Post Job Free
Sign in

Engineer Project Manager

Location:
Seattle, WA
Posted:
May 11, 2016

Contact this candidate

Resume:

Adam N. Mesa

765-***-****

***** *** ***. *. *******, WA

www.linkedin.com/in/amesa/

acuqln@r.postjobfree.com

EDUCATION

Purdue University, West Lafayette, Indiana

B.S. in Mechanical Engineering Graduated: May 2014

WORK EXPERIENCE

Caterpillar Inc. (Product Engineer) Lafayette, IN March 2015 – April 2016

Research and analyze customer design proposals and specifications to determine time and cost feasibility

Perform verification and validation on engine components to ensure customer needs are met

Perform design changes to ease assembly/manufacturing and prevent the failure of engine components

NPI launch of a new pre-lube pump kit per customer need, design and development of system

Implement corrective and preventative actions for engine components, manufacturing and assembly process

Work with cross functional teams to perform FMEAs and design reviews for product development

Continuous improvement and issue resolution focused in product manufacturing and quality

Caterpillar Inc. (Project Manager) Lafayette, IN October 2015 – April 2016

Manage workflow to team of drafting engineers in Chennai, India for design changes and updates.

Project team lead of turbo coolant lines group and oil lines group continuous product improvement.

Plan and track ongoing project progress, design reviews, material acquisition, start-on-line dates etc.

Summarize and report project milestones to project stakeholders at monthly conference

Utilize lean six sigma principles to eliminate failures on turbo coolant lines.

Zimmer Biomet (Product Development Engineer) Warsaw, IN July 2014 - March 2015

Perform verification and validation on medical devices to ensure that design inputs and user needs are met

Review and assess design assurance documentation for product conformance to FDA quality regulations

Perform tolerance analyses to evaluate product models and prints

Initiate changes and examine existing changes to assess whether updates affect the DFMEA, PFMEA, fatigue, range of motion and/or mating of hip implants

Analyze clinical evaluation reports and complaint data of predicate devices to confirm product safety of similar devices by evaluating risks and potential failure modes

Subaru Inc. (Manufacturing Engineer Intern) West Lafayette, IN May 2013 - Aug 2013

Supervised teams of technicians to complete several electrical/mechanical installations

Held bid meetings with multiple vendors and selected qualified suppliers for jobs

Installed new light fixtures resulting in a 50% decrease in energy usage and $11,110 cost savings per year

Eastman Chemical Company (Plant Engineer Intern) Kingsport, TN May 2012 - Aug 2012

Estimated cost of holding tank for excess chemical product resulting in $56,750 cost savings

Designed, fabricated and installed screen on blend tank

Corrected Piping and Instrumentation Diagrams (P&IDs) for demineralized water headers

SKILLS

MATLAB, LabVIEW

AutoCAD, CATIA V5, Pro E, SolidWorks

Finite Element Analysis (ANSYS, Mechanica)

GD&T ASME Y14.5-2009

Engineering in Training (EIT) Certification

Proficient in Spanish

Lean Six Sigma Principles

Verification and validation



Contact this candidate