ARMAN B. MORTIZ
Liwa St., Abu Dhabi, United Arab Emirates
***********@*****.***
Career Objective
Willing to contribute to the success of an organization through my in-depth knowledge and skills related to the field of telecommunications and customer service.
Qualification Highlights
18 years experience in the field of Telecommunications.
Experienced in Transmission Network Design / Microwave Transmission Radios and Installation Engineering.
Installation, Testing, Commissioning, Operation and Maintenance of different Wireless GSM BSS and Broadband Microwave Digital Radio Back haul Equipment. (STM 1, SDH & PDH radios)
Microwave broadband Radio equipment :
1.NERA 290NL series STM1 4, 6 and 8 Ghz SDH and PDH radios
2.NEC NEO and IPASOlinks 23, 15 and 13 Ghz STM1 SDH and PDH Fast Ethernet IP based radios
3.NEC 2500s 2 Ghz SDH / PDH radios
4.NOKIA DMR 2000 2 Ghz PDH radios
5.ERICSSON Mini and Micro link E 23 and 15 GHz PDH radios
6.HARRIS FARINON 7 Ghz PDH radios
7.23 and 15Ghz AXCELERA EXCELFLEX Fast Ethernet Microwave radios
8.23,15 and 18Ghz Intracomm Fast Ethernet High capacity and performance Microwave radios
Alcatel and HUAWEI GSM BSS, 3G and LTE equipments :
1.G2 /G3 900 / 1800 A910 EVOLIUM, Standard, Microcell BTS
2.900/ 1800 Base Station Controllers (BSC)
3.A925 / MT120 Transcoders
4.Huawei UMTS 3G BSS equipment
5.Radio and GSM feeder line VSWR sweep testing.
Installation, commissioning, integration and troubleshooting of wireless (3G+4G) telecom system.
Installation & commissioning of GPON ONT equipments (Huawei / Zhone) as the backhaul for 2G & 3G links. GPON ONT’s such as Huawei OT928G and MA5628 / Zhone 5114 and 5120.)
Experienced and competent on Installation & commissioning of HDSL / SHDSL modems for Leased Lines, PRI, Data, ATM/FR, and internet with bandwidth from 256kpps to 2Mbps.
Provisioning of 2MB Abis link for GSM & UMTS sites using HDSL Modems, Microwave Radios, and via Fiber Optics as the medium of transmission.
Experienced in Out Side Plant (OSP) works.
Performs site inspections, quality audit as per defined in audit plans.
Attend call outs 24/7 for faults that needs rectification & urgent response.
Intensive drives and desires to enhance and expand knowledge in the field of Telecommunications.
Adopts easily in any working environment and conditions.
English proficiency and strong interpersonal skills.
Professional Experience Date
Electronics / Telecommunication Engineer May 2003 to present
ETISALAT (Emirates Telecommunications Corporation)
Airport Road, P.O. Box 300
Abu Dhabi, United Arab Emirates
www.etisalat.ae
Assigned in Integrated Services Development II for onshore and offshore
Installation, Testing, Commissioning, Operation and Maintenance of the different Wireless GSM BSS and Broadband Microwave Digital Radio Back haul Equipment.
Microwave Radios Antenna alignment.
Performs Site inspections, surveys and inventory.
Staff supervision and Team leader on daily task activities on field.
Installation, commissioning, integration and troubleshooting of wireless (3G+4G) telecom system.
Installation & commissioning of GPON ONT equipments (Huawei / Zhone) as the backhaul for 2G & 3G links.
Coordinate and follow-up with the concern sections all the pending requirements for the completion of GSM site.
Prepare and finalize GPON installation & commissioning report as well database entry of the completed sites.
Provide the backhaul for LTE sites (4G).
Technical survey of existing and new cell sites for provision of new fiber optics.
Installation and commissioning of 2MB Abis link for GSM and UMTS sites using HDSL (High-Bitrate Digital Subscriber Line) modem and ASMOS CT 3.6 software.
Installation and commissioning of all links in Abu Dhabi Region working on HDSL modem (PRI/Internet/Data/ATM/FR/Leased lines, etc.) with speed of more than 256k up to 2MB.
Implementation of 2MB backhaul links via digital radio and fiber optics routes for GSM/ UMTS and data links.
Installation of external alarms interfaces for GSM sites - (Alcatel Evolium BTS).
Implementation of 2MB backhaul links via digital radio and fiber optics routes for GSM/ UMTS and data links.
Installation and commissioning of CSDH equipments: Lucent AM 1 and Huawei Metro 1000.
Transmission Engineer September 2001 to April 2003
ALCATEL PHILIPPINES
No. 2270 Don Chino Roces Avenue
Makati City, Philippines
www.alcatel-lucent.com
Assigned in Digital Telecommunication Philippines,Inc. Inc.. (DIGITEL) GSM 1800 PROJECT.
Responsible for engineering study including path profiling, field survey and network design.
Conduct line-of-sight confirmation and transmission path calculation using pathloss III and IV.
Studies the microwave transmission and BTS (Base Transceiver Station) coverage of each site.
Conduct joint site survey with the RF engineers for the proposed BTS sites.
Prepare and finalize survey report documents as well as the link budget of each hop.
Supervise indoor and outdoor installation of Alcatel’s microwave radios.
Perform testing and commissioning of microwave transmission radios.
Conduct line-of-sight confirmation and transmission path calculation using Ericsson Radio Link Tool software.
Studies the RBS (Radio Base Station) coverage and microwave transmission of each site.
Perform installation and integration of Ericsson RBS 2202 for new BTS and change out sites including testing and commissioning.
Ensure that the quality of documentation is done in accordance with the requirements and specifications of the customer.
RBS/Transmission Engineer February 2001 to July 2001
TELEDESIGN PHILIPPINES, CO., INC
Unit 113 Chateau Verde Condominium,
Valle Verde I Gate 2, E. Rodriguez Jr. Ave.,
Pasig City, Philippines
www.teledesign.com.ph
Assigned in Ericsson Telecommunications, Inc., Philippines Globe Viking 4 Phase 8 Project (GSM)
Carry out indoor and outdoor installation survey for new BTS and change out sites.
Responsible for the revision of site data for the approval of survey reports.
Prepare and finalize the installation engineering documents of each site for change-out and for new sites. (covering South Luzon, Visayas and Mindanao Area.)
Responsible for detailed engineering study including path profiling, field survey and network design.
Conduct line-of-sight confirmation and transmission path calculation using Ericsson Radio Link Tool software.
Studies the RBS (Radio Base Station) coverage and microwave transmission of each site.
Perform installation and integration of Ericsson RBS 2202 for new BTS and change out sites including testing and commissioning.
Ensure that the quality of documentation is done in accordance with the requirements and specifications of the customer.
Assistant Chief Engineer August 1999 to February 2001
DWLL 94.7 Mellow Touch/ DWBL 1242 kHz FBS Radio Network, Inc
Suite 908 Paragon Plaza, EDSA cor. Reliance St.,
Mandaluyong City, Philippines
Assigned in the maintenance of transmitters, antennas and other broadcasting equipment.
Supervise and at the same time work in a group to install and repair transmitters namely: Broadcast Electronics @ 35KW Power, Continental Electronics @ 25KW Power transmitter and 6 BAY ERI and a backup of 2 BAY JAMPRO transmitting antennas.
Recommend the type of equipment needed in the maintenance of broadcasting network.
Assigned in the maintenance of computer network.
Coordinate with the contractor in the preparation, installation of a Web Server.
Install computers to be added into the network
Troubleshoot computers and computers’ peripherals.
Conduct research on new broadcasting technologies and update management on this matter.
Engineer I March 1997 to June 1999
Municipal Telephone Projects Office (MTPO) – Department of Transportation and Communications (DOTC)
21/F Strata 100 Bldg., Emerald Avenue
Ortigas Center, Pasig City, Philippines
Assigned as Field Engineer in the province of Tawi-Tawi, Cagayan and Kalinga Apayao.
Responsible for detailed engineering study including path profiling, field survey, network design, specification, cost estimates, traffic, selection of appropriate technology and request for price proposal for MTPO project.
Responsible for Wireless Local Loop (WLL) transmission design in the area.
Responsible for the installations of microwave TDMA radio point to multi-point, IRT 2000 and SR500 radio including testing and commissioning.
Studied and analyzed the Barangay Telecommunication Center (BTC) design for each province.
Inspect site location. Determine the accessibility of the proposed central station, repeaters and outstations, towers, building as well as overall structure of the BTC within each province.
Coordinate with private and government agencies regarding the proposed plan and installation of BTC in their area.
Training and Seminar Date
Essentials of Project Management May 22- 23, 2013
Etisalat Academy, Dubai, U.A.E.
Interconnecting Cisco Networking Devices 2 (ICND-2) June 24-28, 2012
Etisalat Academy, Dubai, U.A.E.
Interconnecting Cisco Networking Devices 1 (ICND-1) April 22- 26, 2012
Etisalat Academy, Dubai, U.A.E.
IP Networking Essentials April 05 - 07, 2011
Etisalat Academy, Dubai, U.A.E.
FTTH Installation and Termination November 15 - 19, 2009
Etisalat Academy, Dubai, U.A.E.
Gigabit Passive Optical Network (GPON) May 24 - 25, 2009
Etisalat Academy, Dubai, U.A.E.
IP Networks October 07 - 09, 2008
Etisalat Academy, Dubai, U.A.E.
TCP/IP Protocols March 23 - 27, 2008
Etisalat Academy, Dubai, U.A.E.
GSM Overview December 04 - 06, 2007
Etisalat Academy, Dubai, U.A.E.
Fundamental of Optical Fibre Communications May 06-10, 2006
Etisalat Academy, Dubai, U.A.E.
Installation Quality Standards February 14-18, 2004
Etisalat Academy, Dubai, U.A.E.
3G (3rd Generation) Overview ( GPRS, UMTS, WCDMA ) August 13-17, 2001
Teledesign Philippines Training Center
GSM Essentials March 10, 2001
Ericsson Telecommunication, Inc.
COT 103- Card Only Telephone and Pollquest Management System Training December 4, 7 -11, 1998
Elcotel Telecommunication/ Multiline Communication
IRT 2000 Radio Theory, Operation & Maintenance and June 16 -27, 1997
Microwave Transmission Design
Telecommunication Training Institute (TTI)
Education Date
Bachelor of Science in Electronics and Communications Engineering (BSECE) March 1996
Polytechnic University of the Philippines
Sta. Mesa Manila
Examination Taken and Passed Date
Licensure Examination for Electronics and November 1996
Communications Engineering ECE # 14010
Manila, Philippines
Career Service Professional Examination August 1995
Manila, Philippines
Affiliation Date
Institute of Electronics & Communication November 1996 up to present
Engineers of the Philippines (IECEP)
Personal Information
Date of Birth - February 13, 1975
Place of Birth - Sta. Maria, Bulacan, Philippines
Sex - Male
Height - 1.62 m
Weight - 70 kg
Civil Status - Married
Religion - Roman Catholic
Citizenship - Filipino