Curriculum Vitae
Aslam Mandaviya
Site Service Specialist, GE Power Services, India.
Technical Services of Generator Product.
Email: *****.*********@*****.***
Contact No.: +91-982*******
Objective:
To obtain a challenging position in a high quality engineering environment where my resourceful experience and academic skills will add value to organizational operations
Summary of Skills:
Prepare SoW(Scope Of Work)
Anticipation of site activities
Lead Technical Project Management
Implementation of ITP(Inspection & Testing Plan)
Report daily site progress
To prepare MS Project Schedule & complete assignment with schedule
Risk Assessment & EHS risk review
Prepare & Implement FSI(Field Service Instruction)
Ensure job as per drawing & procedure
Preparation of eFSR(Electronic Field Service Report)
Part list preparation for stator core, winding & Generator Assembly
To Ensure In-process deviation for NCR’s
Preparing techno-commercial offers
Presentation & Documents preparation for customer meets
Components design in AutoCAD 2008 & CATIA V5
Qualifying vendors/suppliers
Tool Design for Project Execution
Troubleshooting & technical support for sites & workshop
Technical inputs to sales & tendering team
Product cost optimization
Hands on for
Generator Major Overhauling: Air Cooled, H2 Cooled, H2X Cooled
Stator Restack
Stator Rewind
Electrical testing: IR-PI, HV, Winding Resistance as per OEM procedure
Fault findings
Removal of slot wedges
Removal of old winding
Slot marking as per the winding diagram
Refurbishment of phase connection rings
Replacement of end winding supports
Installation of phase connection rings
Cleaning & repair of stator core
Installation of bottom bars & top bars
Series & phase brazing by means of Induction/Resistance brazing machine
Slot wedging
Insulation of phase connections
Electrical testing & final painting
Rotor Rewind
Manage Emergency Outages/Breakdowns
Partial rewind
Earth fault rectification of component
Experience
GE Power Services (Earliar ALSTOM)
August 2011 - Present
Engineering & Technical Services for Generator Product (Air Cooled & H2X Cooled)
Senior Engineer at L & T MHI Turbine Generators Pvt. Lt
January 2010 - August 2011
Technology transfer & facilities development for stator core stacking of 660 & 800 MW super critical TG. On job training in Mitsubishi Electric Corporation, Kobe, Japan(4 Months)
Senior Engineer at ANDRITZ HYDRO
Dec 2008 – January 2010
Process & Engineering of Large Hydro & Turbo Generators
Work Shop Supervisor at Enercon EmbH
Dec 2006 – Dec 2008
Manufacturing of Wind Mill Generators (SYNCHRONOUS with Salient Pole Rotor)
Engineer at ABB Ltd.
Dec 2004 – January 2006
Manufacturing of squirrel cage HT motors & Wind Mill Generators 11kV, 6.6kV, 3.3kV, Responsible for shop floor planning & coordination winders team for below activities with
Certifications
Generator Stator core stacking
Mitsubishi Electric Corporation, Japan, August 2010
AutoCAD 2008
Autodesk June 2009
ALSTOM International EHS Passport
NEBOSH Europe March 2013
Fast rewinding of stator
ALSTOM, Belfort, France. June 2013
660 MW Power Plant Simulator
NTPC, Noida
Languages
English (Professional working proficiency)
Japanese (Elementary proficiency)
Education
JRN Rajasthan Vidyapeeth University
Bachelor of Technology (B.Tech.), Mechanical Engineering, 2007 – 2010 (Part Time)
The Maharaja Sayajirao University of Baroda
M.S. University, Mechanical Engineering, 2001 - 2004
Activities and Societies: NCC, Member of ISTE, Bodybuilding, Karate, CAD
Interests
Body building, Martial arts (brown belt in karate), Playing cricket, Playing volleyball, Biking, Swimming
PROFESSIONAL EXPERIENCE
Projects worked
Venture Energy Resources Ltd., BHOLA, Bangladesh, GTG-42.5 MW,T216-235
Duration : Jan 2012-Feb 2012
Role : Lead Winder
SoW : Stator core repair & rewinding, Rotor retaining ring insulation replacement
Numaligarh Refinery Ltd., Assam, GTG-34 MW,T204-240 (ALSTOM Belfort Make)
Duration: Feb 2012-March 2012
Role : Lead Engineer
SoW : Stator rewinding, Rotor retaining ring insulation replacement
Rayalaseema Thermal Power Plant, ANGENCO, STG-210 MW, THRI (BHEL Make)
Duration : Jun 2012
Role : Lead Engineer
SoW : Stator earth fault finding & replacement of top bar
TATA Power, Mumbai, STG-80 MW,TARI 93-38 (BHEL Make)
Duration : Jul 2012
Role : Lead Engineer
SoW : Generator dismantling & measurement for reverse engineering
NTPC, Rihand, Super Thermal Power Plant, STG-500 MW (ALSTOM UK Make)
Duration : Aug 2012
Role : Lead Engineer
SoW : Stator lifting & ‘O’-Ring replacement. Capital overhauling
LANCO, Anpara, STG-600 MW (China Dongfang Make)
Duration : Sep 2012
Role : Lead Engineer
SoW : Removal of retaining ring & armature winding earth fault finding
Re-installation of rotor retaining ring
NTPC, Kawas, GTG- 110 MW,T237-370 (ALSTOM Belfort Make)
Duration : Sep 2012
Role : Lead Engineer
SoW : Stator end winding NFT (natural frequency test) fault rectification
BPDB, Saidpur- Bangladesh GTG-20MW,T174-160 (ALSTOM Belfort Make)
Duration : Dec 2012
Role : Lead Engineer
SoW : Rotor retaining rings replacement, Introduction of ripple springs in stator
BPDB, Rangpur- Bangladesh GTG-20MW,T174-160 (ALSTOM Belfort Make)
Duration : Jan 2013
Role : Lead Engineer
SoW : Rotor retaining rings replacement, Introduction of ripple springs in stator
BPDB, Sylhet- Bangladesh GTG-20MW,T174-160 (ALSTOM Belfort Make)
Duration : Feb 2013
Role : Lead Engineer
SoW : Machining of rotor retaining ring, RR replacement with 18Cr18Mn material,
Stator rewinding
POWERTEK, TELOK GONG, Malaysia,GTG U#1-110 MW,T240-370 (ALSTOM Belfort)
Duration : Apr 2013
Role : Lead winder
SoW : Partial rewinding of Stator
NEEPCO, AGTP, Agartala,GTG U#2- 21 MW,T600 (ALSTOM Belfort Make)
Duration : Jun 2013
Role : Lead Engineer
SoW : Dry ice cleaning of stator winding, Stator slot wedge replacement,
Rotor retaining ring removal, insulation replacement & retaining re-installation.
TATA Trombay, U#7 STG, 80 MW,BHEL-TARI 93-38 (BHEL Make)
Duration : Aug 2013
Role : Lead Winder
SoW : Rewinding of STG stator
Successful Development of resistance brazing machine
IKPP,Serang, Indonesia, 70 MW, T230-268
Duration : Sep 2013
Role : Lead Winder
SoW : Stator rewinding
NLC (Neyveli Lignite Corporation), STG U#7, 210 MW (BHEL Make)
Duration : Nov 2013
Role : Lead Engineer
SoW : Stator winding earth fault finding & replacement of two nos. of top bars
BPDB, Baghabari, GTG#U1, 70MW, T 229-320 (ALSTOM Belfort Make)
Duration : Jan 2014
Role : Lead Engineer
SoW : Machining of Generator Rotor Retaining Rings on conventional type VTL
NTPC, Anta, GTG#U2, 88MW, WY18L-095LL (ALSTOM Baden Make)
Duration : Mar 2014
Role : Lead Engineer
SoW : Replacement Generator Stator Air Chamber Seal
Essar Power, Jamnagar, STG-600MW (Harbin Electric Co. Make)
Duration : Jun 2014
Role : Lead Engineer
SoW : Stator slot wedge tightness test
NTPC, Korba, BHEL 500 MW (BHEL Make)
Duration : July 2014
Role : Lead Engineer
SoW : Doppler flow measurement, CUPROPLEX-S & full cleaning of TG Stator
NTPC, Singrauli, 210 MW (BHEL Make)
Duration : Nov 2014
Role : Lead Engineer
SoW : Replacement of stator top bar, Water leakage arrest of bottom bar
Perlis, Tenaga Tecnologi,Malaysia STG 255 MW WY23Z-109 (ALSTOM Mannheim Make)
Duration : Nov 2014
Role : Lead Winder
SoW : Stator full rewind
NTPC, Anta GTG#U1, 88MW, WY18L-095LL (ALSTOM Baden Make)
Duration : Mar 2015
Role : Lead TFA
SoW : Replacement of Air Chamber Seal
NTPC,Anta STG, WX21L-100LL, STG-152MW (ALSTOM Baden Make)
Duration : Apr 2015
Role : Lead TFA
SoW : COH & Replacement of Air Chamber seal
Suez,Egypt,WT21E-134 STG-650 MW (ALSTOM China Make)
Duration : Jun 2015
Role : Lead Winder
SoW : Insulation of Terminal Connections
TAQA,Neyveli, WT21H-102 STG-250 MW (ALSTOM Mannheim Make)
Duration : Oct 2015
Role : TFA
SoW : Major Overhauling of TG
SAPP,Oman, GTG#22 180MW, WY21Z-095 (ALSTOM Baden Make)
Duration : Oct 2015
Role : Lead TFA
SoW : B-Inspection (Medium)
RPP(Saudi Elec Co.), GTG#7 78 MW, 60WY18L-059 (ALSTOM Baden Make)
Duration : Nov 2015 – Dec 2015
Role : Lead Winder
SoW : Generator Stator Fast Rewind GTG#21
NTPC,Vindhyachal,U#6 STG-210 MW (ELEKTROSILA Russia Make)
Duration : Jan 2016- Feb 2016
Role : Lead TFA
SoW : Replacement of Geno rotor & Exciter rotor slip rings
Place Date
Vadodara 01st Mar 2016