JOVE L. SANTOS
#** *** ******* **.********* Florida
Blanca Pampanga, Philippines
Mobile #: 091******** / 091********
E-mail ad: ****.******@*****.***
Skype: jove.santos_1
Position Desired: Electrical Foreman
Objectives: To use my technical knowledge be part of a Prestigious Company.
CAREER OVERVIEW:
16 Years work Experience in different field of electrical, mechanical & Instrumentation.
SUMMARY:
Company: Dominic Construction Company, May 27, 2015 to Present
Position: Lead Electrician
Client: Florida Blanca Doctor’s Hospital
Business owner: Electromechanical Services & Electric motor rewinding shop
Company: ServFlex, Inc, March19, 2012 to February 15, 2015
Position: Electro-Mechanical Technician
Assigned in: TV5 Network Company
Company: Dominic Construction Incorporated July 2010 to January 2012
Position: Lead Electrician
Assigned in: TV5 Network Company
Company: Cegelec, Electrical & Instrument Contractor, September 2009 to May 2010
Position: Electrical Foreman
Assigned in: (CB&I) Shell Pearl GTL Project
Main Contractor: JGC & KBR (JK)
Company: Cegelec, Electrical & Instrument Contractor, January 2009 to September 2009
Position: Instrument Fitter Foreman
Assigned in: Qatofin, LLDPE
Client: Qatar Petrochemical Company
Main Contractor: Snamprogetti, a company of Saipem, SpA
Company: Rajeh H. Al Marri& Sons Company, KSA September 2006-October 2008
Position: Electical& Instrument Foreman
Assigned in: Saudi Aramco, Oil & Gas Company
Santos Electrical Repair Shop, Pampanga, Philippines 2003-2006
Position: Electric Motor & Generator Rewinder
ALMEN Electrical Supplies & Services, Pampanga, Philippines, 2001-2003
Position: Electric Motor & Generator Rewinder
Tv5 Network Company: March 19, 2012 to February 15, 2015
Position: Electro-Mechanical Technician
TECHNICAL FIELD OF SPECIALIZATION:
INSTALLATION, OPERATIONS AND MAINTENANCE OF ELECTRO-MECHANICAL EQUIPMENT (PLC DRIVEN)
Such as;
HVSG(34.5 KVA, LVSB (ABB/Schneider/480/277), ATS(ASCO7000), UPS (Chloride, Nfinity, Gammatronics,
QCM, Liebert, APC), Stand-By Generator and Truck Mounted Generator (Cummins & Perkins), Electric Motor (Centrifugal pump), Dry Type Transformers, Hitachi Chillers, CHWP, AHU, WACU, PACU & STACU, Rewinding of ElectricMotors, Read Electrical and electronic diagram, Shutdown Maintenance of Electro-Mechanical Equipment, Energy Conservation Initiative
PROJECTS
Assist and Inspect contractor’s Ongoing & Completed Electrical & Mechanical Projects.
Witness Pre-commissioning, Commissioning, De-commissioning of Mechanical & Electrical Works.
Other Field of Works:
Layout, conduiting, Installation, wiring & termination of different signaling system such as;
ETHERNET, Telephone, Co-axial Cable, CCTV etc.
Layout & installation of switcher rack
Set-up and termination of switcher patch panel.
Encode Daily Report and send through Email.
Operations and Maintenance Seminar Attended, Conducted @ tv5
Denyo Generator, FG Wilson Generator, (PLC) Woodward easYgen3000 synchronizing panel, ATS,
ASCO7000, Gamatronic UPS, Perkins Generator, Safety Training
DOMINIC CONSTRUCTION INCORPORATED, JULY 2010 to January 2012
Position: Lead Electrician
Assigned in: Natasha Tacloban, Proline Pasig, TV5 Novaliches, Makati Med, PLDT
Balanga, Talleres De Nazareth Boni.
HIGH RISE BUILDING AND INDUSTRIAL AREA:
Supervisory Knowledge
Carry-out read & interpret drawing such as, Electrical, Mechanical and architechturaldrawing etc.
As-Built Electrical plans
Prepare the Material needed in jobsite
Designate Manpower to their respective area
Coordinate with Engineering Department to keep the job in progress
Technical field of Specialization
Layout, Installation, Testing and Commissioning of different types ELECTRICAL EQUIPMENT such as;
Lighting Fixtures, Dry Type & Oil filled Transformer, ACB, MCCB, Electrical Panel Board, Industrial Genset, Industrial Motors etc.
Layout, Installation & Bending of different types of electrical conduit such as PVC, RSC, IMC, EMT etc.
Grooming & Termination of Circuit inside Panel Board
Banking of 3 single phase oil filled transformer
Circuiting, Layout & Installation of Motor Controls
Meggering of Cable.
Layout & Installation of UPS Battery Racks.
Series Termination of UPS Battery
Termination of UPS input & output supply
Splicing and Termination of Energized cable 220V
Tracing of Energized Cable for shutdown preparation
Other field of Works
•Layout, Installation, Tagging & Termination of Voice & Data Cable and Coaxial Cable.
•Layout, Installation, Conduiting& Wiring of Smoke Detector & CCTV Camera.
•Layout, Installation & Termination of network patch panel, switcher and server
Company: Cegelec Qatar, September 2009 to May 2010
Position: Electrical Foreman
Assigned in: RasLaffan Qatar, C3 Sub-station, CB&I Company Shell Pearl GTL, a JK Project
Job Description:
Supervisory Knowledge
Carry out read and interpret electrical and instrumentation drawing @ jobsite
10 minute Toolbox meeting
Prepare and Request PTW
Prepare the approved material needed in worksite
Locate cable routing as per drawing
Designate Manpower to their respective area
Technical field of specialization
Cable Pulling, Grooming& Termination of different types of electrical and instrument cable
Preparation of stub-up for underground cable riser
Layout & install, switchboards panel, (ABB Panel) & Electrical Equipment
Pre-commissioning, Pretest and Commissioningdifferent variety of electrical equipment and instrumentation.
Installation of Lighting Pole
Termination of Input and Output of Low voltage Transformer’s Cable.
Termination of MCC.
Assist Commissioning Engineer & Operations walkthrough Inspections.
Install Ground Rod and Ground Pit.
Grounding of electrical equipment, Cable Tray, mechanical equipment & electronic equipment.
TRAINING COURSES ON OCCUPATIONAL HEALTH AND SAFETYCBT
COURSES ON IMPROVING PEARL GTL SAFETY CULTURE
Conducted by Shell Pearl GTL, Qatar Petroleum, JK, Qatar International Safety Center
Conducted at Pearl Village Training Centre, RasLaffan, Qatar
•Hazard Identification - January 13, 2010,
•Hand Safety and Manual Handling January 13, 2010
•Lifting and Rigging Awareness - January 14, 2010
•Confined Space Entry - January 17, 2010
•Emergency Response CBT Course - January 18, 2010
•Working at Height - January 18, 2010
•Non-Destructive Examination - January 19, 2010.
•Hydrogen Sulfide Awareness - January 19, 2010
•Managing Pressure & Leak Testing - January 21, 2010
•Defensive Driving Refresher CBT Course - January 24, 2010
Company: Cegelec Qatar, January 2009 to September 2009
Position: Instrument Fitter Foreman
Assigned in: Qatofin, LLDPE Project
General Contactor: Snamprogetti
Client: Qatar Petrochemical Company
Job Description:
Supervisory Knowledge
Carry out, read and interpret Drawing such as Electrical, P&ID & ILD
Check and Prepare the material needed in jobsite
Designate Manpower to their respective area
Coordinate with Engineering Department to keep the job in progress
Technical field of specialization
Layout & Installations of instrumentation junction box.
Termination of Analog cable & Digital cable @ Marshalling cabinet.
Layout and installation of instruments supports, brazes, conduits, cable tray and hangers.
Layout & Installation of different types of electrical equipmentandfield instrumentation such as, H2S detector, PT, TT, FT, PDT,WT & LT.
Tubing of Pneumatic line, Testing & Commissioning of Solenoid Valve &Control Valve
Tubing of REACTOR’s INSTRUMENTATION PROCESS LINE & PURGING LINE.
Tubing of Analyzer House (GC Gas Chromatogram) line.
Tubing of Gas Carrier ( HYDROGEN, NITROGEN, OXYGEN & CARBON MONOXIDE…) CYLINDER in Analyzer house sampling gases.
Reconfiguration of Tubing of Analyzer house& Hot Box.
Tubing of KILL SYSTEM, ALKYL PUMPS & IN LINE REDUCTION SYSTEM in PROCESS LINE.
LEAK TESTING of instruments tubing high and low pressured.
Shutdown Pre-commissioning, De-commissioning & Commissioning Electromechanical equipmentTest.
OTHER FIELD OF WORKS in Free Time
Assist Bench Calibration & Process Calibration of Field instruments such as PT, FT, TT, PDT&PG as per clients standard.
Preparation of Loop Folders & Drawing standards.
Loop checking of Transmitters and solenoid control valves.
Calibration of control valves.
Troubleshooting, Dismantling & Assemble of control valves.
Assist Pre-commissioning & Commissioning of field instruments
Company: Rajeh H. Al-Marri& Sons Company, K.S.A., 2006-2008
Position: Electrical &Instrument Foreman
Project: SAUDI ARAMCO Oil & Gas Company
Area of Assignments
Khursaniyah Field Upstream Facilities Project
Contract No: 660******* of Saudi Aramco, PDD Oil & Gas Upstream Project
Shaybah Unit, Contract No: 660******* of Saudi Aramco – PDD Oil &Gas Upstream Project Tie-in SHYB-352, 353, 354 and 355 Flowlines 16” Header and 10” Test Line Header at SABKAH 53
to GOSP – 2
Job Description:
Supervisory Knowledge
Carry out, read &interpret drawing such as, Electrical Plan, P&ID & ILD etc.
Prepare the needed material and segregate the manpower to their designated areas.
Supervise Manpower in their designated areas for safety measures and work progress.
Coordinate with Engineering Department and keep track on the materials in worksite to keep the job in progress.
Executes electrical and instrumentation priority activities in accordance with scope of work Issued For Construction drawing.
Coordinates with the Civil, Electrical & mechanical Department to prevent unnecessary reworks & to keep the activities in progress.
Technical Knowledge
Tubing of instruments such as PDT, FT and PT 3-way tubing downstream and upstream pipeline, remote manifold area, scraper area, header area and Wellhead area.
Tubing of pneumatic line, Wiring & Termination of solenoid valve, MCV/MOV.
Termination of Analog Cable, Digital cable in RTU. Marshalling cabinet.
Layout, installation, wiring & termination of electrical and instrumentation equipment such as PT, FT, PDT, TT, LT, SD, H2s detector
Pre-commissioning, Commissioning and Testing of MCV/MOV etc.
Fabrication, Lay-out and installation of Instrument cable tray, supports, braces, and hangers.
Layout and installation of electrical equipment & field instruments in process control system of pipeline facilities for sour crude oil, natural gas, scraper area and powered water injection of Khursaniyah GOSP.
Pre-commissioning & Commissioning of Electrical & Instrument Equipment.
Install Ground Rod & Grounding of Cable Tray, electrical, mechanical & electronic equipment.
Leak Testing of instruments tubing.
Installation of tubing tray and tubing of Halliburton SSSV Control Panel @ Wellhead production area etc.
Assist Halliburton Vendor in Commissioning of SSSV.
Installation of Schneider PDHMS panel near wellhead area.
Installation of H2s detector & smoke detector in Rig zone area.
Shutdown, Isolation testing of Electrical & Instrument equipment, De-commissioning & Commissioning process.
Self-Employed, Electric Motor & Generator Rewinder, 2003-2006
Santos Electrical Repair Shop, Pampanga
SINGLE PHASE AC Motors TROUBLESHOOTING
Continuity Testing of coil
Testing the Resistance of starting & running winding.
Testing of Starting Capacitor or Running Capacitor
Testing of thermal overload relay.
Ground Testing.
Overhaul and recondition of electric motor bearing packing.
Installation and wiring of motor controls.
Rewinding of motor as per designed & standard.
3 PHASE AC MOTORS TROUBLESHOOTING
Continuity, Ground & Resistance Testing of coil.
Meggering of winding.
Identify the voltage rating of motor by nameplate and internal connection.
Diagnose the causes of motor faulty Operations.
Solo run rest and load test of motor and observe status.
DC MOTORS
Check winding, brushes, commutator& bearing condition.
Electric Motor & Generator Rewinder, 2001-2003
ALMEN Electrical Supplies and Services, Pampanga
Rewinding all types of AC Motors.
Layout & Termination of motor controls.
Overhaul and recondition of electrical motor.
2000-2001, Self-Employed, Electric Motor & Generator Rewinder
Santos Electrical Repair Shop, Pampanga
Rewinding all types of AC Motors.
Overhaul and recondition of electric motor bearing packing.
Layout, Installation, Wiring & Termination of motor control
EDUCATION
General Electricity, August 01, 1999 - January 31, 2000
Technical Education & Skills Development Authority, Pampanga
Associate in Computer Science, 1996 – 1998
LitoLapid College Foundation, Porac, Pampanga
PERSONAL INFORMATION
Birthdate: February 13, 1976Civil Status: MarriedHeight:5’9”Number of Children; 2