*** ****** **. *********,** *****
******@*******.***.*** Cellular:912-***-****)
To Whom it may concern,
I am submitting the enclosed resume for consideration of a Superintendent/Foreman. My background has given me the hands on experience in all facets of infrastructure (heavy marine,dock, and bridges).Specializing in pile driving, form,& deck (D.O.T) building bridge/marine ports that would I believe contribute greatly to your company’s goals and objectives.
You will see after reviewing the enclosed resume, I have made numerous contributions to my present, and past employer/s that has benefited the bottom line .These accomplishments are derived from my strong interpersonal and communication skills, attention to detail, and unparalleled work ethic .A key talent that I can bring your company includes a practical approach to construction with a constant eye for controlling costs and finishing the project/s
under budget, without compromising safety, or diminishing quality .My reputation precedes me for listening and analyzing employee’s ideas and thoughts on creating a safe and productive work environment.
I am enthusiastic about exploring opportunities with your company and look forward to meeting/speaking with you .I will contact you in the next few days to answer any questions and schedule an interview at your convenience.
Thank you for your consideration.
Sincerely, Joshua Relihan
OBJECTIVE:
It is my professional commitment to diligently apply my previous work experience and education to meet the challenges of my everyday working environment. In addition, it is my personal ambition to continually expand and enhance my professional skills.
SUMMATION OF SKILLS:
§ Over 15 years Construction experience
§ Mobilizing in, and out
§ Equipment procurement, and set up
§ Pile Driving Experience
§ Concrete
§ Drill Shafts
§ Auger Cast
§ Pipe
§ H-Beam
§ Sheets (All types, and sizes)
§ Timber
§ Composite
§ Have experience in all facets of pile driving. From super heavy Bridge Foundation Pile, Coffer cells, Drill Shafts, to light Residential, foundation pile, and docks.
§ Structural, Decks, Diaphrams, overhangs, set up & operate Bidwell
§ Welding
§ Substructure
Columns
§ Caps
§ Bulkheads
§ Crane Rail Caps
M.S.E Wall
§ Form Systems
§ EFCO
§ Simmons
§ Hunnebeck Italia
§ Gang, Wood, Jahn and Gates
§ Decks (Conventional, P.T)
§ Tensioning Rod and Cable
EXPERIENCE: 5/14 - Present
Waterfront Marine
Substructure Superintendent
Project:Portsmouth Tunnel Project MLK Bridge (80M)
Responsibilities: ALL pile driving operations, Footers, Columns, Caps, Heavy Lifts(Setting Bulb T's)
Work plans, critical lift plans, standard lift plans, CLP's, Coding Time
Resp for equipment procurement, template design, hiring of personel
When I hired on they were two months behind schedule. I achieved pile production as the job was bid in two weeks. IN four weeks I quadrupled pile production as the job was bid(3 pile a day). I saved an estimated 35k my first month with the company on just equip rental alone. Three to Five crews (Up to 50 ppl), also managed subcomtractors
7/14/12 - 3/14
JCR Construction
Owner - Operator
Built residential docks, and Bulkheads/Sea Walls
Foundation pile ( i.e. Private homes e.t.c)
Balfour Beatty
Night Super
Project: Truman Parkway/Savannah,Georgia (160M) 03/2011 – 07/2012
Responsible for driving pile,advancement of work trestle,advancement of all false work
Supervision of multiple crews Carpenter, pile drivers, finishers e.t.c
Planning and coordination with subs and D.O.T
Coding time, Daily reports, e.t.c
Pours, Critical lift planning
Skanska – Tidewater 08/2008 – 12/10
Pile Driving Foreman
Project: Bridge Of Lions Replacement / Rehab, St. Augustine, Florida (76.8M)
Supervision of installation and removal of sheet pile for Coffer dams
Oversees 2 crews, day and night shift
Removal of all old drill shaft
Responsible for setting girders, critical lifts (plans)
Concrete pours
Timesheets, daily reports, e.t.c
Schedule projections
All wet work (off barges)
Archer Western Contractors 06/2008 – 08/2008
Pile Super(Set-up and Train key Personel)
Project: I-10 and I-195 Interchange, Jacksonville, Florida (157M)
Training of new pile foreman and crew
Supervise instillation and removal of sheet pile for coffer dams
Timesheets, daily reports, pile logs, e.t.c
Schedule projections
Fabrication of Templates for Test and Production Pile
Cantilever Templates and Conventional Templates; 2 and 3 stage
Planning and Coordination with Night Crew
Retaining and Replacement of Personnel
Supervision of installation of all test pile (PSC 24” x 110’, 120’)
Supervision of installation of all production pile.
All dry work.
American Bridge Company 01/2007 – 02/2008
Asst. Superintendent
Project: Dames Point Container Terminal, Jacksonville, Florida (12M)
Supervision of installation and removal of sheet pile for Coffer dams, and bulkhead (3,000 Linear Feet)
Oversaw multiple crews (carpenter, and pile drivers)
Concrete pours
Timesheets, daily reports, pile logs, e.t.c
Schedule projections
Fabrication of Templates for Test and Production Pile9
Planning, Coordination, and Supervision of Subcontractors
Retaining and Replacement of Personnel
Supervision of installation of all test, and production pile (438) (Pipe 30” x 81’)
Tensioning of tie rods for tie-back wall, forming and pouring cross-ties for crane rail, forming of cantilever wall, and bulkhead
Misener Marine Company 08/2005 – 01/2007
Pile Foreman
Project: Moran Towing Pier, Jacksonville, Florida (400K)
Oversaw multiple crews (carpenter, and pile drivers)
Concrete pours
Timesheets, daily reports, pile log, e.t.c
Schedule projections
Fabrication of Templates for Test and Production Pile
Used all floating jigs, All survey work
Planning and Coordination with Construction Manager
Retaining and Replacement of Personnel
Worked primarily on barges
Supervised all falsework, rebar placement, and forming for caps
Leard Huggins Inc.
Pile Foreman 5/2000 – 6/2002
Various Projects in Sav.Ga
Rincon,Ga Powerplant,Bay St. shoring,Myrtle Beach Outfall
Prep and set up for job,mobilize in and out of jobs
Coordinate with contractor and subcontractors
Recchi / GLF
Leadman/Foreman
Project: Sidney Lanier Bridge (Cable Stay) Brunswick, Georgia (121M)
8/1997 – 05/2000
Installation of Coffer dams
Set up and pouring of footers
Setting girders
Columns, Tower Legs, Hammerhead caps, Decks(Forming)
Set up and operate Bidwell
Hanging of iron in South Towers
Drove all piling for South Approach, footers and caps
Push and tension cable for stays
90% of work off barges
REFERENCES:
Bob Fitzgerald: Construction Manager, Misener Marine #954-***-****
Jeff Addison: Owner Coastal Foundations #912-***-****
Dan Williams MCM Marine Superintendent #321-***-****