Summary
Seeking a position in the field of manufacturing/industrial engineering with a progressive organization that will allow me to grow and be an asset to the organization.
Led Kaizen events in production to improve the manufacturing process.
Developed and improved manufacturing processes by studying product and manufacturing methods and continuously evaluate processes to measure and improve productivity (process effectiveness, team efficiency).
Improved manufacturing efficiency by analyzing and planning work flow, space requirements, and equipment layout.
Assured product and process quality by designing testing methods; testing finished- product and process capabilities; establishing pass-fail standards; confirming manufacturing processes.
Prepared product and process reports by collecting, analyzing, and summarizing information and trends.
Proficient in the use of Microsoft Word, Excel, Auto CAD
Citizenship and Languages: US Citizen and Tri-lingual: English, Gujarati, and Hindi
Education
Certifications & Trainings
Masters of Science in Engineering GPA 3.25 December 2016
Emphasize in Advanced Manufacturing & Enterprise Engineering (Industrial Eng.) The University of Texas at San Antonio
Bachelor of Science in Mechanical Engineering GPA: 4.0/4.0
Saurashtra University, India November 2002
Six Sigma Yellow Belt June 2015
Center for Advanced Manufacturing and Lean System (CAMLS) UTSA
Lean Services and Office Improvement CAMLS, UTSA June 2015
Computer Integrated Manufacturing Intelitek May 2015
Diploma in CAD at CAD Institute, Surat, India July 2002
Work History
Manufacturing Engineer (Intern)
Munters, Selma, TX June 2015 to Present
Reduced cycle time of Foam Press Operation from 14 to 10 minutes
Analyzed and planned work flow, space requirements, and equipment layout in the warehouse
Standardized, made the Processes more efficient, Implemented 5S, and improved the Process for Compressor assembly, Storm deck assembly, Fan assembly, and Blower assembly
Made the Insulation cutting process more efficient
Contributed to the team effort collaboration and focusing on results
Implemented Kanban system in the warehouse
Multiple Store Manager
Triple S Express#1 & #7, Fuel Sta., San Antonio, TX Jan 2007 to Dec 2014
Relevant Coursework
Advanced Machine Design
Advanced Enterprise Process Engineering
Computer Integrated Manufacturing
Advanced Topics in Manufacturing-Sustainable Manufacturing
Advanced Manufacturing System Engineering
Topics in System Modeling