CAREER OBJECTIVE
Major interest is to obtain a job in an environment that provides career advancement and growth, leadership training and opportunities wherein my talents and skills, in my chosen field, shall be developed to the fullest.
PERSONAL BACKGROUND
Age : 32
Weight : 69 kg.
Height : 5’4”
Date of Birth : June 7, 1983
Place of Birth : Calaca, Batangas
Name of Father : Francisco M. Pilac
Name of Mother : Felicisima D. Bancoro
Civil Status : Single
Sex : Male
Nationality : Filipino
Religion : Roman Catholic
Passport No. : XX2070330
TIN No. : 303-***-***-***
SSS No. : 041*******
Philhealth No. : 090*-****-****
EDUCATIONAL BACKGROUND
Tertiary : University of Batangas
Bachelor of Science in Civil Engineering
Hilltop, Batangas City
2001-2006
Secondary : Calaca Academy High School
Calaca, Batangas
1997-2000
Elementary : Puting Bato Elementary School
Puting Bato West, Calaca, Batangas
1991-1996
Page 2 of 8
WORKING EXPERIENCE
Juben Construction
Brgy. Puting Bato West, Calaca, Batangas
December 7, 2015 up to May 5, 2016
- Field / Site Engr. of Construction of Phoenix Chelsea Warehouse located at Puting Bato West, Calaca, Batangas
- Earthworks / clearing of A = (98mx52m)warehouse lot
- Supervising the whole construction of excavation of column footing foundation, concreting, and masonry. Including reinforcements, steel bars, plumbing and road concreting, electrical installation in the whole building and in the fencing of electrical lights.
- Supervised materials used in / used out in warehouse project, roofing of warehouse and steel plates I-Bar of column and steel plate trusses.
Southern Luzon Thermal Energy Corporation (SLTEC) Brgy. Puting Bato West, Calaca, Batangas
D.M. Consunji, Inc. DMCI
1x135 MW CFB POWER PLANT PROJECT PHASE 1
Granby Trading and Construction Company
May 7, 2012 up to September 01, 2013
Perform the following activities as:
- Civil field Engr. / site-in-charge
- Supervising of clearing of the whole Plant area and all the equipment used.
- Equipment coordinator
- Assigned in actual transporting and hauling of more than 10,000 loads of backfilling materials from quarry to SLTEC plant site.
- Handling of all human resources that were used for the operation of clearing and backfilling or Earthworks Jobs inside and outside the plant.
- Site Actual Calculating of Rebars Cutting List and Rebars Billing for: Boiler Foundation Rebars
Deaerator and Bunker Bay Foundation Rebars
Chimney Foundation Rebars
ESP Foundation Rebars
Turbine @ Column A Foundation Rebars
TG Foundation Rebars and some other rebars
- Acting as Site Supervisor, Safety officer, Foreman Steelman, Timekeeper, Billing Document controller, Accounting Personnel Page 3 of 8
Consolidated Contracting Engineering and Procurement Company S.A.L. Offshore (CCEP)
Hookup, Pre-Commissioning, Commissioning Assistance Project Atyrau, Kazakhstan
Sept. 23, 2011 – January 26, 2012
Instrument Technician
Balayan Distillery Incorporation
Brgy. Talisay, Calaca, Batangas
January 26, 2011 to July 10, 2011
Powerhouse Operation
Steam Turbine generator
HP= 2043kw, RPM= 5200
Assistant Operator
- Monitoring and reading at the Powerhouse Control room of running line current, Kwh, MW, PF, Volts, Hertz, running hour and RPM.
- Start-up and Shutdown of Turbine Generator.
- Synchronizing by transferring the main source power supply to turbine generator.
- Energizing the Detroit Diesel generator and Caterpillar generator in case of Batelec Power Failure.
- Monitor and Reading of Steam Turbine Generator Gauges such as the following: Steam pressure inlet and exhaust gauge, steam temperature inlet and exhaust gauge, Water supply pressure gauge, inlet and outlet temperature, Bearing inlet and exhaust temperature, reducer front bearing temperature of pinion and gear, reducer behind bearing temperature of pinion and gear, Lube oil system inlet and outlet temperature and pressure, generator cooling system inlet and outlet gauge temperature, Gland condenser pressure gauge, Air ejector pressure gauge, Governor load limit, Pressure relief valve process value and set point.
INSTRUMENT TECHNICIAN
QATAR GAS 3 & 4 PROJECT
CHIYODA-TECHNIP JOINT VENTURE
CCIC QCS PROJECT
RAS LAFFAN INDUSTRIAL CITY, QATAR
JANUARY 14, 2009 to JUNE 13, 2010
Console Operator (BOARDMAN) of Major Instrument Control Systems:
- DCS (EMERSON)
- IPS/HIPPS ( INVENSYS/TRICONEX)
- FGS (INVENSYS/TRICONEX)
- MARKVI (GENP)
Page 4 of 8
- CCC (CCC)
- BMS, Governor Control and other package control Triconex system
(INVENSYS/TRICONEX)
- Machine Monitoring System ( BENTLY NEVADA 3500 MS System 1 )
- ADAS
- RDAS ( Rotating Data Acquisition System )
- Other PLC System
Equipment Handling and Usage of the following
- 375 HART Communicator
- Fluke 1577 Insulation Resistance Tester (Megger Test)
- Fluke 87V Multi-meter
- Resistance Box 1051 (ohms) Simulator ( decade box )
- Druck Pressure Calibrator
- PC 6 high pressure calibrator
- TK 3 vibration simulator
- Loop Calibrator 4-20 mA
- TIM Tester
- Function Generator
- Gas Calibrator
- Test lamp
Loop checking of instruments such as:
- Pressure Transmitters
- Temperature Transmitters
- Level Transmitters
- Flow Transmitters
- Transducer Type Pressure Transmitters
- Vibration Transmitters
- Proximitor
- Velocitor
- Accelerometer
- Key phasor
- Tachometer
- Solenoid Valve
-
Loop Checking of Fire & Gas System
- Acoustic Gas Detector
- Flame Detector
- Toxic Gas Detector
- Combustible Gas Detector
- Smoke Detector
- Manual Alarm Call Point
Page 5 of 8
- Hand switch
- Beacon
- Buzzer
- Annunciator
-
Troubleshooting and Repair of all Control Loop abnormalities during Loop Checking, Pre Commissioning and Start up Commissioning.
JASMIG CONSTRUCTION SUPPLY
Kumintang Ibaba, Batangas City
FIELD ENGINEER
January 23, 2008 to June 7, 2008
- Planning of Three-Storey Commercial Building
- Operation and handling of Engineering transit –Surveying
- Project Engineering of Concreting of Roadways
- Basic AutoCAD knowledge
EEI CORPORATION
Santa Maria, Bauan Batangas
Instrument Technician
July 2006 to January 2008
Console Engineer Operator of Flow DCS Consoles, Marshalling Cabinets, ESD Panels, Fire and Gas Panels, Relay Panels, PLC Panels, Motor Pumps, MCC’s and Associated Interlocks, Loop Check
Calibrating
- Control Valves
- Level Transmitters
- Flow Transmitters
- Pressure Transmitters
- Temperature Transmitters
- Level Switches
- Pressure Switches
- Temperature Switches
Pre-Commissioning of all Loop such as
- Open Loops
- Close Loops
- Complex Loops
- Pneumatic and ESD Loops
Interlock
- ESD Interlocks
- Deluge System Interlocks
Page 6 of 8
- Fire and Gas Interlocks
- Motor Control Interlocks
- Transformer Interlocks
- Process Control Interlocks
Troubleshooting and Repair of all Control Loop abnormalities during Loop Checking, Pre- Commissioning and Start up Commissioning
TRAININGS
In-House Training, Qatar
Consolidated Contractors Int`l Company
QCS CCIC HSE Training Department
CTJV - QCS Project
- Pre – Mechanical Completion ( PMC )
- Fire Warden
- Hand Drills & Power Tools
- Work at Confined Space
- Work – At – Height
- H1 N1 (Swine Flu ) Awareness Program
- Heat Stress Awareness
- Electrical Log Out / Tag Out ( LOTO )
- Road Safety
- Escape Mask Training
- Hydrogen Sulfide Breathing Apparatus
- Familiarization Course
INSTRUMENT TECHNICIAN, Philippines
Concept Institute for Career Enhancement Inc.
Balagtas, Batangas City
Tel. # (043-***-****
E-mail Add: *****@*******.***.**
Perform the following activities as Instrument Technician
- Industrial Plant Safety Organization
- Wire Continuity and Resistance Test Using Fluke 87V Multi-meter
- Cable Insulation Resistance Test Using Fluke 1577 Insulation Tester
- Actual Wiring of Manual Call Point Loops and Instrument
- Wiring and Loop Checking of F&G Deluge System Satisfying 2003 Voting Page 7 of 8
Calibration of the following
- Pressure Switch High
- Float Type Level Switch
- Float Type Level Switch (Endress + Hauser)
- Pressure Transmitter
- Temperature Transmitter
- Pop Up Test of PRV
- Valtek Control Valve (Shutdown Valve)
Loop Checking of the following
- Temperature Transmitter (Rosemount Model 3044C)
- Pressure Transmitter (Rosemount Model 1511)
- Pork Type Level Switches (Endress + Hauser)
- Pressure Switch High
- Float Type Level Switch
- Close Loop (Valtek On-Off Valve LSH, LSL)
- Functional Test of Electric Motor from DCS/PLC
Equipment Handling and usage of the following
- 375 HART Communicator
- Fluke 1577 Insulation Resistance Tester (Megger Test)
- Test Pump
- Resistance (Ohms) Simulator
City Engineering Office
P. Herrera St. Batangas City
April 24, 2006 to July 25, 2006
FIELD ENGINEER
- Computer Literacy
- Computer Knowledge in MS Office Application
Yeskertkish Kyzmet Kazakhstan LLP
Basic Offshore Safety Induction and
Emergency Training (BOSIET)
Sept. 30, 2011 to Sept. 29, 2015
Page 8 of 8
SEMINARS ATTENDED
Theory and Practice of Pre-stressed Concrete
Hilltop, Batangas City
October 10, 2003
Third Annual Leadership Training and Seminar
Santos Resort, Lemery, Batangas
December 12 – 13, 2003
CHARACTER REFERENCE
Juliana Delos Reyes
Owner – Juben Construction
Puting Bato West, Calaca, Batangas
Arlie Joseph A. Patricio
DMCI – I&C Manager, 1x135MW CFB Power Plant Project Puting Bato East, Calaca, Batangas