Post Job Free
Sign in

Project Engineer

Location:
Canada
Posted:
March 09, 2016

Contact this candidate

Resume:

Job Application Letter

Thailand March’**

Subject : Job Application Project Engineer,Project Coordinator

Dear sir,

I send an the letter application and Resume to your

I has experience over the past ten years as Detailing engineer in steel structure

& construction work

In that position I’m responsible area Thailand, Rayong province

I want find experience for overseas

Therefore, I really hope there is a chance interview, Which I can explain in the work

I hope to share with you.

With best regards,

Pipatchon Pirom

+66(0)89-7986617

Email: *********.****@*******.**.**

RESUME

PIPATCHON PIROM

No.9/29 M.11 T.NONGLALOK A.BANKHAI

RAYONG 21120 THAILAND

Hand Phone: +66(0)89-798-6617

Home Phone: +66(0)3864-6501

E-mail : *********.****@*******.**.**

Personal Data

Date and place of birth: 25 September 1970, Nakhonratchasima, Thailand

Sex: Male

Nationality: Thai

Marital Status: Married

Religion: Buddhism

Tax No: 330**********

Social Fund No: 330**********

Height: 170 cm.

Weight: 67 kg.

Apply Position: Project Engineer / Site Engineer

Professional Experience 16 Year

March 2009 to Present ( 6 Year)

PAE (Thailand) PUBLIC CO.,LTD. (RAYONG) OIL & GAS

Position: Project Engineer

Duties and Responsibilities:

- Coordinator Drafting / drawing check

- Control Drawing shop & Fabrication

- Monitoring and controlling the fabrication and installation of structure & piping

- Project trouble shorting

- Engineering / advice to Project manager

- Shop management

- Plan status engineering

Project: Piping / pipe support / structure for MTO (BIDDING WORK)

- Assistant Project Manager Yard

-Estimate material weight / area for biding

-Estimate cost control of work

-Estimate structure for bidding

Project: PTTGC GHU SCRUBBER

-Fabrication shop management piping & structure

-Coordinator between site & fabrication shop

-Submitting drawing for fabrication

-Monitoring manpower advise to manager clarify

-Monitoring and controlling the fabrication and installation of structure & piping

-To order material & certificate ensure delivery on time.

- Taking-off quantity, read tender documents and drawings.

- Coordinate with contractor representative for as-built drawings, test reports, release notes, fin

acceptance certificates, etc.

- Estimate cost of additional work and keep record.

- Coordinate with project manager/ engineer for construction drawings, project documentation, schedule,

installation procedure etc.

- Co-ordination between QC team and Production team

- Coordinate with construction team for material delivery to job sites

- Ask for quotation, tender clarification, fill up tender document or prepare contract and submission.

- Submitting documents of certificate and follow document status.

-Clear Fabrication ship loose

-Monitoring Material received & return

Project: PTTGC AR2 VRU VAPOR RECOVERY AROMATICS

-Fabrication shop management piping &structure

-Coordinate between site & fab shop

-Submitting drawing for fabrication

-Monitoring manpower advise to manager clarify

-Monitoring and controlling the fabrication and installation of structure & piping

-To order materials & certificate ensure delivery on time.

- Taking-off quantity, read tender documents and drawings.

- Coordinate with contractor representative for as-built drawings, test reports, release notes, fin

acceptance certificates, etc.

- Estimate cost of additional work and keep record.

- Coordinate with project manager/ engineer for construction drawings, project documentation, schedule,

installation procedure etc.

- Co-ordination between QC team and Production team

- Coordinate with construction team for material delivery to job sites

- Ask for quotation, tender clarification, fill up tender document or prepare contract and submission.

- Submitting documents of certificate and follow document status.

-Clear Fabrication ship loose

-Monitoring Material received & return

Project: (HTY SIEMENS) HATYAI SUNGKHLA

-Monitoring and controlling the manpower for erection structure and equipments.

-Monitoring the submitted and received documents.

-Monitoring and controlling the fabrication and installation of structure

-Planning schedule for Project.

-Co-ordinate between project planning and construction team.

-Submitting drawing for fabrication

-Identify contract scope of work and co-ordinate with site supervisor to prepare claim evaluation.

-Prepare and submit progress follow-up.

-Taking-off quantity, read tender documents and drawings.

-Co-ordination between QC team and Production team

-Ask for quotation, tender clarification, fill up tender document or prepare contract and submission.

-To order materials and ensure delivery on time.

-Estimate cost of additional work and keep record.

-Submitting documents of FI and follow document status.

-Co-ordination between QC team and Production team

-Coordinate with project manager/ engineer for construction drawings, project documentation, schedule, installation procedure etc.

-Participate in project kick-off meeting with supervisor and contractor prior to execution of jobs.

-Coordinate with contractor representative to ensure that project quality plan / Inspection and Test Plan are submitted and approved prior to the execution of jobs.

-Coordinate with Contractor Representative to ensure that all construction procedures (WPSs, PQRs, Blasting & Painting Pressure Testing Procedure, Fabrication Procedure, Site Erection Procedure, NDT Procedures etc.) are in place prior to execution of jobs.

-Coordinate with construction team for material delivery to job sites.

-Coordinate with contractors for manpower, tool & equipments mobilization.

-Coordinate with contractor representative for as-built drawings, test reports, release notes, final acceptance certificates, etc.

Project: TFPSO COWLINE (OFFSHORE Chevron Thailand)

-MTO material take-off

-Planning status shop drawing for fabrication

-Planning schedule for Project.

-Monitoring the submitted and received documents.

-Submitting drawing for fabrication

-Coordinator Fabrication and Engineering

-Co-ordination between QC team and Production team

-Clear Fabrication Details drawing on site

-To order materials and ensure delivery on time.

-Check Frame Fabrication fit-up

-Control status of drawing & fabrication

-Cutting list Cutting plan

-Clear Fabrication ship loose

-Clear As-built drawing

-Monitoring Material received & return

Project: BEPP HEATING UPGRADE (OFFSHORE Chevron Thailand)

-MTO material take-off

-Main Deck / Cellar Deck / Mezzanine Deck / Vertical pipe

-Planning status shop drawing for fabrication

-Coordinator Fabrication and Engineering

-Clear Fabrication Details drawing on site

-To order materials and ensure delivery on time.

-Check Frame Fabrication fit-up

-Control status of drawing & fabrication

-Cutting list Cutting plan

-Clear Fabrication ship loose

-Clear As-built drawing

Project: E-HOUSE Songkhal Project (OFFSHORE Chevron Thailand)

-Clear Details drawing on site

-Clear Fabrication Duct work

-Celling support

-Clear drawing on site

-MTO material take-off

-Cutting plan

-As-built drawing

Project: Tank Project (Chevron Thailand)

-Check Drawing for fabrication

-Clear Detail of cutting plan

-As-built drawing

July 2008 to December 2008 ( 5 Month)

CLOUGH (Thailand) CO.,LTD.

SATTAHIB YARD MAHIDOL ADULYADEJ ROYAL NAVAL (U-TAPOA ) CHONBURI OIL & GAS

Position: Engineer (Engineering)

Duties and Responsibilities:

Project: Nucostal Songkhal Project (OFFSHORE)

- Details drawing of the control shop

- Main Deck

- Cellar Deck

- Subsea Jecket

- Mid span brace

- Process Skid

- Flare boom

- Walkway

- Pile shore

- Seafalst training

- Check Cutting plan

- Check drawing and As-built drawing

July 2006 to June 2008 ( 1 Year 11 Month )

BOONTHAM INTER GROUP ENGINEERING AND CONSTRUCTION CO.,LTD. (RAYONG)

Position: Project Engineer

Duties and Responsibilities:

Project: Steel structure (GSC) Chemical Maptaput Rayong

Control under construction

Steel structure & piping work

To order materials and ensure delivery on time.

Tie in Erection & Preassembly work

Details drawing of the control shop

Check material

pipe rack structural fabrication work and civil work in Industrial Estate Map Ta Phut.

Project: Factory new work shop (BSP) Rayong Civil work

Control under construction

Design work shop

Steel structure roof

Details drawing of the control shop

Check material

Materials take off and Estimate net weight STR./CIVIL

Project: Lifting Beam mtechnology Chonbury

Control under construction

Design

Steel structure

Details drawing of the control shop

Check material

Materials take off and Estimate net weight

Project: Flare Stack Bangchak Bangkok

Control Fabrication

Steel structure

Details drawing of the control shop

Check material

Materials take off and Estimate net weight

Project: Piping / pipe support / structure for MTO (BIDDING WORK)

Estimate material weight / area for biding

Estimate cost control of work

Estimate structure for bidding

Estimate Civil work for bidding

September 2004 to June 2006 ( 1 Year 9 Month)

SRISAKRON CONSTRUCTION AND ARCHITECTS CONSULT CO.,LTD.

Position: Project Engineer

Duties and Responsibilities:

Project: Suvarnabhumi Air port (Sankyu-thai)

Shop drawing platform walkway

Celling beam support

Details drawing of the control shop

Check

Project: Home/Building/Factory Take off MTO (BOQ) Civil Work for Bidding

Estimate material

Estimate cost control of work

August 1998 to August 2004 ( 6 Year)

UCS (THAILAND) COMPANY LIMITED.

Position: Cad manager

Duties and Responsibilities:

Project: NPCX PROJECT (Vatana Phisal)

Shop drawing of structure steel, platform

Coordinate control shop detail part

Joints details, and clear details

Check Shop Drawing

Materials take off and Estimate net weight

Project: INLET & OUTLET DUCT (PSP)

Layout for shop duct and detail part

Coordinate control shop detail part

Joints details, and clear details

Check Shop Drawing

Materials take off and Estimate net weight

Project: Cock Burn (Euromill)

Layout for shop detail

Coordinate control shop detail part

Joints details, and clear details

Check Shop Drawing

Materials take off and Estimate net weight

January 1997 to January 1998 ( 1 Year)

WNS COMPUTER DESIGN CO., LTD.

Position: Chief Detailing Engineer

Duties and Responsibilities:

Project: BUILDING STRUCTURE (SAMOTO)

Shop Drawing Main Steel Structure

Design Joints Submit to Main Contract

Check Shop Drawing

Materials take off and Estimate net weigh

August 1994 to January 1997 ( 2 Year 5 Month)

DRAFTING AND AUTOCAD SYSTEM COMPANY CO.,LTD.

Position: Chief Detailing Engineer (Auto Cad)

Duties and Responsibilities:

Project: New Factory TPI, Italian-Thai Development Public Company Limited (Samutprakarn)

Shop Drawing Pipe Rack (Steel Structure)

Take of Material

Check Shop Drawing Pipe Rack

Project: BTS, Italian-Thai Development Public Company (Samutprakarn)

Shop Drawing Main (Steel Structure)

Material take off

Check Shop Drawing

Project: Tank vessel (MPS MITT PROJECT)

Detail tank & platform handrail

Material take off

Education: Bachelor of Science B.Sc. (Construction Civil)

Chandrakasem University

Computer Proficiency: Microsoft Excel 97 up, Microsoft Word 97 up, Microsoft Power point

Microsoft Project, AutoCAD 2000 up, etc.

Reference

Mr. Thanakorn Tanasai

Fabrication Manager,

PAE (Thailand) Public Company Limited

88/2 M.5 T.Makhamku A.Nikhompattana Rayong 21180

Tel +66(0)89-194-6964



Contact this candidate