R E S U M E
Of
ROGELIO D. AMISTA
Home Address:
***, *** ******, ******** ***********
Butuan City, Mindanao, Philippines
Mobile Phone No.: +63-921*******
Home Phone No.: +63-977*******
E-mail Address:acunta@r.postjobfree.com
I. PERSONAL DATA:
Nationality: Filipino
Passport Number: EC5673018
Place of Birth: Guindulman, Bohol, Philippines
Birth Date: June 27, 1955
Civil Status: Married
Name of Spouse: Angelita B. Amista
Spouse Occupation: Govt. Employee (Social Worker)
No. of Children: One (1)
Name of Child: Angelie Amista Malolot
II. EDUCATIONAL BACKGROUND:
Elementary: Guindulman Central Elem. School
Date Attended: 1962 – 1968
Course: Elementary (Graduated with honor)
High School: St. Mary Academy
Date Attended: 1968 – 1972
Course: Secondary (Graduated with honor)
College Education: University of Bohol
Date Attended: 1972 – 1978
Course: Bachelor of Science in Mechanical Engineering (Graduated)
III. BOARD EXAMINATION TAKEN (PASSED):
MECHANICAL ENGINEER LICENSURE BOARD EXAMINATION
IV. TRAININGS/SEMINARS ATTENDED:
QUALITY CONTROL CIRCLE SEMINAR – PSC, CAGAYAN DE ORO CITY PHILIPPINES
PRODUCTIVITY IMPROVEMENT SEMINAR – DTI BUTUAN CITY, PHILIPPINES
SUPERVISORY/MANAGEMENT SEMINAR – NALCO, NASIPIT AGUSAN DEL NORTE, PHILIPPINES
V. JOB DESCRIPTION (Present to Previous Employment)
1. Company: DMCI POWER CORPORATION
Site Address: 135 MW, Calaca, Batangas, Philippines
Project: Commissioning of 135 MW Coal Fired Boiler Power Plant
Date: April 7, 2014 to April 8, 2015
Position: Asst. Manager for Commissioning
2. Company: SPIE-SATORP (Saudi Aramco Total Refining & Petrochemical Co.)
Site Address: Jubail, Kingdom of Saudi Arabia
Project: Pre-Commissioning/Commissioning and Assistance to Start up and Performance Test for
Jubail Export Refinery Project.
Date: December 28, 2011 to October 14, 2013
Position: Mechanical/Piping Commissioning Supervisor for Project Management Team
Duties and Responsibilities:
* Review and make comments for Pre-comm./Commissioning activities Procedures given
by EPC / Contractor
* Attend daily and weekly Pre-comm./ Commissioning meetings
* Witnessing and Inspection for Pre-comm./Commissioning activities such as Pipelines
cleaning (Line Pigging, Steam blowing, Air blowing/Blasting and water flushing), PVP
Drying Out, Air/Nitrogen leak test, Nitrogen purging/Inerting and mechanical/equipment
Operational Test.
* Subsystems Walkthrough for RFC, RFSU and RFISU and create punch lists.
* Signs ICAPS sheets during witnessing/inspection for Pre-comm./Comm. activities which
are acceptable.
3.Company: BLACK & VEATCH (THAILAND) LIMITED
Site Address: Marubeni Black & Veatch Consortium
Glow Phase-5 Power Plant Project
Rayong, Thailand
Project: Commissioning of Glow Phase-5 Combine Cycle Power Plant/Cogen Project
Date: March 22, 2011 to September 30, 2011
Position: Commissioning Mechanical Engineer
Duties and Responsibilities:
*Commissioning works on Gas/Steam Turbines, HRSG, ElectroChlorination Plant and all
other associated systems
* Assist and coordinate with the Vendor representatives in any equipment adjustment and
tuning up
* Assist start up and operation for the whole Plant
* Balance of Plant Operation (BOP)
4.Company: CEGELEC-TOTAL
Site Address:Total E&P Yemen, Kharir Site, Yemen
Projects: TEPY Shabwa, Block 10 Gas Export Line To PEC Temporary Power Plant
Project 5060, Basement Processing Unit Train & CCU Additional Boosting Facilities
Date: March 30, 2009 to February 28, 2011
Position: Mechanical/Piping Commissioning Lead (28/28 days rotation)
Duties and Responsibilities:
*Make/prepare Operational Test Procedure (OTP)
* Make/prepare Nitrogen Leak Test Packages with mark up P&ID
* Make/prepare detailed Nitrogen Leak Test Procedures
* Witness/Inspection Pre-commissioning and Commissioning activities
* Conduct Mechanical Running Test and OTP for all equipments
* Conduct Nitrogen Leak Test and Purging/Inerting for all System/Subsystem
* Assist Start up for the whole Plant
* ICAPS and OPERCOM system knowledge
5.Company: CTJV ( CHIYODA TECHNIP JOINT VENTURE)
Site Address: Ras Gas LNG Onshore Project Phase 2 & Al Khaleej Gas Project Phase 2
Ras Laffan Industrial City, State of Qatar
Project: Ras Gas LNG Onshore Expansion Project Phase 2 & Al Khaleej Gas Expansion
Project Phase 2
Date: October 21, 2008 to February 28,2009
Position: PMC Engineer (Process)
Duties and Responsibilities:
* Piping line check and cleaning (flushing, air/steam blowing) for Process Area, Utilities and
Common Areas
* Tightness Test and Nitrogen Purging/Inerting
* Assist Pre-commissioning and Commissioning Activities
6.Company: CTSD LIMITED (Chiyoda Toyo Sakhalin Development)
Site Address: Sakhalin LNG Complex
Sakhalin Island, Russian Federation
Project: LNG/OET Plant, Sakhalin ll Project, Phase 2
Date: April 18, 2007 to October 17, 2008
Position: Commissioning Supervisor (Process and Utility)
Duties and Responsibilities:
*Line Check and Cleaning (flushing, air/steam blowing) for Process Areas, Utilities and
Common Systems
*Tightness Test and Nitrogen Purging/Inerting
*Fuel Gas Introduction
*HTF and TCW loading & circulation
*Assist All Other Pre-Commissioning and Commissioning Activities
* Offshore site visit related to the project development
7. Company: TOSHIBA CORPORATION
Site Address: Umm Al Nar Independent Water and Power Project
Sas Al Nakhl Island
Abu Dhabi, U.A. E.
Project: Construction, Commissioning, and Operation of Combine Cycle Power Plant
5 Units Gas Turbines x 218 MW each and 2 Units Steam Turbines x 308 MW each
Date: October 12, 2004 to February 28,2007
Position : Commissioning Engineer
Duties and Responsibilities:
* Start-up and operational testing of Demineralized Water System, Instrument & Service
Air System, Closed Circuit Cooling Water System, Circulating Water and Sea Water
Supply System,Fuel Oil / Gas System, Condensate Water System, Feed Water System,
HRSG and other system.
* Assist for commissioning of Gas Turbines / Steam Turbines start up sequence, load
up to base load, shutdown sequence and unloading to stop
* Later, in charge of Demineralized Water Treatment Plant
* Normal operational check of the whole plant
8. Company: MITSUI ENGINEERING & SHIPBUILDING CO., LTD.
Site Address: Saline Water Conversion Corporation
Al- Khobar Power & Desalination Plant
Phase III 60 MIGD-470 MW Capacity
Lot 1A Contract
Kingdom of Saudi Arabia
Project: Engineering, Construction, Commissioning, Operation and Maintenance of Power Plant including Product Water Treatment Plant[Carbon dioxide (CO2) Generation Plant, Lime Plant, Hypochlorite and Dosing System]
Date: April 24, 1998 to March 27, 2002
Position: Commissioning Engineer
Duties and Responsibilities:
1. Doing commissioning works with the following activities:
* Inspect the equipments (motors, pumps, pressure tanks/vessels, piping connection instruments and other auxiliaries) for correct alignment, bolt tightness, foundation and proper installation as per drawings
* Flushing and air/steam blowing the lines/piping connections prior to running test
* Coordinate with the electrical and instrument crew in preparation for mechanical
running test
* Conduct mechanical running test of the equipments thru approved commissioning procedures with our client representatives
* Taking data during mechanical running test (Pressure, temperature, flow, vibration, speed, sound and etc.) for evaluation and references as per commissioning procedures
* Conduct initial start-up/first operation of the plant
2. During plant operation:
* Demonstration of plant start-up and unit change over from operation to stand by and
vice versa
* Conduct trainings for local operators
* Regular check up of Programmable Logic Control (PLC) panel for possible existence
of undetected fault or alarm
* Control and monitor the chemical usage of the plant
* Control the quality and maximize the production of Product Water Treatment Plant as
required by the client
* Routine check-up of level gauges of Boiler drums, pressure tanks/vessels and chemical
preparation tanks to avoid plant failure
* Trouble shoot any problems encountered during operation
* Give instructions to the operators for reliable operation of the plant
* Supervise the operation and maintenance of the plant
* Issue and approve work permit for some repair and maintenance work
* Coordinate with the construction crew for some more plant modification or expansion
* Prepare chemicals : Hydrogen Chloride, Sodium Hydroxide, Mono Ethanol Amine,
Potassium Permanganate, Hydrazine, Phosphate, Ammonia, etc. with operators to be used in plant operation and giving instructions for handling these chemicals
* Checking daily the operation log sheets and analyze the data taken by the operators
* Making manuals for operation guidance (start-up and shut down procedures) and
maintenance instructions
9. Company: THE CONSORTIUM OF STONE & WEBSTER, NOUVA
CIMIMONTUBI S.P.A. AND MARUBENI CORPORATION
Site Address: Suralaya STEAM POWER PLANT
Unit 5,6, and 7 (Coal Fired)
Jalan Florida, Merak, Indonesia
Project: Engineering, Construction, Commissioning and Operation of Suralaya Steam Power
Plant- Unit 5, 6 & 7(Steam Power Plant- 600 MW each unit coal fired)
Date: May 17, 1996 to January 31, 1998
Position: Commissioning Engineer / Shift Engineer
Duties and Responsibilities:
a) Initially worked as Start-up Engineer with the ff. responsibilities:
* Make pre-commissioning and commissioning procedures for the equipments
* Prepare and check the equipments before running
* Coordinate with the Distribution Control Improve System (DCIS) control room operator
for start-up and shutting down
* Observe and monitor the equipments during operation
* Check temperature, pressure, flow, sound and vibration of the equipments
* Take needed data as per commissioning procedure required by the client
b) Assigned as Mechanical Shift Engineer for the operation when the construction and
commissioning of the plant completed with the ff. responsibilities:
* Conduct routine roving around the plant and inspect complete posting of the crew
* Assist, support and trouble shoot any problems of the operation
* Doing routine and preventive maintenance work for the equipments
* Supervise and assist during start-up/shutting down of boilers, turbines, pumps and
other auxiliaries
* Work overtime when necessary especially during power failure and some emergency
repairs
* Record all activities/incidents in the plant within the day
* Ensure proper turnover of the plant operation to the next Shift Engineer
* Perform on -call duty at night time in case of unresolved trouble in the plant
10. Company: SOCIETA IMPIANTI INDUSTRIALI (SOIMI) S.p.A.
Site Address: P.O. Box 6863
Trans Amadi, Port Harcourt Riverstate, Nigeria
Project: Engineering, Construction, Commissioning of Oil Refineries,
Petrochemicals and Oil Terminals/Stations
Date: May 19, 1992 to September 1, 1995
Position: Mechanical Engineer / Piping Engineer
Duties and Responsibilities:
* Check and modify/revise the process and instrument diagrams, general arrangement
layouts and isometric sketches
* Design piping routing layout and associated detailed engineering
* Design of piping support layout and preparation of associated workshop fabrication
drawings
* Prepare isometric sketches for piping pre-fabrication purposes
* Prepare materials bill of quantity for piping/accessories, valves, gaskets, etc.
* Make/prepare as built drawings
* Assist during piping pre-fabrication and erection at site
* Attend weekly meetings with our clients to report progress of the project
* Site survey for the new project and make reports
* Make estimates, technical data and bidding packages for submission
* Offshore and Onshore site visit for project assistance and evaluations.
11. Company: PEPSI-COLA PRODUCTS PHIL. INC.
Site Address: Taguibo Plant, Butuan City, Philippines
Business: Bottling Plant
Date: November 1990 to July 1991
Position: Manufacturing Maintenance Manager
Duties and Responsibilities:
* Plans and controls all maintenance and premise expenditures within the assigned plant
and ensure maximum utilization of company resources
* Provide high quality product required by sales function by timely and efficient operation
of production equipment through a good preventive maintenance
* Maximize raw materials yield through tight limitation and control of equipment
downtime while maintaining at the same time the highest quality standards set by
company
* Monitor the maintenance activities and give support whenever needed
* Conduct meetings with the maintenance crew for technical assistance, work
performance and other related works
12.Company: PHILIPPINE WALLBOARD CORPORATION
Site Address: Nasipit, Agusan del Norte, Philippines
Business: Wood Industry
Date: July 1980 to December 1990
Position: Shift Engineer / Asst. Superintendent for Power Plant Operation
Duties and Responsibilities:
* Supervise during start-up, operation and shutting down of equipment/machineries such
as boilers, turbines, generators, pumps, etc.
* Coordinate with the Processing Plants or other department for their start-up and
shutting down of equipments to avoid over/under load that cause tripping off of turbines,
generators, boilers and auxiliaries
* Monitor the steam generation and the electrical distribution
* Issue work permit to maintenance crew for some repair or preventive maintenance work
* Take charge in the Power Plant operation by making sure the processing departments be
given sufficient steam and electrical supplies for continuous operation and obtaining
more production
13. Company: YOUNG AUTO SUPPLY COMPANY, INCORPORATED
Site Address: Basak, Mandaue City, Philippines
Business: Importer and Exporter of automotive spare parts
Date: June 1979 to May 1980
Position: Partsman/Salesman
Duties and Responsibilities:
* In-charge of automotive spare parts at the warehouse for orders and sales
* Record all incoming and outgoing spare parts
* Report any missing and breakage of spare parts
* Make inventory of the spare parts