : Mar 2015

Role : Lead TFA

SoW : Replacement of Air Chamber Seal

NTPC,Anta STG, WX21L-100LL, STG-152MW (ALSTOM Baden Make)

Duration : Apr 2015

Role : Lead TFA

SoW : COH & Replacement of Air Chamber seal

Suez,Egypt,WT21E-134 STG-650 MW (ALSTOM China Make)

Duration : Jun 2015

Role : Lead Winder

SoW : Insulation of Terminal Connections

TAQA,Neyveli, WT21H-102 STG-250 MW (ALSTOM Mannheim Make)

Duration : Oct 2015

Role : TFA

SoW : Major Overhauling of TG

SAPP,Oman, GTG#22 180MW, WY21Z-095 (ALSTOM Baden Make)

Duration : Oct 2015

Role : Lead TFA

SoW : B-Inspection (Medium)

RPP(Saudi Elec Co.), GTG#7 78 MW, 60WY18L-059 (ALSTOM Baden Make)

Duration : Nov 2015 – Dec 2015

Role : Lead Winder

SoW : Generator Stator Fast Rewind GTG#21

NTPC,Vindhyachal,U#6 STG-210 MW (ELEKTROSILA Russia Make)

Duration : Jan 2016- Feb 2016

Role : Lead TFA

SoW : Replacement of Geno rotor & Exciter rotor slip rings

Place Date

Vadodara 01st Mar 2016



Contact this candidate