Post Job Free
Sign in

Maintenance Manager

Location:
India
Salary:
9.0 Lacks
Posted:
March 03, 2016

Contact this candidate

Resume:

VERINDER SINGH BARWAL

E-Mail: ********.******@*****.***

Phone: +919*********

EXECUTIVE-Engineering Incharge (Reported to Plant GM)

Objective: Targeting senior level assignments as Manager/Assistant manager in Engineering with an organisation of repute

Industrial Preference: FMCG, PHARMACEUTICLS & COSMETICS

Location Preference: Baddi, Kala Amb, Dehradun & Jammu

PROFILE SUMMARY

A competent professional with nearly 12 years of experience.

ORGANISATIONAL EXPERIENCE

Rexcin Pharmaceuticals Pvt Ltd. (Formally Sun Pharma Ltd) as Executive ( HOD)- Projects

Sep’11 to Present (4 Yrs-5 Month)

oWas joined as a part of Rexcin Pharmaceuticals Pvt Ltd brown field project. Involved in installation & commissioning of complete machinery related to Tablet & Oinment.

Key Result Areas:

oTo ensure smooth, reliable, efficient and safe operations & maintenance of facility / building services (Utilities, Production Machinery).

oResponsible for total engineering activities which includes electrical, mechanical,utilities and instrumentation day to day issues pertaining to maintenance

oCoordinate with internal customers & addressing their day-to- day operational and maintenance requirements.

o Coordinate with internal customers for smooth execution of Projects.

o Efficient handling of complaint management system and tracking.

o Timely updating statutory documents and record keeping

o Record keeping and updating maintenance documentation and ensure implementation through Facility Management team (PM Schedules and records, Shift reports, check-lists, Operating procedures etc.)

oRoutine calibration and validation of water, Compressed air & HVAC system of plant machineries & utility systems.

oSound Technical Knowledge and experience in the areas of Utilities etc.

oPreferably experience and knowledge in the areas of PLC, Automation,

oExposure to modern maintenance management systems.

oTrouble shooting skills.

oInvestigation of failures and closing it by providing CAPA.

oIdentification of training needs for the engineers and putting right person for right job to get maximum out-put

oHandling internal as well as external audits.

oOverall responsible for EHS as per internal EHS procedures.

oPreparation of OPEX and CAPEX.

oEffectively implemented cost effective and energy saving ideas(Energy management).

oManaging inventory to maintain sufficient stock levels to meet customer requirements on time.

Highlights:

oCompleted revamping of Ointment and tablet facilities (Steroid and Non Steroid)

oCompleted the installation of CCTV, ARS System & Door Access System.

oIndependently faced and cleared WHO-GMP audit from engineering side.

oIndependently faced and cleared CQA audit from engineering side.

oInstallation of VFD for Air Compressor which leads to a further energy conservation which leads to a saving of approx. Rs. 3.50 Lacs per year.

oIdentified the cause of failure of CFL and electronic ballast and installed servo controlled voltage stabilizer which reduces the failure of CFL and electronic ballast by 80 %.

PREVIOUS EXPERIENCE

With M/s Twilight Litaka Pharmaceuticals Ltd as Manager

Nov’08 toSep’11 (2 Yrs. – 10 Months)

Key Result Areas:

oWas joined as a part of Twilight Litaka brown field project. Involved in designing, installation & commissioning of complete Electrical, Instrumentation & Automation related activities.

oDone lot of improvement activities to streamline the factory and achieved its rated capacity of production.

.

Highlights:

Handled commissioning & Maintenance of Pharmaceutical Plant (OSD, Powder & Ointment section).

Independently faced and cleared audit from engineering side.

Dealing Automation and control – for controlling temperature of cooling tower water resulted reduction in operation hrs for cooling tower fan.

Timer installed for street lighting and UPS supply for emergency lighting.

Handling different contractors and consultants.

Responsible for All major modifications required for capacity enhancement

With M/s Pidilite Industries Ltd as Executive

May’06 to Oct’08 (2 yrs.-5 months)

Key Result Areas:

oAccountable for whole factory Electrical & Automation Maintenance.

oHandling DCS, PLC system used for controlling of reactor utilities.

oDone lot of improvement activities to streamline the factory and achieved its rated capacity of production by TQM, TPM, 5S & Kaizens implementations.

oWorked on Vessels, Reactors, Jar Filling Line, Pouching filling line, Strapping, Labelling, BOPP Tapping Machine, Shrink Tunnel, Induction sealing Machine, Metal Detector, Shrink Wrap Machine, Packing Conveyers / Table, Inkjet Printer, Cooling conveyor.

Highlights:

Handled overall green field project activities (Installation & commissioning, Planning and execution) of Feviquick Plant.

With M/s Cadbury India Limited as Team Captain (Projects)

Oct’04 to April’06 (1 yrs.-6 Months)

Key Result Areas:

oWas joined as a part of Bournvita green field project. Involved in installation & commissioning of complete Electrical, Instrumentation & Automation related activities.

oLater I was a part of factory maintenance team & act as a lead support of electrical & automation project team.

Done lot of improvement activities to streamline the factory and achieved its rated capacity of production.

oWorked on, Pasteurizer, Ovens, Vessels, Depositor, Packing Machines i.e., VFFS Automatic Machine, Jar Filling Line, Pouching filling line, Powder Filling Machine Check weigher, Air Jet Cleaner, Domino Printer

Highlights:

Successfully established Preventive Maintenance practice in the plant.

Completed HVAC validation documents as per schedule. (IQ,OQ and PQ)

Maintained good record of all drawings and documents.

Faced ISO audit and cleared it successfully.

With M/s Birla Textile Mills as Supervisor

May’03 to Sep’04 (1 yrs-2 months)

Key Result Areas:

oJoined as a Supervisor, got exposure & experience in facility upgrade, technology upgrade, productivity improvement using automation, Maintenance of Utility & packaging lines, process control improvements . Involved in brownfield expansions

oWorked on Power Sub Station, Transformer, DG Sets, Air compressor, Boiler, HVAC, Cooling Tower, Dust Extraction, Exhaust Units, Water Treatment Plant & UPS.

ACADEMIC DETAILS

Graduate Diploma in Electrical Engineering from NIMT.

Diploma in Electrical Engineering from PTU.

12th (Non-Medical), NIOS, Himachal Pradesh

10th from J&k.

GOALS

My short term goal: Want such a platform where i can grow my career along with the organization growth.

My Long term goal: To be one of the reasons for the success of the organization and i want to see organization as a

Bench mark to other organizations

STRENGTH & WEAKNESS

Strengths :My attitude that i like to take challenges that I CAN do it, self-motivated person, self-disciplined I am a good team player as well as has a good ability to lead the team. I can adopt to any kind of environment. I am a good listener and quick learner.

Weakness: I don’t like to say weakness but i like to say scope for improvement that is i won’t leave any task in completely, I believe in myself and my hard work and i want perfection in everything.

KEY ATTRIBUTES

Good communication skills

Ability to coordinate with internal customers and external customers

REASON FOR CHANGE

Better prospective with professional challenges.

For Better Professional & Financial Growth.

Date of Birth: 01st May, 1980

Languages Known: Hindi and English

H Address: Flat No. 311, Dasiy -5, Amravati Apartment, Sai Road,Baddi,Himachal Pradesh - 173205



Contact this candidate