LISBETH T. CHACON
Industrial Engineer, Project Management Specialist
Houston, Texas
********@*****.***
WORK
EXPERIENCE
PETROLEOS DE VENEZUELA, S.A (PDVSA), CARACAS, CAPITAL DISTRICT, VENEZUELA
Corporate Planning Advisor, Jun 2009 – Mar 2016
● Control and monitoring of PDVSA gas projects portfolio, advising about synchronization, relevance, changes occurred, as well as supply chain with associates projects.
● Write reports to summarize testing activities, including descriptions of goals, planning, scheduling, execution, results, analysis, conclusions, and recommendations.
● Document findings of study and prepare recommendations for implementation of new systems, procedures, or organizational changes.
● Plan study of work problems and procedures, such as organizational change, communications, information flow, integrated production methods, inventory control, or cost analysis.
● Analyze investment projects portfolio, with the strategic point of view according to the company goals and policies.
● Create, define and implement indicators and control systems management and investment portfolio.
● Prepare, analyze, and verify annual reports, management indicators, and other records, using accepted statistical procedures to facilitate planning.
● Collect and analyze projects data to detect deficient plans and/or controls, non-compliance with scopes, regulations, and management policies; applying best practices of project management. Prepare detailed reports on findings.
● Review of projects status, estimate time to complete and compliance with goals.
Planning Major Projects Leader, May 2007- Jun 2009
● Develop or update project plans for gas projects including information such as project objectives, technologies, systems, information specifications, schedules, funding, and staffing.
● Monitor project execution to ensure adherence to budget, schedule, and scope.
● Prepare project status reports by collecting, analyzing, and summarizing information and trends.
● Confer with project personnel to identify and resolve problems.
● Perform risk assessments and scenarios to develop response strategies, using Pertmaster Risk
● Implement project control through Earned Value Method. ORICONSULT, C.A., ANACO, ANZOATEGUI, VENEZUELA
Planner Engineer, Nov 2006 – May 2007
● Develop of a control system based on project methodology Earned Value; applied to the portfolio of major projects of PDVSA Gas.
● Restructure of accounting structures projects ( under SAP environment) to adapt to EVM.
● Design and implement a measurement and reporting scheme based on Earned Value Method (EVM).
CONSTRUCTORA VIPA, C.A., MATURIN, MONAGAS, VENEZUELA Planner Engineer, Sep 2005– Nov 2006
● Project Planner for:- Laying of Water Wells Injectors IANI-1, IANI-2, IANS-1, IANS IANS-2 and-3 at Campo El Furrial, PDVSA.- Dismantling tanks Caripito Shipping Terminal, PDVSA
● Create and maintain construction schedules, including WBS and activities setup, costs and resource loading.
● Review project drawings in order to outline the proper scope and reflect it accordingly in the schedule and project control processes.
● Review engineering specifications to ensure compliance with client’s requirements.
● Analyze and evaluate current status against an established baseline and asses the impact of changes and schedules slippages.
● Report schedule status according to requirements to company management.
● Prepare of weekly and monthly progress reports for the client.
● Maintain the invoicing plan and prepare all the documentation required by the client.
GRUPO ROYSO, C.A., MATURIN, MONAGAS, VENEZUELA
● Planner Engineer, Jun 2005– Sep 2005
● Project Planner for: "Laying of Flow 2004,Northern District Campo Orocual, PDVSA".
● Create and maintain construction schedules, including WBS and activities setup, and resource loading.
● Review project drawings in order to outline the proper scope and reflect it accordingly in the schedule and project control processes.
● Review engineering specifications to ensure compliance with client’s requirements.
● Analyze and evaluate current status against an established baseline and asses the impact of changes and schedules slippages.
● Report schedule status according to requirements to company management.
● Prepare of weekly and monthly progress reports for the client.
● Maintain the invoicing plan and prepare all the documentation required by the client.
CONSTRUCTORA VIPA, C.A., MATURIN, MONAGAS, Venezuela Planner Engineer, Jun 2003– Feb 2005
● Project Planner for:
- Preventive Maintenance Dehydration Plant High, Train A and B. Located in the Muscar Complex, Northern District, Punta de Mata, PDVSA.
- Construction and Fabrication Platforms Cellar for Stratigraphic Wells.
- Construction of Pipeline Inspection pits for 30"section WilproEl Furrial to ACCRO Santa Barbara, PDVSA.
● Create and maintain construction schedules, including WBS and activities setup, costs and resource loading.
● Review project drawings in order to outline the proper scope and reflect it accordingly in the schedule and project control processes.
● Review engineering specifications to ensure compliance with client’s requirements.
● Analyze and evaluate current status against an established baseline and asses the impact of changes and schedules slippages.
● Report schedule status according to requirements to company management.
● Prepare of weekly and monthly progress reports for the client.
● Maintain the invoicing plan and prepare all the documentation required by the client.
P.C.M. INGENIEROS ASOCIADOS, C.A., PUNTA DE MATA, MONAGAS, VENEZUELA
Planner Engineer, Jun 2003– Feb 2005
● Project Planner for: "Adequacy System Cabling and Wiring Harness in Musipan Flow Station, PDVSA".
● Prepare technical documents for participate in public tenders with PDVSA and others state companies in order to accomplish requirements to qualification such as: quality manuals according to ISO 9001, security manuals and procedures.
● Contact to suppliers and manufactures to recibe price lists to be included in cost estimates.
● Update price data bases for materials and tools.
● Prepare unit price analysis.
EDUCATION: UNIVERSIDAD DE ORIENTE, BARCELONA, ANZOATEGUI -. VENEZUELA.
Industrial Engineer, Oct 1993 – Jun 2000
●Member of the Unit of Industrial Engineering Students.
●Operations Research Preparer.
●Three years in a row awarded with High Academic Performance Recognition.
UNIVERSIDAD CATOLICA ANDRES BELLO, PUERTO ORDAZ, BOLIVAR
– VENEZUELA.
Project Management Specialist, Sep 2005 – Jan 2010
● Awarded with the honorific mention Cumlaude
● Oral and written ENGLISH UPPER -INTERMEDIATE
ADDITIONAL
SKILLS
Domain global best practices in project implementation. Planning and control of project management, risk analysis and deviations Knowledge for definition of indicator systems and control investment portfolio management and business management.
Knowledge and domain of gas industry processes.
Microsoft Office desktop tools.
Microsoft Project. (Advanced level).
Primavera Project Planner. (Basic to Intermediate). Pertmaster Project Software (medium).
Crystal Ball (basic)
Courses,
seminars and
other events
● VI Congress on Project Management, July 2012
● Diploma in Management Indicators System:
Indicators of Management, November 2011
Strategic Planning, December 2011
Measuring Competencies: A Tool for Human Resource Management in Organizations; July 2012
Finance Basic, March 2012
● Preparing for the Project Management Professional (PMP) Exam, December 2011
● Quantitative Risk Analysis and Probabilistic Uncertainty using Crystal Ball 11.3, February 2011
● Project Management Seminar Thermal Generation, April 2010
● Project Management: Contacts, schedules, procurement, construction, October 20, 09