Lucy Wang
Structural Designer/Drafter
Professional summary
** ***** ** ********** ** architectural and structural design of industrial (power plants, substations, waste water treatment plants, potash, copper-gold, coal mining projects), residential, commercial, institutional as well as transportation projects and 3 years of experience in construction management and construction contract administration.
Professional registrations/qualifications
LEED Accredited Professional, CaGBC
Education
Revit Structure, BCIT, Burnaby BC, Canada, 09/2015 to 12/2015
Architectural & Building Engineering Technology Diploma, BCIT, Burnaby, BC, Canada, 2004-2006.
Bachelor’s Degree of Civil Engineering, University of Taiyuan Science & Technology, Taiyuan, Shanxi, China, 1981-1985.
Summary of core skills
Development of structural/architectural design drafting and checking (layout and details) using AutoCAD and Microstation for various industrial (potash, copper-gold and coal mining, electric power plants, thermal power plants, substations,), commercial, residential, institutional as well as transportation projects. Revit structural 3D modelling of BCIT term projects.
Construction contract administration with CCDC (change orders, site instructions, shop drawing review, monthly payment and site visit as well as progress report) and Material take-offs in commercial, transportation project construction.
Familiar with BC Building Code
Proficient in AutoCAD 2015, Revit 2016 (structure & arch), Microstation V8iii, MS Office, MS project
Employment history
Unemployed, 07/2015 to present
AMEC, Structural Designer, 11/2008 to 06/2015
Stantec, Architectural Technologist, 09/2006 to 10/2008
Shanxi Electric Power Surveying & Designing Institute, EIT/Structural Engineer 1986-2001
Representative projects
AMEC, Vancouver BC, 11/2008-06/2015
Coal Mountain Phase 2 Project, Teck Coal Limited, 01/2015 to 06/2015: Architectural and structural design drafting and checking (feasibility study).
FPK De-Grit project, Diavik Diamond Corporation, 05/2014 to 12/2014: Structural design drafting and checking for the process plant screens support tower
Silverdale substation project, BChydro, Vancouver BC, 01/2013 to 04/2014: Structural and architectural design drafting and checking for the 25kV GIS feeder building, 60kV GIS building and control building.
Oyu Tolgoi Copper-Gold Project, Oyu Tolgoi LLC, Mongolia, 01/2012 to 12/2012: Structural design drafting and checking for the Shaft No.1 Underground Workshop.
PCS Allen Surface Expansion Project, PotashCorp, Saskatoon, Canada, 02/2011 to 12/2011: Structural design drafting and checking for the east stair tower building.
Fort Nelson Generating Facility, BChydro, Fort Nelson, BC, Canada, 09/2009 to 01/2011: Structural and architectural design drafting and checking for the steam turbine & generator building as well as E-house building.
Picadilly, PotashCorp, NB, Canada, 11/2008 to 08/2009: Architectural design drafting for the mine & dry, salt storage, raw ore storage as well as electrical house buildings.
Stantec, Vancouver BC, 09/2006-10/2008
YVR Vancouver Airport, Vancouver International Airport Authority, Richmond BC, Canada, 2008: Architectural design drafting for development and construction document of the airport main building.
Metrotower 3, Invanhoe Cabridge, Burnaby BC, Canada, 2007: Architectural design drafting and construction contract administration for the Tower 3 and part of Tower 2 buildings (LEED certifiable building).
New Nanaimo Conference Centre, City of Nanaimo, Nanaimo, BC, Canada, 2006-2007: Architectural detailed drafting and construction contract administration (change orders, site instructions, monthly payment, shop drawing review; site visit as well as site visit report) for the new building construction.
RAV Canada Line (TPS, BW, OV Station), SNC Lavalin Inc., Vancouver, BC, Canada, 2006-2007: Construction contract administration for three stations.
Shanxi Electric Power Surveying & Designing Institute, Taiyuan Shanxi, China, 1986-2001
Self-Prepared Electric Power Plant (25MW x 2 sets), Yangquan No.3 Coal Mine, Yangquan, Shanxi, China, 2000-2001: Structural engineer for the structural design and check of the main factory-building, boiler house, production office building, chemical water workshop and test building as well as outdoor structure.
Phase 5 Work of Datong No.1 Electric Power Plant (200MW x2 sets), Datong Power Affair Bureau, Datong Shanxi, China, 2000: Structural engineer for the preliminary design of the main-factory building.
Wuyang Mine Self-prepared Electric Power Plant (30MW x 2 sets), Luan Coal Mine Affair Bureau, Wuyang, Shanxi, China, 1999: Structural engineer for the design and check of chemical water workshop and test building and outdoor structure.
Design of Standard Drawing of “1.5 x 8.0m; 1.5 x 9.0m; 1.5 x 12m Large Span Steel Twist Pre-stressed Reinforced Concrete Roof Slab ", Taiyuan, Shanxi, China, 1998: Structural engineer for the structural design.
Phase 5 Work (technical transformation work) of Taiyuan No.2 Thermal Power Plant (200MW x 1 set), Shanxi Power Affair Bureau, Taiyuan, Shanxi, China, 1997: Structural engineer for the preliminary design and foundation treatment.
Phase 1 Work of Yangquan Thermal Power Plant (300MW x 4 sets), Shanxi Power Affair Bureau, Yangquan, Shanxi, China, 1995: Structural engineer for the typical structural design of 20t/h starting boiler house and hydrogen-making station.
Phase 1 work of Yushe Electric Power Plant (100MW x 2 sets), Shanxi Power Affair Bureau, Yushe, Shanxi, China, 1994: Structural design of the main factory-building.
Phase 4 work of Taiyuan No.2 Thermal Power Plant (200MW x2 sets), Shanxi Power Affair Bureau, Taiyuan, Shanxi, China, 1993: Structural engineer for the roofing structure design of main factory-building (structural steel roof truss and large pre-stressed reinforced concrete TT roof slab), layout and structure design of trenches and tunnels of thermal network in the plant area as well as structural steel roof truss (application and popularization of drawing software of computer).
Taiyuan Yeyu 220Kv Substation, Shanxi Power Affair Bureau, Taiyuan Shanxi, China, 1990-1992: Structural design of the main control building; project coordinator for construction management and material take-offs.
Phase 5 work of Taiyuan No.1 Thermal Power Plant (200MW x 4 sets), Shanxi Power Affair Bureau, Taiyuan, Shanxi, China, 1987-1989: EIT for the structural design of frame and floor of the main factory-building; pulveriser basement.
Jincheng 220Kv Substation, Shanxi Power Affair Bureau, Jincheng, Shanxi, China, 1986: EIT for the structural design of main control building.