Post Job Free
Sign in

Project Auto Cad

Location:
Torrance, CA
Posted:
March 16, 2016

Contact this candidate

Resume:

Zafar Iqubal

SENIOR STRUCTURAL DRAFTSMAN

Mob; 971*********

Email; *****.*********@*****.***

PROFESIONAL SNAPSHOT

Proficient in using, PDMS, TEKLA, and Auto CAD.

Possess strong quality to grow true professional utilizing “take-charge” attitude and commitment to stretch the boundaries in respective field.

Familiar with International code and specifications (AISC, ASTM, ASME, API).

Ability to make bulk Material Take offs (MTO) & Material Requisition form (MRF).

QUALIFICATION

TECHNICAL

Diploma in mechanical engineering from Rajasthan University.

ACADEMIA

Passed 10+2 (commerce) with 1st class from JKS College.

Passed Matriculation with 2nd class.

PROFESSIONAL

TEKLA Structure Advance. (Template, Report & Intg. Component)

TEKLA Structure Basic.(Modeling & Editing)

AVEVA PDMS (DESIGN MODULE)

Auto CAD.(2D)

.

ORGANIZATION

A.Working as a SENIOR STRUCTURAL DRATFSMAN in DODSAL Engineering & Construction Dubai from Nov 2015 to till continues.

PROJECT; Execution of Gas Compressor and Reinjection station-Zcina HMD North Algeria

Client:-SONATRACH.

B.Working as a STRUCTURAL DRATFSMAN in DENHOLM YAM LLC Abu Dhabi from Jan2012 to Nov 2015.

PROJECT; 1. UPPER ZAKUM 750 Island surface facility Project – EPC-2 Local Equipment room (LER) and Local control room (LCR) for West and North Island.

Client:-ZADCO, PEROFAC

1.UPPER ZAKUM 750 Island surface facility Project – EPC-2

Process and Power substation modules.(132Kv, IFCC, Process Substation-1&2 and VFD Gas Compressor building.

Client:-ZADCO, PEROFAC

2.SARAB Island Field Development Project

Package-4 (Process Modules)

Client:-Abu Dhabi Marine Operating Company, HYUNDAI

3.SARAB Island Field Development Project

Package-4 (Modularized Pipe Racks)

Client:-Abu Dhabi Marine Operating Company, HYUNDAI

4. SARAB Island Field Development Project

Package-3 (Offshore Platforms)

Client:-Abu Dhabi Marine Operating Company, PETROFAC.

6SARB Artificial Island Field Development Project

Package-6 (Modular Building)

Client:-Abu Dhabi Marine Operating Company, HLG.

7.RUWAIS Refinery Expansion Marine Development.

Package-3 (Pipe racks & substation building).

Client:-TAKREER Abu Dhabi oil Refinery Company, GS E&C.

8.RUWAIS Refinery Expansion Marine Development.

Package-3 (Down Stream Piping).

Client:-TAKREER Abu Dhabi oil Refinery Company, SK E&C

Responsibilities. For TEKLA modeling and drawings deliverable

Using Tekla Structure software for structural Modeling and Detailing.

Creating a Clash free Structural Model in TEKLA.

Applying Macros for connections.

Creating the secondary structure(Platform, Walkway, Stair Case and Handrails, Ladder).

Generating and editing the drawings (General Arrangement, Assembly and Single part).

Generate reports and modification in report formats.

Advance TEKLA, Creating Template and Title block as per project requirement.

Preparation Material Takes off.

Extraction STAAD to TEKLA.

Extraction TEKLA to Auto CAD.

• Proper Resource Estimation & allocation

• working as per client specifications.

• Provide quality and quantity of models and drawings within schedules

• Knowledge in Paint Finish, Material grade, Bolt grade and weld specifications

• Checking, single part drawings, MTOs and CNC files

• Clarifying modelers, editors and checkers queries

• Client coordination

• Co-ordination with internal staff modeler / editor and prepare if any RFI or queries

• Accurate interpretation of IFC drawings, Specifications and Connection design

Interdisciplinary Experience

• Good sound knowledge in process piping.

• Good understanding of piping material, fittings and Pipe supports.

• Experience in piping Isometric drawing and P&ID.

• Aware with modules MEP work e.g.

• E&I cable trays, cable tray support with NEMA Standard.

C.Worked as a Structural Draftsman in JJCO ENGINEERING PVT LTD. India from Dec-2010 to Dec-2011.

PROJECT EXPERIENCE

9.Petroleum expansion Project. (Oil & Gas Project)

Client: -Oil and natural gas corporation-KSS (Pipe Racks)

10.TATA TIMKEN LTD.

Shovel Bucket 3.3 m3 and 1.7 m3 Heavy duty equipment.

Responsibilities.

Maintaining the drafting standard and scaling.

Modeling and Detailing in TEKLA (Pipe racks, Office buildings, portal Bracing).

Preparation GA Drawing, Assembly drawing and shop drawing.

Assign the assembly mark and Numbering.

Creating the Template for various projects.

Produce REPORT file (assembly/parts/material).

Provide the work front to shop.

Preparation Project MTO to estimate the cost control.

Preparation nesting plan.

Preparation cutting plan (material cut list).

Ensuring the material Grade & profile weight.

Material Cut list and inventory sheet preparation.

Handing the drawing submittal system.

Keeping all the drawing and document record.

MEP Coordination 3D model for all discipline.

Coordination to Supervisors for design clarification at site.

Proficient in conversant (Models) into another software.

Working as per company safety procedure.

D.Worked as a Draughtsmanin DUTCO group LLC Dubai from Jun’09 to Aug ’2010.

PROJECT EXPERIENCE

11.Sodium reduction and crucible cleaning feed plant.

Client:-Emirate Aluminum. Worley Persons.

Responsibilities.

AUTO CAD

Involved with Designer to produce the Drawing.

Worked on Auto CAD.

Preparation of Structural Design drawing.

Preparation of structural fabrication drawing in auto cad.

Documentation and drawing submission to client.

Preparation bill of materials.

Mathematically calculation of elevation at site.

Site visited for more convenience in design.

Preparation welds numbering drawing.

PERSONNEL INFORMATION.

Father name: Ainul Haque

Date of birth: 26 Dec 1987

Marital status: married

Language: English, Hindi

ADRESs: Azad Nager Jamshedpur Jharkhand India.

Passport detail.

Passport no.: G3211940

Date of Expiry: 07-2017

Place of Issue: Ranchi India



Contact this candidate