Post Job Free
Sign in

Maintenance Technician

Location:
Alvin, TX
Posted:
April 30, 2016

Contact this candidate

Resume:

Randy Thompson

***** ** *** *****, ***** *****

Phone: 281-***-****

E-mail: acuku0@r.postjobfree.com

Objective

Obtain a position as a Millwright Maintenance Tech. Summary of Qualifications

National Center for Construction Education and Research (NCCER) Qualifications ( National Registry Card # 3736277 ) MLWR - Industrial Millwright V2 3/31/2006

RIGFUN– Rigging Fundamentals 6/25/2008

INAL21- Industrial All Purpose Crane 6/08/2009

Work Experience

4/2011 – 7/2015 Denbury Resources Inc.

Alvin, Texas

Operator in the Hastings Field where I moved to the CO2 Facility November 2012, prior I was in the Conventional Field where I dealt with Gas Lift, Pumper Units, and ESP Units 10/1990-6/25/2009 Lyondellbasell Chemical Co.

Equistar Chemical Co.

Alvin, Texas

Chocolate Bayou Plant

6/2008– 6/25/2009 Energy Maintenance Coordinator

Receive notifications on steam leaks and /or steam traps. Plan the jobs as for manpower and materials needed and coordinate them thru the energy crew to efficiently repair and/or replace as required. Coordinate with outside vendors work that needed to be completed prior to their departure from the plant.

6/2006-6/25/2009 Fugitive Emissions Crew Lead

Receive notifications from Production Maintenance Coordinators and turn them into work orders. Plan and coordinate the first attempts due by dates due by Fugitive Emission Laws. 1/2003-6/2006 Maintenance Technician

Repairs and preventative maintenance on plant equipment such as pumps, compressors, blowers fans, exchangers, piping, and other plant equipment. Step-up Mechanical Planner since 9/2003, covered vacation for planners and material coordinator.

Involved in Turnaround Planning.

Used SAP to order materials, plan crafts, schedule man hours, requisition materials and outside services.

Set up Task lists, bill of materials, and preventative maintenance. 10/1990– 1/2003 Olefins Process Operator Technician Qualified in all outside areas in the back-end of Olefins from the quench area throughout the distillation Systems of the unit.

Qualified on both purification boards. Responsibilities included running the unit in a safe and reliable manner

Step-Up Foreman Program 1997-2003

Emergency Response Team 1990-2001 (contracted out September 2001) Assist in Production Turnaround Planning 1991-2002 Interlock PM Team

4/1989-10/1990 US Contractors

Amoco Chemicals, Alvin, Texas

Chocolate Bayou Plant

Maintenance Turnaround Planner Olefins Units

Plan man hours and materials for individual jobs.

3/1981-2/1989 Mundy Company

Conoco, Alvin Texas

Chocolate Bayou Plant

Boilermaker, Pipefitter, and Millwright

Main responsibility as Boilermaker, Pipefitter, and Millwright. Filled in as temporary Coordinator, General Foreman, Quality Control during turnarounds. Assist in turnaround and daily planning.

EDUCATION

Graduated Alvin High School 1979



Contact this candidate