Post Job Free

Resume

Sign in

Mechanical/Piping Commissioning Engineer

Location:
Philippines
Posted:
May 06, 2016

Contact this candidate

Resume:

R E S U M E

Of

ROGELIO D. AMISTA

Home Address:

***, *** ******, ******** ***********

Butuan City, Mindanao, Philippines

Mobile Phone No.: +63-921*******

Home Phone No.: +63-977*******

E-mail Address:acunta@r.postjobfree.com

I. PERSONAL DATA:

Nationality: Filipino

Passport Number: EC5673018

Place of Birth: Guindulman, Bohol, Philippines

Birth Date: June 27, 1955

Civil Status: Married

Name of Spouse: Angelita B. Amista

Spouse Occupation: Govt. Employee (Social Worker)

No. of Children: One (1)

Name of Child: Angelie Amista Malolot

II. EDUCATIONAL BACKGROUND:

Elementary: Guindulman Central Elem. School

Date Attended: 1962 – 1968

Course: Elementary (Graduated with honor)

High School: St. Mary Academy

Date Attended: 1968 – 1972

Course: Secondary (Graduated with honor)

College Education: University of Bohol

Date Attended: 1972 – 1978

Course: Bachelor of Science in Mechanical Engineering (Graduated)

III. BOARD EXAMINATION TAKEN (PASSED):

MECHANICAL ENGINEER LICENSURE BOARD EXAMINATION

IV. TRAININGS/SEMINARS ATTENDED:

QUALITY CONTROL CIRCLE SEMINAR – PSC, CAGAYAN DE ORO CITY PHILIPPINES

PRODUCTIVITY IMPROVEMENT SEMINAR – DTI BUTUAN CITY, PHILIPPINES

SUPERVISORY/MANAGEMENT SEMINAR – NALCO, NASIPIT AGUSAN DEL NORTE, PHILIPPINES

V. JOB DESCRIPTION (Present to Previous Employment)

1. Company: DMCI POWER CORPORATION

Site Address: 135 MW, Calaca, Batangas, Philippines

Project: Commissioning of 135 MW Coal Fired Boiler Power Plant

Date: April 7, 2014 to April 8, 2015

Position: Asst. Manager for Commissioning

2. Company: SPIE-SATORP (Saudi Aramco Total Refining & Petrochemical Co.)

Site Address: Jubail, Kingdom of Saudi Arabia

Project: Pre-Commissioning/Commissioning and Assistance to Start up and Performance Test for

Jubail Export Refinery Project.

Date: December 28, 2011 to October 14, 2013

Position: Mechanical/Piping Commissioning Supervisor for Project Management Team

Duties and Responsibilities:

* Review and make comments for Pre-comm./Commissioning activities Procedures given

by EPC / Contractor

* Attend daily and weekly Pre-comm./ Commissioning meetings

* Witnessing and Inspection for Pre-comm./Commissioning activities such as Pipelines

cleaning (Line Pigging, Steam blowing, Air blowing/Blasting and water flushing), PVP

Drying Out, Air/Nitrogen leak test, Nitrogen purging/Inerting and mechanical/equipment

Operational Test.

* Subsystems Walkthrough for RFC, RFSU and RFISU and create punch lists.

* Signs ICAPS sheets during witnessing/inspection for Pre-comm./Comm. activities which

are acceptable.

3.Company: BLACK & VEATCH (THAILAND) LIMITED

Site Address: Marubeni Black & Veatch Consortium

Glow Phase-5 Power Plant Project

Rayong, Thailand

Project: Commissioning of Glow Phase-5 Combine Cycle Power Plant/Cogen Project

Date: March 22, 2011 to September 30, 2011

Position: Commissioning Mechanical Engineer

Duties and Responsibilities:

*Commissioning works on Gas/Steam Turbines, HRSG, ElectroChlorination Plant and all

other associated systems

* Assist and coordinate with the Vendor representatives in any equipment adjustment and

tuning up

* Assist start up and operation for the whole Plant

* Balance of Plant Operation (BOP)

4.Company: CEGELEC-TOTAL

Site Address:Total E&P Yemen, Kharir Site, Yemen

Projects: TEPY Shabwa, Block 10 Gas Export Line To PEC Temporary Power Plant

Project 5060, Basement Processing Unit Train & CCU Additional Boosting Facilities

Date: March 30, 2009 to February 28, 2011

Position: Mechanical/Piping Commissioning Lead (28/28 days rotation)

Duties and Responsibilities:

*Make/prepare Operational Test Procedure (OTP)

* Make/prepare Nitrogen Leak Test Packages with mark up P&ID

* Make/prepare detailed Nitrogen Leak Test Procedures

* Witness/Inspection Pre-commissioning and Commissioning activities

* Conduct Mechanical Running Test and OTP for all equipments

* Conduct Nitrogen Leak Test and Purging/Inerting for all System/Subsystem

* Assist Start up for the whole Plant

* ICAPS and OPERCOM system knowledge

5.Company: CTJV ( CHIYODA TECHNIP JOINT VENTURE)

Site Address: Ras Gas LNG Onshore Project Phase 2 & Al Khaleej Gas Project Phase 2

Ras Laffan Industrial City, State of Qatar

Project: Ras Gas LNG Onshore Expansion Project Phase 2 & Al Khaleej Gas Expansion

Project Phase 2

Date: October 21, 2008 to February 28,2009

Position: PMC Engineer (Process)

Duties and Responsibilities:

* Piping line check and cleaning (flushing, air/steam blowing) for Process Area, Utilities and

Common Areas

* Tightness Test and Nitrogen Purging/Inerting

* Assist Pre-commissioning and Commissioning Activities

6.Company: CTSD LIMITED (Chiyoda Toyo Sakhalin Development)

Site Address: Sakhalin LNG Complex

Sakhalin Island, Russian Federation

Project: LNG/OET Plant, Sakhalin ll Project, Phase 2

Date: April 18, 2007 to October 17, 2008

Position: Commissioning Supervisor (Process and Utility)

Duties and Responsibilities:

*Line Check and Cleaning (flushing, air/steam blowing) for Process Areas, Utilities and

Common Systems

*Tightness Test and Nitrogen Purging/Inerting

*Fuel Gas Introduction

*HTF and TCW loading & circulation

*Assist All Other Pre-Commissioning and Commissioning Activities

* Offshore site visit related to the project development

7. Company: TOSHIBA CORPORATION

Site Address: Umm Al Nar Independent Water and Power Project

Sas Al Nakhl Island

Abu Dhabi, U.A. E.

Project: Construction, Commissioning, and Operation of Combine Cycle Power Plant

5 Units Gas Turbines x 218 MW each and 2 Units Steam Turbines x 308 MW each

Date: October 12, 2004 to February 28,2007

Position : Commissioning Engineer

Duties and Responsibilities:

* Start-up and operational testing of Demineralized Water System, Instrument & Service

Air System, Closed Circuit Cooling Water System, Circulating Water and Sea Water

Supply System,Fuel Oil / Gas System, Condensate Water System, Feed Water System,

HRSG and other system.

* Assist for commissioning of Gas Turbines / Steam Turbines start up sequence, load

up to base load, shutdown sequence and unloading to stop

* Later, in charge of Demineralized Water Treatment Plant

* Normal operational check of the whole plant

8. Company: MITSUI ENGINEERING & SHIPBUILDING CO., LTD.

Site Address: Saline Water Conversion Corporation

Al- Khobar Power & Desalination Plant

Phase III 60 MIGD-470 MW Capacity

Lot 1A Contract

Kingdom of Saudi Arabia

Project: Engineering, Construction, Commissioning, Operation and Maintenance of Power Plant including Product Water Treatment Plant[Carbon dioxide (CO2) Generation Plant, Lime Plant, Hypochlorite and Dosing System]

Date: April 24, 1998 to March 27, 2002

Position: Commissioning Engineer

Duties and Responsibilities:

1. Doing commissioning works with the following activities:

* Inspect the equipments (motors, pumps, pressure tanks/vessels, piping connection instruments and other auxiliaries) for correct alignment, bolt tightness, foundation and proper installation as per drawings

* Flushing and air/steam blowing the lines/piping connections prior to running test

* Coordinate with the electrical and instrument crew in preparation for mechanical

running test

* Conduct mechanical running test of the equipments thru approved commissioning procedures with our client representatives

* Taking data during mechanical running test (Pressure, temperature, flow, vibration, speed, sound and etc.) for evaluation and references as per commissioning procedures

* Conduct initial start-up/first operation of the plant

2. During plant operation:

* Demonstration of plant start-up and unit change over from operation to stand by and

vice versa

* Conduct trainings for local operators

* Regular check up of Programmable Logic Control (PLC) panel for possible existence

of undetected fault or alarm

* Control and monitor the chemical usage of the plant

* Control the quality and maximize the production of Product Water Treatment Plant as

required by the client

* Routine check-up of level gauges of Boiler drums, pressure tanks/vessels and chemical

preparation tanks to avoid plant failure

* Trouble shoot any problems encountered during operation

* Give instructions to the operators for reliable operation of the plant

* Supervise the operation and maintenance of the plant

* Issue and approve work permit for some repair and maintenance work

* Coordinate with the construction crew for some more plant modification or expansion

* Prepare chemicals : Hydrogen Chloride, Sodium Hydroxide, Mono Ethanol Amine,

Potassium Permanganate, Hydrazine, Phosphate, Ammonia, etc. with operators to be used in plant operation and giving instructions for handling these chemicals

* Checking daily the operation log sheets and analyze the data taken by the operators

* Making manuals for operation guidance (start-up and shut down procedures) and

maintenance instructions

9. Company: THE CONSORTIUM OF STONE & WEBSTER, NOUVA

CIMIMONTUBI S.P.A. AND MARUBENI CORPORATION

Site Address: Suralaya STEAM POWER PLANT

Unit 5,6, and 7 (Coal Fired)

Jalan Florida, Merak, Indonesia

Project: Engineering, Construction, Commissioning and Operation of Suralaya Steam Power

Plant- Unit 5, 6 & 7(Steam Power Plant- 600 MW each unit coal fired)

Date: May 17, 1996 to January 31, 1998

Position: Commissioning Engineer / Shift Engineer

Duties and Responsibilities:

a) Initially worked as Start-up Engineer with the ff. responsibilities:

* Make pre-commissioning and commissioning procedures for the equipments

* Prepare and check the equipments before running

* Coordinate with the Distribution Control Improve System (DCIS) control room operator

for start-up and shutting down

* Observe and monitor the equipments during operation

* Check temperature, pressure, flow, sound and vibration of the equipments

* Take needed data as per commissioning procedure required by the client

b) Assigned as Mechanical Shift Engineer for the operation when the construction and

commissioning of the plant completed with the ff. responsibilities:

* Conduct routine roving around the plant and inspect complete posting of the crew

* Assist, support and trouble shoot any problems of the operation

* Doing routine and preventive maintenance work for the equipments

* Supervise and assist during start-up/shutting down of boilers, turbines, pumps and

other auxiliaries

* Work overtime when necessary especially during power failure and some emergency

repairs

* Record all activities/incidents in the plant within the day

* Ensure proper turnover of the plant operation to the next Shift Engineer

* Perform on -call duty at night time in case of unresolved trouble in the plant

10. Company: SOCIETA IMPIANTI INDUSTRIALI (SOIMI) S.p.A.

Site Address: P.O. Box 6863

Trans Amadi, Port Harcourt Riverstate, Nigeria

Project: Engineering, Construction, Commissioning of Oil Refineries,

Petrochemicals and Oil Terminals/Stations

Date: May 19, 1992 to September 1, 1995

Position: Mechanical Engineer / Piping Engineer

Duties and Responsibilities:

* Check and modify/revise the process and instrument diagrams, general arrangement

layouts and isometric sketches

* Design piping routing layout and associated detailed engineering

* Design of piping support layout and preparation of associated workshop fabrication

drawings

* Prepare isometric sketches for piping pre-fabrication purposes

* Prepare materials bill of quantity for piping/accessories, valves, gaskets, etc.

* Make/prepare as built drawings

* Assist during piping pre-fabrication and erection at site

* Attend weekly meetings with our clients to report progress of the project

* Site survey for the new project and make reports

* Make estimates, technical data and bidding packages for submission

* Offshore and Onshore site visit for project assistance and evaluations.

11. Company: PEPSI-COLA PRODUCTS PHIL. INC.

Site Address: Taguibo Plant, Butuan City, Philippines

Business: Bottling Plant

Date: November 1990 to July 1991

Position: Manufacturing Maintenance Manager

Duties and Responsibilities:

* Plans and controls all maintenance and premise expenditures within the assigned plant

and ensure maximum utilization of company resources

* Provide high quality product required by sales function by timely and efficient operation

of production equipment through a good preventive maintenance

* Maximize raw materials yield through tight limitation and control of equipment

downtime while maintaining at the same time the highest quality standards set by

company

* Monitor the maintenance activities and give support whenever needed

* Conduct meetings with the maintenance crew for technical assistance, work

performance and other related works

12.Company: PHILIPPINE WALLBOARD CORPORATION

Site Address: Nasipit, Agusan del Norte, Philippines

Business: Wood Industry

Date: July 1980 to December 1990

Position: Shift Engineer / Asst. Superintendent for Power Plant Operation

Duties and Responsibilities:

* Supervise during start-up, operation and shutting down of equipment/machineries such

as boilers, turbines, generators, pumps, etc.

* Coordinate with the Processing Plants or other department for their start-up and

shutting down of equipments to avoid over/under load that cause tripping off of turbines,

generators, boilers and auxiliaries

* Monitor the steam generation and the electrical distribution

* Issue work permit to maintenance crew for some repair or preventive maintenance work

* Take charge in the Power Plant operation by making sure the processing departments be

given sufficient steam and electrical supplies for continuous operation and obtaining

more production

13. Company: YOUNG AUTO SUPPLY COMPANY, INCORPORATED

Site Address: Basak, Mandaue City, Philippines

Business: Importer and Exporter of automotive spare parts

Date: June 1979 to May 1980

Position: Partsman/Salesman

Duties and Responsibilities:

* In-charge of automotive spare parts at the warehouse for orders and sales

* Record all incoming and outgoing spare parts

* Report any missing and breakage of spare parts

* Make inventory of the spare parts



Contact this candidate