POSITION : QA/QC Mechanical
Name : Rodelio B. Merida
(+63) (0-906******* ( Philippines )
+966-********* ( Riyadh KSA )
E-Mail Address: *************@*****.***
EDUCATIONAL QUALIFICATION:
Course: Bachelor of Science in Mechanical Engineering
Date : June 1989 – March 1994
PROFESSIONAL QUALIFICATION:
Experience quality control with diverse background in auditing, quality management system implementation and maintenance. Training, corrective and preventive action, root cause analysis, management of change, statistical process control and vendor management. Knowledgeable with international standards, Oil & Gas / Petrochemical plant materials and equipment
SUMMARY…..
Work under general direction, applying my skills and expertise to generate solutions that require development or sustainment of new or improved techniques, procedures, products. Responsible
Assisting with planning, conducting, and evaluating approaches to meet project objectives in a timely, cost effective fashion. Self – motivated and work effectively in team or individual situations. Have excellent communication skills and can handle multiple projects and activities simultaneously.
PROFESSIONAL EXPERIENCE:
Position Name: Mechanical Engineer
Company Name: Project Build Co. LTD
Head Office – Dammam
Working Period: Oct.2,2015
Project Name: ALSULAIM TOWER / MOUWASAT HOSPITAL
Responsibilities:
HVAC
Perform difficult technical work supervising and scheduling the installation, maintenance and repair of
Ducting, pipe and air handling equipment in construction / tower and hospital facilities….
. Plan assign, inspect and supervise maintenance, repair and construction activities ;
Maintain records and files; prepare reports.
. Assign and distribute work orders and work request.
. Attend and participate in meetings regarding work to be done.
. Check and troubleshoot equipment ; set and adjust controls in the building.
. Review all work orders before and after completion.
. Order and pick up parts for jobs in order to keep mechanics on the job.
. Coordinate work with other shops as needed.
. Inspect contracted work as needed.
. Assist in budget planning and preparation.
. Inform project manager of completed and outstanding work orders.
. Cooperate with warehouse to determine which parts should be ordered for stock.
. Determine time and cost estimates HVAC jobs.
. Provide technical assistance to mechanics when requested.
. Perform related work as required.
PLUMBING……
Perform difficult technical work planning and supervising the maintenance, repair,
Modification and installation of plumbing fixture in tower and hospital facilities.
. Supervise the installation, repair and maintenance of water, plumbing and heating
Systems; maintain records and file ; prepare reports.
. Plan, schedule and assign the activities of plumbers.
. Supervise the installation and repair of hot and cold water, oil, steam or gas pipes and
Necessary connections.
Position Name: QA/QC Supervisor / Mechanical
Company Name: Nippon Express Co. Ltd. o
Working Period: February 2014 January 2015
Project Name: Malaysia Petronas Train 9 LNG, Project
Responsibilities:
Organize, implement, conduct and manage the QA/QC Programs as per the Company's Quality Policy.
Coordinate the document controls of technical submittals, drawings, etc. with the Project Team and to ensure that the QA/QC validation has been done, to ensure their issue, amendments and recall of controlled documents.
Coordinate all inspections; monitor the required tests and record inspections and tests in accordance with the Contract Plan and Contract Specifications.
Develop and submit detailed inspection and test procedure in a part of Method Statement for Owner and Contractor approval based on ITP provided by Contractor.
Perform inspection activities, as instructed in accordance with the requirements of the relevant inspection and test plan.
Monitor the works continuously to ensure the specified requirements of the project are being met.
Conduct inspection and testing as instructed ensuring that the methods and acceptance criteria are in accordance with approved procedures.
Prepare inspection report and verify results.
Liaise with the Client's representatives for the conduct of day-to-day quality related project activities.
Maintain good relationships with Main contractor, being relatively flexible, proactive but also strict when necessary to achieve the objectives of the project.
Position Name: QA/QC Supervisor / Mechanical
Company Name: TAIHHEI – DENGYO - KAISA
Working Period: November 2013 – January 2014
Project Name: Gas Turbine Combine Cycle Project
Responsibilities:
Conducts daily as well as weekly planning and monitoring of the pre-programmed PERT CPM activities as manpower subcontractor of ABB-HITACHI LTD. Under Taihei Dengyo supervision;
Periodical documentation and protocols of on-progress daily activities from packer plates installation setting of pedestal, until Turbine and the Generator mounting and its alignment;
Assisting in supervision of commissioning works, maintenance and addition works and punch lists.
Position Name: QA/QC Supervisor
Company Name: HITACHI
Working Period: June 2013 – September 2013
Project Name: Kephilco Thermal Plant Project (K1&K2) – Philippines
Responsibilities:
Perform inspection activities, as instructed in accordance with the requirements of the relevant inspection and test plan.
Monitor the works continues to ensure the specified requirements of the project are being met.
Conduct inspection and testing as instructed ensuring that the methods and acceptance criteria are in accordance with approved procedures.
Prepare inspection report and verify results.
Quality Assurance /structural steels/Electrodes for Manual Arc welding /High strength bolts / Mild steel bolts / flouring and stair treads / roof / wall sheet / Rain water down pipes and roof gutters.
Quality Manual and quality Plan / Procedures for fabrication, testing and inspection / Catalogs / welding submittal / Material Certificates / testing and inspection record / Manufacturers Data report.
Completion of QC site instructions and coordinate their closure and review of inspection test packages during the course of construction activities.
Compliance with the site’s health and safety regulations.
Attend weekly QC meetings.
Position Name: Mechanical Engineer
Company Name: USNS Bruce Heezen / USNS Mc Donell / USNS Summer / USNS Henson / USNS Bowditch
Working Period: September 2010 – December 2013
Project Name: Rehabilitation Project / Engine 1& 2 (U.S. Navy Ship) -
Responsibilities:
Review and check the manual drawing of the ship.
Periodical documentation’s and protocols of on-progress daily activities from packer plates installation, setting of pedestal, until G.E Motor and the generator mounting and its alignment;
Toxic test / tank cleaning / hazardous chemical / bilge water / cleaning etc.
Analyze, design, develop, and maintain products ; assist in commercialization.
Assist in identifying and organizing requirements . Apply usability procedures and principles at project or products -,line level or through customer input .
Build prototypes, product and system for testing ; set up and run laboratory simulations.
Design testing procedures and coordinate testing, conduct test, document results and develop client presentation.
Conduct and / or participate in technical reviews of requirements. Specifications, designs, codes, and other artifacts.
Evaluate engineering approaches and risk to produce and iterate development plans.
Train and support clients and ship representatives.
Identify and keep abreast of novel technical concepts and markets.
Author technical reports, papers, articles, presentations and patents.
Position Name: Piping Supervisor
Company Name: Daewoo / Missaid Qatar
Working Period: July 2007 – May 2008
Project Name: Qatar Chemical Plant Expansion Project 1&2
Responsibilities:
. Prepare all installation and selection documents for all mechanical equipments.
. Collaborate with team of designers to complete all mechanical capital projects and provide all
Engineering support.
. Prepare and design all construction bid documents.
. Provide support to all expense projects and maintain accuracy in all piping project and
Ensure compliance to all piping material specifications and maintain knowledge on all orders.
. Analyze all mechanical design and prepare various concepts for piping designs and develop
Required mechanical drawings.
. Provide support to all purchase activities and evaluate all vendor submittals.
. Inspect all mechanical equipment and analyze all equipment and ensure adherence to all
Present technology.
. Provide assistance to all senior engineers and recommend improvement to all design and
Travel to site to analyze all equipment and maintain efficient relation with all plant personnel.
. Assist to make arrangements for all business trips for various departmental tasks and design
All technical specifications and assist to procedure and fabricate all materials.
. Coordinate with various teams to administer all assignments.
. and design all piping specifications for clients and recommend appropriate alternatives.
. Interpret all codes and maintain over all performance of all piping activities.
. Provide support to all CADD functions and develop and maintain all activities according to
Project schedule and prepare appropriate forecasts.
. Develop new methods to recommend improvements to all activities of piping section.
Preparation of isometric drawings assembly and P&ID.
Supervise and control labor.
Supervises Fit-up work and alignment of service air pipe line sub-cooled Condensate, high pressure, and steam condensate pipe line system.
Supervises reinstatement work of various systems subject to custody transfer.
.
. Provide support to other trades / disciplines where required, or form part of an integrated
Multi – discipline team.
Position Name: Mechanical Supervisor
Company Name: Consolidated Contractor Company
Working Period: May 2006 – February 2007
Project Name: Kiln No.6 Clinker Cooler Expansion Project
Responsibilities:
Initiates study of approved plans prior to commencement of work
Programming of schedules of work in details from the master CPM from the start to the finish; Takes care in the procurement of construction materials in advance for the erection use as well as heavy equipment, tools, etc.
Supervise the assembly, installation and alignment of all sorts of equipment
Conducted and initiated group inspection on pier to pier conditions of Kiln for the clarification of the specified elevation datum and center lines prior to acceptance from civil work side to mechanical work sides of both owner and contractor parties
Plans and supervises activities of assigned personnel and performs supervisory functions at the unit level as established by management.
Reviews project instructions and blueprints to ascertain test specifications, procedures, objectives, test equipment, nature of technical problem, and possible solutions.
Position Name: QA/QC Supervisor Mechanical
Company Name: Bechtel
Working Period: June 2005 - March 2006
Project Name: Angola LNG Project
Responsibilities:
Initiates study of plan and the study of actual positions, measurements of the to be rehabilitated existing kiln
Supervising of work activities as per schedule and in assisting technicalities of its rehabilitation
Preparation works for documentation of as-built plans vs. newly installed as-built plan
Prepares daily manpower and progress report activities.
Develop and tests machinery and equipment, applying knowledge of mechanical engineering technology, under direction of engineering staff.
Reviews project instructions and blueprints to ascertain test specifications, procedures, objectives, test equipment, nature of technical problem, and possible solutions.
Set up and conduct tests of complete units and components under operational conditions to investigate design proposals for improving equipment performance, to obtain data for development, standardization, and quality control.
Analyze indicated and calculated test results in relation to design or rated specifications and test objectives, and modifies or adjusts equipment to meet specifications.
Record test procedures and results, numerical and graphical data, and recommend for changes in test method.
Establish and maintain the inspection and test plan for all stages of the construction work
Control non- conforming items during construction and ensure that corrective action work is carried out in accordance with the project specified requirement s.
Establish and maintain quality procedures where required to ensure the requirement of the quality manual are implemented in a controlled and systematic manner.
Implement the overall quality control of the construction works.
Position Name: Rigging Supervisor
Company Name: Mitsubishi Heavy Industries
Working Period: January 2000 – January 2005
Project Name: Banias Power Plant – SYRIA
Responsibilities:
Read,understand and implement all applicable company / project policies,working
Practices and procedure and drawing / sketches. Understand and develop lifting plans.
. Provide support to other trades, discipline where required, or form part of an integrated multi
Discipline team.
. Raise applicable permit ( PTW ) in order to complete work scope in a controlled and safe
Manner.
. Undertake appropriate risk assessments ( RA ) in order to complete work scope in a safe and
Controlled manner.
. Originate compliant of lifting plans in word format.
. Conduct surveys, studies 7 risk assessments.
. Manage rigging team, Supervise and control labor.
. Apply work programs for maximum productivity.
. Deliver a high quality, consistent and competent rigging / erection construction service in
Accordance with project, company requirements, standards and procedures.
. Support over all delivery of company goals and schedule.
. Ensure that all work scope is completed in a safe manner ensuring no detrimental impact to
Personnel, material or environment.
Provide technical guidance for reliability & maintenance data by accessing data history for accuracy and compliance with reliability best practices.
Establish and monitor programs for critical equipment analysis and condition monitoring.
Establish, in conjunction with Inspectors and maintenance engineers, maintenance programs for critical equipment.
Develop proactive RCM and FMECA analysis for critical equipment. Lead and facilitate failure investigation for critical equipment, generate reports, actions logs and follow-up in their closure.
Develops project objectives by reviewing project proposals and plans; conferring with management.
Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and elements; reviewing bids from contractors.
Determines project specifications by studying project design, requirements, and performance standards; completing technical studies; preparing cost estimates.
Involved in the preparation of testing and commissioning procedures, pre-commissioning and commissioning execution plan, reinstatement of test packages, tools and consumables, manpower loading and work execution plan.
Compile weekly and daily report. Monitor and report daily manning levels.
Position Name: Monitoring Inspector
Company Name: Jeong Poong Development Co., Ltd.
Working Period: January 1997 – July 1998
Project Name: Malaya K1&K2 Boiler Unit Rehabilitation Project - Philippines
Responsibilities:
Initiates in acquiring technical documents and drawings and study the technical reports for the rehabilitation scope
Conducts field inspection on the units for rehabilitation and reflects report to scope of work
Actual review of materials for the installation for correct use prior to installation;
Prepare and implement mechanical works, maintenance of equipment and spare parts.
Coordinate closely with counterpart in-house organization (production engineers and planners, design engineers, etc.)
Evaluate plant and equipment unscheduled downtime proportions.
Advised client on best practice in the repair and commissioning of rotating equipment.
Develop metrics for quality assessment and control.
Follow company procedure to protect all machineries, carry out maintenance, observe safety procedures and coordinate with plant engineer regarding machineries scheduled for overhauling and maintenance for manpower distribution.
Prepare various construction reports, schedules, documentation and interpret technical drawings.
Position Name: Cadet
Company Name: EEI Corporation
Working Period: June 1995 – November 1996
Project Name: Various Projects – Philippines
Responsibilities:
Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.
Monitor and follow-up on the proposed corrective actions and the stage of implementation thereof.
Assist the Construction Manager in the development and implementation of Quality Work Procedures and Instructions; documents revisions, issuance and retrieval, filing and storage, and updating documents register.
Coordinates in the scheduling of heavy equipment for use on particular activities as well as common and special tools
Responsible in the procurement of insulating materials and sheet metal cladding from warehouse to respective sites.
SKILLS:
Competency in Microsoft applications including Word, Excel and Outlook
Experience of maintenance mechanical control and planning
Report writing and presentation skills
Strong Troubleshooting Skills and technical aptitude
Strong Communication Skills
Strong familiarity in equipment and nameplate data list
Knowledgeable in detailed piping isometrics
Conversant with Industry Codes and Standards
Projects Handled:
Regenerating Kiln Number 1 and 2 Refractory Repairs and Relining
Central Azucarera de Tarlac, Philippines
oSupervise lay - Out and installation of stainless steel reinforcement
oSupervise fabrication and installation of shuttering
oSupervise concreting and finishing works
Vessels and Process Piping Insulation Works
Central Azucarera de Don Pedro, Batangas, Philippines
Annealing ovens A,B and C lining repair
Benguet Mining Corporation, Philippines
F – 2401 & H – 400 Refractory repair : Benguet Mining Corporation, Philippines
oSupervise lining repair of stock / chimney
oSupervise Pre-casting of burner recon tiles and heater repair
Galvanizing vat repair work: Philippine Steel Coating, Cabuyao, Laguna Philippines
oSupervise removal and replacement of changed brick lining
oSupervise concreting of floor and burner tiles
Various Vessels and Piping Insulation
SEMINARS AND TRAININGS ATTENDED
PETRONAS LNG TRAIN 9 PROJECT
JGC / NIPPON EXPRESS MAY,2014
TAIHHEI
GAS TURBINE COMBINE CYCLE PROJECT / NOVEMBER 2013
HITACHI
KEPHILCO THERMAL PLANT PROJECT ( K1 & K2 ) JUNE 2013
UNITED STATE OF NAVY SHIP / NUCLEAR AWARENESS
SEPTEMBER 2010
QATAR CHEMICAL PLANT EXPANSION PROJECT
JULY 2007
CONSOLIDATED CONTRACTOR COMPANY
KILN NO.6 CLINKER COOLER EXPANSION PROJECT / MAY 2006
LNG PROJECT ANGOLA
SONAMET / BECHTEL / JUNE 2005
MISUBISHI HEAVY INDUSTRIES
BANIAS POWER PLANT / JANUARY 2000
JEONG POONG
BOILER REHABILITATION PROJECT / JANUARY 1997
EEI CORPORATION
TOTAL QUALITY MANAGEMENT / JUNE 1995
PERSONAL DATA
BIRTHDAY APRIL 4, 1972
AGE 42
NATIONALITY FILIPINO
HEIGTH 5’4.96” ( 1.65 meters)
WEIGHT 65 kg
PASSPORT NUMBER EB6709202
ISSUED On 08 Nov, 2012
ISSUED At MANILA
VALID UNTIL 07 Nov, 2017
S.S.S. No. 33-1731779-7
T.I.N 178-330-436 BLOOD TYPE A
MATHEMATICAL SKILLS
Ability to add, subtract, multiply, and divide in all units of measure, using whole numbers, common fractions and decimals . Ability to compute rate . Ratio, percent, and quantities ( linear, volumetric, or weight ) and read interpolate applicable data and tables .
LANGUAGE SKILLS
Ability to read, and comprehend simple instruction, short correspondence, and memos . Ability to write simple correspondence . Ability to affectively present information in one – on – one and small group situations to other employees of organization . Ability to communicate written and verbally in English .
REASONING ABILITY
Ability to apply commonsense understanding to carry out detailed but uninvolved written or oral instructions . Ability to deal with problems involving a few concrete variable in standardized situations .