Post Job Free
Sign in

Manufacturing Engineering

Location:
San Antonio, TX
Posted:
March 16, 2016

Contact this candidate

Resume:

Summary

Seeking a position in the field of manufacturing/industrial engineering with a progressive organization that will allow me to grow and be an asset to the organization.

Led Kaizen events in production to improve the manufacturing process.

Developed and improved manufacturing processes by studying product and manufacturing methods and continuously evaluate processes to measure and improve productivity (process effectiveness, team efficiency).

Improved manufacturing efficiency by analyzing and planning work flow, space requirements, and equipment layout.

Assured product and process quality by designing testing methods; testing finished- product and process capabilities; establishing pass-fail standards; confirming manufacturing processes.

Prepared product and process reports by collecting, analyzing, and summarizing information and trends.

Proficient in the use of Microsoft Word, Excel, Auto CAD

Citizenship and Languages: US Citizen and Tri-lingual: English, Gujarati, and Hindi

Education

Certifications & Trainings

Masters of Science in Engineering GPA 3.25 December 2016

Emphasize in Advanced Manufacturing & Enterprise Engineering (Industrial Eng.) The University of Texas at San Antonio

Bachelor of Science in Mechanical Engineering GPA: 4.0/4.0

Saurashtra University, India November 2002

Six Sigma Yellow Belt June 2015

Center for Advanced Manufacturing and Lean System (CAMLS) UTSA

Lean Services and Office Improvement CAMLS, UTSA June 2015

Computer Integrated Manufacturing Intelitek May 2015

Diploma in CAD at CAD Institute, Surat, India July 2002

Work History

Manufacturing Engineer (Intern)

Munters, Selma, TX June 2015 to Present

Reduced cycle time of Foam Press Operation from 14 to 10 minutes

Analyzed and planned work flow, space requirements, and equipment layout in the warehouse

Standardized, made the Processes more efficient, Implemented 5S, and improved the Process for Compressor assembly, Storm deck assembly, Fan assembly, and Blower assembly

Made the Insulation cutting process more efficient

Contributed to the team effort collaboration and focusing on results

Implemented Kanban system in the warehouse

Multiple Store Manager

Triple S Express#1 & #7, Fuel Sta., San Antonio, TX Jan 2007 to Dec 2014

Relevant Coursework

Advanced Machine Design

Advanced Enterprise Process Engineering

Computer Integrated Manufacturing

Advanced Topics in Manufacturing-Sustainable Manufacturing

Advanced Manufacturing System Engineering

Topics in System Modeling



Contact this candidate