Post Job Free
Sign in

Engineer Process

Location:
Hamilton, ON, Canada
Salary:
35 per hour
Posted:
April 27, 2016

Contact this candidate

Resume:

Edgardo D. Noriega

** **** *** *****

Hamilton Ontario Canada L8H4E4

905-***-****

*******.*******@*********.**

INDUSTRIAL ENGINEER IN MANUFACTURING – AUTOMOTIVE

(Body in White, Stamping, Paint, Assembly & Final)

A cross functional, cross trained Industrial Engineer with experience in Manufacturing, Automotive, Body Shop, Stamping and Paint, Assembly & Final, Operations Logistics & Quality

Competencies Include

* Project Management, *Industrial Engineering, *Lean Manufacturing *Operations Management, *Warehouse Management & Warehouse Management System *Automotive Manufacturing (Stamping, Body in White, Paint, Assembly & Final), *Implementing Warehouse Management Systems *Implementing Labor Management Systems in a Distribution Environment, *Facility Layouts utilizing AutoCAD 2000i, Statistical Analysis *Utilizing Minitab 11, *Cost Reduction & Process Improvements, *MODAPTS Certification, *MOST Certification, *Kitting, *World Class, *Manufacturing (WCM ) *PPAP, APQP LEAN Principles LEAN MANUFACTURING, APICS,5S, 8D,A3

Education

Canadian Equivalency from the University of Toronto

BS Degree in Management & Industrial Engineering Technology

American Equivalency from the Trust Forte Corporation

BS Degree with a dual Major in Management Science and Industrial Engineering

Bachelor of Science in Management and Industrial Engineering

(5 years) Mapua Institute of Technology – Philippine

Work Experience

INDUSTRIAL ENGINEER

LincolnTyler Management Ohio, Cleveland- Contract Industrial Engineering Analyst 2 month PROJECT For PENSKE (Ford Material Sequencing Center Feb 2015 to April 2015)

Implementing the WMS systems, conducting analysis on warehouse configuration settings

Sequencing Center evaluation and implementation of operator instruction sheets

Kitting, slotting,cubing and warehouse analysis ( optimization )

INDUSTRIAL ENGINEER / QUALITY ENGINEER

The Productivity Team – Troy, Michigan (March 2013 to Dec 2014)

Contractor for Chrysler Corporation Brampton –

Industrial Engineering Launch Support (World Class Manufacturing) Body Shop Industrial Engineering

Contractor for Ford Motor Corporation Oakville –

Industrial Engineering, Root Cause Analysis on Early Warranty Claims, extensive knowledge in QLS

INDUSTRIAL ENGINEER / QUALITY ENGINEER

Geometrics Americas, Inc. – Troy, Michigan (November 2011 to May 2012)

Project for Chrysler Sterling Heights Michigan –

World Class Manufacturing, Work Organization, Logistics Organization Kitting Project (Door Line)

Project for Case International New Holland (Nebraska USA) –

Line Balancing, Supermarket Re- Layout, PFEP and new product launch

Project for John Deere (Iowa USA) – Engineering Support for kitting systems, product launches

QUALITY ENGINEER

Nobis - Canada (November 2010 to February 2011)

Down Jackets Manufacturing/Manufacturing Seasonal short term - Quality Control

INDUSTRIAL ENGINEER

Contract Project Management - Comtech International Design (April 2007 to August 2007)

Project for the National Parts Distribution Center for General Motors

Facility Layout Changes utilizing AutoCAD 2000 (Racking, Unit Picking, Golden Zone Modules)

Inventory Analysis Categorizing and Classifying into A, B, C, D items for the Golden Zone

Established and Determined Golden Zone Area (High Volume Pick)

Determine proper distance for flow racking to accommodate JIT and KANBAN process

INDUSTRIAL ENGINEER

Contract Project Management Remco Group (3PL Project) (September 2007 to November 2007)

Objective was to determine if Remco could sustain a 15 % reduction in cost per unit. Established standards or expectations for the inbound, put-away, letdown, unit picking, and shipping departments.

Reduced Cost per unit by 15% by establishing engineered labor standards

Improved Process Flow by 50% by Implementing Flow Racking

Designed Pallet Racking Configurations for a 100,000 sq. ft. Facility

Established Cost Table/Cost Scenarios for customer pricing

INDUSTRIAL ENGINEER

A&P Dominion Industrial Engineer - The Great Atlantic & Pacific Tea Company (February 2004 to March 2005)

Provided Engineering technical input on Distribution Projects relating to TRICEPS(Transportation, Inventory Control, Engineered Production Systems)

Established Discrete Labor Standards together with engineering consultants

Maintained Discrete Labor Standards

Planned Utilization of Facilities, Equipment & Materials

Established Management Reports (KPI) utilizing ACCESS, Monarch, Excel, VBA)

Defended the integrity of the standards or expectations vs. the union representatives

INDUSTRIAL ENGINEER

Old Navy Distribution Center Brampton Ontario & Old Navy Distribution Campus Fishkill – NY (October 2000 to January 2004)

Managed Capital Projects ( Racking,Conveyor & System Enhancements)

Facility Layout Changes utilizing AutoCAD 2000i

Established Standards or Expectations utilizing MOST & Time and Motion Studies

Analyzed methods and procedures to ascertain the most efficient way to perform warehouse tasks

Directly supervised Statisticians for management reports

Facility Engineering

Managed Capital Projects (Racking, Conveyor & System Enhancements)

Established Standards for receiving, putting away, replenishment, unit picking

Conducted Training for the Associates in RF modules

INDUSTRIAL ENGINEER

Tiger Brand Knitting Company Ltd Ontario Manufacturing/Warehouse/Quality (August 1996 to August 2000)

Established Sewing and Packing Standards utilizing GSD – General Sewing Data, KARAT & Time and Motion Studies

Established Quality Standards in the Sewing and Packaging Areas

Established Warehouse Standards utilizing MOST & Time and Motion Studies

Established KPI for the management team

Participated in Train the trainer

Maintained the standards of the facility and the warehouse

Maintained the quality manual and quality procedures following ISO 9000 Guidelines

INDUSTRIAL ENGINEER / QUALITY ENGINEER /PRODUCTION ENGINEER

Levi’s Strauss Eximco Asia & Co. Stoney Creek - Ontario Manufacturing (July 1990 to March 1996)

Conducted a cost benefit analysis on the bundle handling time of a 30 unit bundle vs. 120 unit bundle

Established the quality standards for all product lines

Established the Toyota Production Systems in the facility

Independently analyzed, develop, modify and applied finishing formulas

Assisted contractors to achieve Levi’s Strauss Quality Requirements

Assisted contractors in establishing production lines

INDUSTRIAL ENGINEER

Manufacturing – Top Stitch Apparel (January 1986 to June 1990)

Established Standard Allowable Minutes for all operations in the sewing and finishing departments

Established Cost Factor per Minute for all product lines

Determined Plant Capacities

Evaluated product lines



Contact this candidate