KEVIN GALVEZ AGUILAR
REGISTERED MECHANICAL ENGINEER
San Roque, Rosario, Batangas, Philippines
*********@*****.***
OBJECTIVE
To achieve high carrier growth through a continuous learning process and keep myself dynamic, visionary and competitive by engaging, committing and dedicating myself to your company; thus attain a level of both professional fulfillment and lifetime achievements.
EDUCATIONAL BACKGROUND
Tertiary Education
Bachelor of Science in Mechanical Engineering
Batangas State University- 2013
DOST Scholar
Secondary Education
Padre Vicente Garcia Memorial Academy- 2007
Brgy. B, Rosario, Batangas
With Honors
Primary Education
Rosario East CentralSchool- 2003
Poblacion A, Rosario, Batangas
Second Honorable Mention
WORK EXPERIENCE
D.M. Consunji Inc.
Makati City
November 2013 – Present
Project Construction
South Luzon Power Generation Corp. –SLPGC
2x150 MW CFB Power Plant Project – Calaca, Batangas
Position: Mechanical Engineer
In-charge for MPH (Main Power House System)
Turbine-Generator Installation
Rotating and Static Equipment Installation
Thermal Piping and Other Piping System Installation
DUTIES AND RESPONSIBILITIES
Oversee, monitor, and check related inspection on the erection of two (2) unit’s steam turbine from foundation layout, box up of LP and HIP turbine, generator stator installation, rotor insertion and bearing installation.
Oversee, monitor, and check all related installation of turbine auxiliary system, condenser, and turbine oil system until oil flushing and system restore.
Oversee, monitor, and check related inspection on the installation of thermal piping and all related piping in the main power house from installation, painting to insulation.
Oversee, monitor, and check the hydro testing all the thermal piping system in the main power house area.
Check and coordinate with the subcontractor for the alkaline cleaning of the pipes.
Oversee, monitor and check the installation of all static and rotating equipment in the main power house for both unit # 1 and unit #2.
Prepare progress report for the erection activity on the main power house area for both unit #1 and unit #2 for support on the billing.
Monitor and check the material availability so that erection will not be affected and will be continuous.
Check the credibility of material during delivery prior to erection.
Check the missing material during the erection and issue to the procurement department for purchasing.
Coordinate with other construction department for the interference and access to area, and schedule.
Read, interpret and explain construction plans and providing work direction to others.
Coordinate design and estimate requirements with sub-contractors and consultants.
Prepare the as built drawing of all the piping system and turn over to the engineering department for documentation and hand over to the owner side.
Check and do punch listing on all the piping installation and erection of equipment for rotating and static.
Prepare the balance of works of every system to identify the system to prioritize in order to proceed on the next activity.
Oversee, monitor, and check the steam blowing piping from fabrication of silencer, target plate housing, target plate holder and particle collector until installation and steam blowing.
Check and insure completeness of the system prior to turnover to the testing and commissioning group.
Assist the commissioning group during commissioning of every system.
Monitor and check the turbine rolling and synchronization of the plant.
Monitor and check the temperature, pressure and vibration of turbine bearings during rolling and synchronization.
Review and check operation and maintenance manuals to be submitted to the owner and use during plant operation period.
Monitor all the maintenance work to be done during the plant operation.
SEMINARS AND TRAININGS
Basic Occupational Health and Safety Concepts
GPB Main Campus II, Alangilan, Batangas City
November 24, 2011
Pipe Design Basics
GPB Main Campus II, Alangilan, Batangas City
December 3, 2011
Pipe Stress Basics
GPB Main Campus II, Alangilan, Batangas City
December 3, 2011
Valves in Industries: An Overview
GPB Main Campus II, Alangilan, Batangas City
December 3, 2011
Pipe Fittings and Flanges: An Overview
GPB Main Campus II, Alangilan, Batangas City
December 3, 2011
Biomass to Biogas to Power Generation
DESCO Office, Biñan City, Laguna
January 5, 2012
Chemical Safety and Industrial Safety Management
GPB Main Campus II, Alangilan, Batangas City
March 2, 2012
Fire Safety at Work
GPB Main Campus II, Alangilan, Batangas City
March 10, 2012
Compressed Air System
GPB Main Campus II, Alangilan, Batangas City
March 10, 2012
On-the-Job Training
Rotodyne Philippines Inc.
June 2012- November 2012
PERSONAL IDENTIFICATION
Age 25 years old
Sex Male
Weight 65 kg.
Height 5’6”
Civil Status Single
Nationality Filipino
Date of Birth August 25, 1990
Place of Birth Rosario, Batangas
Religion Iglesia Ni Cristo
CHARACTER REFERENCES
Maurizio Pagani
Turbine Specialist/ Construction Manager
2x150 MW SLPGC CFB Power Plant Project
Engr. Arnel Pulla
Rotodyne Philippines Inc.
President/General Manager
Engr.Nariel Bantay
Professional Mechanical Engineer