Post Job Free
Sign in

Power Plant Engineer

Location:
Batangas, CALABARZON, 4200, Philippines
Salary:
20,000-25,000
Posted:
May 15, 2016

Contact this candidate

Resume:

Page * of *

CAREER OBJECTIVE

Major interest is to obtain a job in an environment that provides career advancement and growth, leadership training and opportunities wherein my talents and skills, in my chosen field, shall be developed to the fullest.

PERSONAL BACKGROUND

Age : 32

Weight : 69 kg.

Height : 5’4”

Date of Birth : June 7, 1983

Place of Birth : Calaca, Batangas

Name of Father : Francisco M. Pilac

Name of Mother : Felicisima D. Bancoro

Civil Status : Single

Sex : Male

Nationality : Filipino

Religion : Roman Catholic

Passport No. : XX2070330

TIN No. : 303-***-***-***

SSS No. : 041*******

Philhealth No. : 090*-****-****

EDUCATIONAL BACKGROUND

Tertiary : University of Batangas

Bachelor of Science in Civil Engineering

Hilltop, Batangas City

2001-2006

Secondary : Calaca Academy High School

Calaca, Batangas

1997-2000

Elementary : Puting Bato Elementary School

Puting Bato West, Calaca, Batangas

1991-1996

Page 2 of 8

WORKING EXPERIENCE

Juben Construction

Brgy. Puting Bato West, Calaca, Batangas

December 7, 2015 up to May 5, 2016

- Field / Site Engr. of Construction of Phoenix Chelsea Warehouse located at Puting Bato West, Calaca, Batangas

- Earthworks / clearing of A = (98mx52m)warehouse lot

- Supervising the whole construction of excavation of column footing foundation, concreting, and masonry. Including reinforcements, steel bars, plumbing and road concreting, electrical installation in the whole building and in the fencing of electrical lights.

- Supervised materials used in / used out in warehouse project, roofing of warehouse and steel plates I-Bar of column and steel plate trusses.

Southern Luzon Thermal Energy Corporation (SLTEC) Brgy. Puting Bato West, Calaca, Batangas

D.M. Consunji, Inc. DMCI

1x135 MW CFB POWER PLANT PROJECT PHASE 1

Granby Trading and Construction Company

May 7, 2012 up to September 01, 2013

Perform the following activities as:

- Civil field Engr. / site-in-charge

- Supervising of clearing of the whole Plant area and all the equipment used.

- Equipment coordinator

- Assigned in actual transporting and hauling of more than 10,000 loads of backfilling materials from quarry to SLTEC plant site.

- Handling of all human resources that were used for the operation of clearing and backfilling or Earthworks Jobs inside and outside the plant.

- Site Actual Calculating of Rebars Cutting List and Rebars Billing for: Boiler Foundation Rebars

Deaerator and Bunker Bay Foundation Rebars

Chimney Foundation Rebars

ESP Foundation Rebars

Turbine @ Column A Foundation Rebars

TG Foundation Rebars and some other rebars

- Acting as Site Supervisor, Safety officer, Foreman Steelman, Timekeeper, Billing Document controller, Accounting Personnel Page 3 of 8

Consolidated Contracting Engineering and Procurement Company S.A.L. Offshore (CCEP)

Hookup, Pre-Commissioning, Commissioning Assistance Project Atyrau, Kazakhstan

Sept. 23, 2011 – January 26, 2012

Instrument Technician

Balayan Distillery Incorporation

Brgy. Talisay, Calaca, Batangas

January 26, 2011 to July 10, 2011

Powerhouse Operation

Steam Turbine generator

HP= 2043kw, RPM= 5200

Assistant Operator

- Monitoring and reading at the Powerhouse Control room of running line current, Kwh, MW, PF, Volts, Hertz, running hour and RPM.

- Start-up and Shutdown of Turbine Generator.

- Synchronizing by transferring the main source power supply to turbine generator.

- Energizing the Detroit Diesel generator and Caterpillar generator in case of Batelec Power Failure.

- Monitor and Reading of Steam Turbine Generator Gauges such as the following: Steam pressure inlet and exhaust gauge, steam temperature inlet and exhaust gauge, Water supply pressure gauge, inlet and outlet temperature, Bearing inlet and exhaust temperature, reducer front bearing temperature of pinion and gear, reducer behind bearing temperature of pinion and gear, Lube oil system inlet and outlet temperature and pressure, generator cooling system inlet and outlet gauge temperature, Gland condenser pressure gauge, Air ejector pressure gauge, Governor load limit, Pressure relief valve process value and set point.

INSTRUMENT TECHNICIAN

QATAR GAS 3 & 4 PROJECT

CHIYODA-TECHNIP JOINT VENTURE

CCIC QCS PROJECT

RAS LAFFAN INDUSTRIAL CITY, QATAR

JANUARY 14, 2009 to JUNE 13, 2010

Console Operator (BOARDMAN) of Major Instrument Control Systems:

- DCS (EMERSON)

- IPS/HIPPS ( INVENSYS/TRICONEX)

- FGS (INVENSYS/TRICONEX)

- MARKVI (GENP)

Page 4 of 8

- CCC (CCC)

- BMS, Governor Control and other package control Triconex system

(INVENSYS/TRICONEX)

- Machine Monitoring System ( BENTLY NEVADA 3500 MS System 1 )

- ADAS

- RDAS ( Rotating Data Acquisition System )

- Other PLC System

Equipment Handling and Usage of the following

- 375 HART Communicator

- Fluke 1577 Insulation Resistance Tester (Megger Test)

- Fluke 87V Multi-meter

- Resistance Box 1051 (ohms) Simulator ( decade box )

- Druck Pressure Calibrator

- PC 6 high pressure calibrator

- TK 3 vibration simulator

- Loop Calibrator 4-20 mA

- TIM Tester

- Function Generator

- Gas Calibrator

- Test lamp

Loop checking of instruments such as:

- Pressure Transmitters

- Temperature Transmitters

- Level Transmitters

- Flow Transmitters

- Transducer Type Pressure Transmitters

- Vibration Transmitters

- Proximitor

- Velocitor

- Accelerometer

- Key phasor

- Tachometer

- Solenoid Valve

-

Loop Checking of Fire & Gas System

- Acoustic Gas Detector

- Flame Detector

- Toxic Gas Detector

- Combustible Gas Detector

- Smoke Detector

- Manual Alarm Call Point

Page 5 of 8

- Hand switch

- Beacon

- Buzzer

- Annunciator

-

Troubleshooting and Repair of all Control Loop abnormalities during Loop Checking, Pre Commissioning and Start up Commissioning.

JASMIG CONSTRUCTION SUPPLY

Kumintang Ibaba, Batangas City

FIELD ENGINEER

January 23, 2008 to June 7, 2008

- Planning of Three-Storey Commercial Building

- Operation and handling of Engineering transit –Surveying

- Project Engineering of Concreting of Roadways

- Basic AutoCAD knowledge

EEI CORPORATION

Santa Maria, Bauan Batangas

Instrument Technician

July 2006 to January 2008

Console Engineer Operator of Flow DCS Consoles, Marshalling Cabinets, ESD Panels, Fire and Gas Panels, Relay Panels, PLC Panels, Motor Pumps, MCC’s and Associated Interlocks, Loop Check

Calibrating

- Control Valves

- Level Transmitters

- Flow Transmitters

- Pressure Transmitters

- Temperature Transmitters

- Level Switches

- Pressure Switches

- Temperature Switches

Pre-Commissioning of all Loop such as

- Open Loops

- Close Loops

- Complex Loops

- Pneumatic and ESD Loops

Interlock

- ESD Interlocks

- Deluge System Interlocks

Page 6 of 8

- Fire and Gas Interlocks

- Motor Control Interlocks

- Transformer Interlocks

- Process Control Interlocks

Troubleshooting and Repair of all Control Loop abnormalities during Loop Checking, Pre- Commissioning and Start up Commissioning

TRAININGS

In-House Training, Qatar

Consolidated Contractors Int`l Company

QCS CCIC HSE Training Department

CTJV - QCS Project

- Pre – Mechanical Completion ( PMC )

- Fire Warden

- Hand Drills & Power Tools

- Work at Confined Space

- Work – At – Height

- H1 N1 (Swine Flu ) Awareness Program

- Heat Stress Awareness

- Electrical Log Out / Tag Out ( LOTO )

- Road Safety

- Escape Mask Training

- Hydrogen Sulfide Breathing Apparatus

- Familiarization Course

INSTRUMENT TECHNICIAN, Philippines

Concept Institute for Career Enhancement Inc.

Balagtas, Batangas City

Tel. # (043-***-****

E-mail Add: *****@*******.***.**

Perform the following activities as Instrument Technician

- Industrial Plant Safety Organization

- Wire Continuity and Resistance Test Using Fluke 87V Multi-meter

- Cable Insulation Resistance Test Using Fluke 1577 Insulation Tester

- Actual Wiring of Manual Call Point Loops and Instrument

- Wiring and Loop Checking of F&G Deluge System Satisfying 2003 Voting Page 7 of 8

Calibration of the following

- Pressure Switch High

- Float Type Level Switch

- Float Type Level Switch (Endress + Hauser)

- Pressure Transmitter

- Temperature Transmitter

- Pop Up Test of PRV

- Valtek Control Valve (Shutdown Valve)

Loop Checking of the following

- Temperature Transmitter (Rosemount Model 3044C)

- Pressure Transmitter (Rosemount Model 1511)

- Pork Type Level Switches (Endress + Hauser)

- Pressure Switch High

- Float Type Level Switch

- Close Loop (Valtek On-Off Valve LSH, LSL)

- Functional Test of Electric Motor from DCS/PLC

Equipment Handling and usage of the following

- 375 HART Communicator

- Fluke 1577 Insulation Resistance Tester (Megger Test)

- Test Pump

- Resistance (Ohms) Simulator

City Engineering Office

P. Herrera St. Batangas City

April 24, 2006 to July 25, 2006

FIELD ENGINEER

- Computer Literacy

- Computer Knowledge in MS Office Application

Yeskertkish Kyzmet Kazakhstan LLP

Basic Offshore Safety Induction and

Emergency Training (BOSIET)

Sept. 30, 2011 to Sept. 29, 2015

Page 8 of 8

SEMINARS ATTENDED

Theory and Practice of Pre-stressed Concrete

Hilltop, Batangas City

October 10, 2003

Third Annual Leadership Training and Seminar

Santos Resort, Lemery, Batangas

December 12 – 13, 2003

CHARACTER REFERENCE

Juliana Delos Reyes

Owner – Juben Construction

Puting Bato West, Calaca, Batangas

+639*********

Arlie Joseph A. Patricio

DMCI – I&C Manager, 1x135MW CFB Power Plant Project Puting Bato East, Calaca, Batangas

+639*********

Emilyn D. Alcazar

Municipal Councilor

Calaca, Batangas

+639*********

I hereby certify that the above information is true and correct to the best of my knowledge and belief. ROBERT B. PILAC

Applicant



Contact this candidate