I have worked and trained extensively over the past 25 years on various engineering and construction projects both domestically and internationally. I have worked on projects ranging from petrochemical, fiber optic rings, pipeline and mining to M.E.P..

I am familiar with a variety design concepts, practices, codes and procedures.

In my 25 plus years, I have worked in many disciplines, such as, electrical, piping, plant design, control systems mapping, civil, temp facilities and scada, using AutoCad, Microstation, Triforma, Plant Space and Bentley Navigator & InfoWorks.

WORK HISTORY

Design Consultant to

Client: Raul Bedud

Mina Clavero, Argentina

03/2013 - Present

Independent consultant providing design services

Focal point, coordinating with local subcontractors as well as government agencies

Responsible for the design of infrastructure of existing facility

Designed electrical, water supply and effluent disposal

Developed layouts for electrical systems and power distribution including M.T.O.s

and B.O.M.s

Lead Field Designer

Organic Growth Project

Bechtel, Chile

06/2012 – 03/2013

Responsible for design of electrical, piping, civil and construction aides for temporary facilities through early phase construction

Design and coordination covered layout of temporary facilities 8,000 man camp

Developed layouts for electrical systems for power distribution and lighting including M.T.O.s and B.O.M.s

Responsible for coordinating design deliverables, schedules, materials, etc between construction team, field engineering, warehouse and local subcontractors

Managed 2 shifts of designers (6 at peak), reviewed local subcontractor’s design submittals, monitored temp facilities construction and verified as built submittals.

Took on additional responsibilities such as performing 3rd-party inspections and assessments at offsite facilities prior to contract awards and or material purchases.

Lead Field Designer

Las Bambas

Bechtel, Chile (Peru)

08/2011 – 06/2012

Focal point, to coordinate between engineering, subcontractors and construction during

design phase and early site mobilization

Developed layouts for 5000 man camp phase one, temp facilities, laydown areas, construction roads, power distribution and effluent disposal.

Lead Field Designer

Los Bronces

Bechtel, Chile

09/2008 – 08/2011

Responsible for design of electrical, piping, civil and construction aides for temporary facilities through to client turnover

Design and coordination covered layout of temporary facilities (2) 5000 man camps,

laydown areas, construction roads, power distribution and effluent disposal.

Developed layouts for electrical systems for power distribution and lighting including M.T.O.s and B.O.M.s

Coordination of design deliverables, material releases and schedules for construction work packages of direct hires, local subcontractors and warehouse staff.

Assisted in the production of detailed schematics requiring basic knowledge of electrical equipment and local building codes.

Responsible for coordinating design deliverables, schedules, materials, etc between construction team, field engineering, warehouse and local subcontractors.

Developed, maintained and as built all underground utility drawings for duct banks, direct buried cable, piping, pipeline and gas.

Revised permanent plant IFC drawings throughout construction phase up to client turnover.

Performed 3rd-party inspections and assessments at offsite facilities prior to contract awards and or material purchases.

Designer / 3D Modeler

WTP River Protection Project

Bechtel

Richland, Washington

05/2004 – 09/2008

Multiple assignments within HLW plant design and piping, such as, 3D modeling of all electrical equipment, support modeling, pipe modeling and Isometric generation.

Updating of PD&P equipment in live model

Continued to construction site with PD&P to develop underground utility map and temp facility layout.

Lead Field Designer / Document Control Supervisor

In Salah Gas Pipeline

Bechtel International

Houston Texas (Hassi R’mel Algeria)

01/2002 – 12/2003

Setup/support of CAD stations, drafting, revising and as builting of all design engineering drawings pertaining to the 600km pipeline build.

Management of two local design staff.

Document control duties include managing two local staff, maintaining project document database in Algeria and London England with document turnover at conclusion of project.

Design Supervisor / Document Control Supervisor

Gulf Interstates

Oleoducto Crusado Pesado

Quito, Ecuador

04/2001 – 01/2002

Responsible for setup and support of CAD stations using both AutoCAD and Microstation.

Developing CAD standards for the project.

Monitored CAD design work being created done by the OCP subcontractor, Techint.

Supervised local design staff of 4

Created document control department standards for both the corporate and project departments.

Supervised document control staff totaling 8 local employees in home office and field sites,

Created corporate document numbering scheme, as well visits to the sub-contractors field and home offices to conduct audits.

CAD Designer / Materials Manager

Bechtel

Micro Fiber Network

Baltimore, Maryland

06/2000 – 04/2001

Responsible for setup/support of CAD stations.

Drafting and revising route maps and presentation drawings for the Baltimore, Richmond, Norfolk, Manassas, Boston, Phoenix and Wilmington markets.

Cad duties also include managing/monitoring cad activities of as many as four A/E firms to insure proper turnover to client.

As part of a 6 person project team, I also ordered, issued and tracked construction materials and coordinated schedules for local subcontractors and direct hires during the Baltimore fiber build.

CAD Drafter

Pemex Cantarel Offshore Project

Bechtel International Inc.

Ciudad Del Carmen, Mexico

12/1999 – 09/2000

Short term assignment with focal point of as builting P&ID’s. electrical one-line diagrams, lighting and power layouts and iso’s,

Lead Field Designer

Yucatan Peninsula Pipeline Project

Bechtel International Inc.

Merida, Mexico

05/1997 – 12/1999

Responsible for setup/support of CAD stations.

Coordinated with subcontractors on design guidelines and quality assurance of design deliverables.

Drafting and revising all P&ID’s, PD&P, electrical, controls, isos, alignment sheets cathodic protection and fiber optic drawings from IFC to turnover phases of the project.

Network administration in field construction office

Desktop support

Maintenance and repair of office hardware, computers and printers etc.

Purchase and eventual liquidation of computers, printers, plotters and survey equipment at project completion

Supervised staff of 4 local designers and 1 IT person.

Lead field CAD Drafter / Warehouse Database Input

G.M.E. / G.R.2 Pipeline

Bechtel International Inc.

Ouargla, Algeria

06/1995 – 05/1997

Drafting and revising all P&ID’s, PD&P, electrical, controls, isos, alignment sheets cathodic protection and fiber optic drawings from IFC to turnover phases of the project.

Sourced local vendors for design office materials and major reproduction tasks.

Received and issued construction materials and consumables for database input and vehicle maintenance program.

CAD Manager (M.E.P.)

Mateo Consulting Engineers

Dallas, Texas

09/1994 – 06/1995

Developed and maintained design guidelines for junior staff

Recruiting, hiring and managing a staff of full and part time CAD designers (9 at peak)

On site consulting at U.T. Southwest Medical Center with focus on linking design files, schedule and actual work being completed in field to be indicated in live model.

CAD Operator

Alcoa

Caldwell Design

Rockdale, Texas

03/1992 – 09/1994

Drafted revised and as built all permanent plant drawings pertaining to control systems, plant communications, instrumentation, grounding, power and lighting.

Coordinated work schedules and completion updates between contractors and Alcoa engineering staff.

CAD Operator

G.A.S. Umlimited

Multiple Contract Assignments (as listed)

Houston, Texas

12/1990 – 03/1992

ABB Randall – drafting and revising P&ID’s and PFD’s

Becon Inc IMC Angus - drafting and revising Plot plans, equipment locations, P&ID’s and PFD’s

Bandera Offshore – Drafting and revising one-line diagrams, power plans, conduit schedules, cable tray layouts, equipment locations, grounding, lighting plans, control systems, instrumentation plans, ladder logic diagrams, area classifications, wiring diagrams and engineering schedules.

Bechtel Inc. – Drafting and revising block flow diagrams, one-line diagrams, power plans, conduit schedules, cable tray layouts, equipment locations, grounding, lighting plans, control systems, instrumentation plans, ladder logic diagrams, area classifications and wiring diagrams.

Fluor Daniel -. Drafting and revising block flow diagrams, one-line diagrams, power plans, conduit schedules, cable tray layouts, equipment locations, grounding, lighting plans, area classifications and wiring diagrams.

Bechtel Inc.Texaco P.O.M.T.B.E. – Drafting and revising P&ID’s and PFD’s.

CAD Operator

Honeywell Chyioda Project

Hi-Tech Compu Design

Houston, Texas

08/1988 – 12/1990

Worked on Hiway 2 drafting and revising P&ID’s, PFD’s and upon completion did loop diagrams and box and slot assignments