Post Job Free
Sign in

QC Engineer

Location:
Philippines
Posted:
February 27, 2016

Contact this candidate

Resume:

PAMFILO E. ESCALONA JR.

Address: Modesta Village Brgy Sto. Nino, San Mateo, Rizal

Mobile: +63-917-*******

Email: ************@*****.***

SUMMARY OF QUALIFICATIONS:

Registered Mechanical Engineer with eight (8) years work experience in Quality Control Inspection of Boiler and Pressure Vessel, HRSG, Piping, Ducting and Structural Parts of Power, Oil & Gas Industrial Plant in accordance with Codes and Standards.

TECHNICAL AND COMPUTER SKILLS

• Knowledge in MS Office

• Working knowledge with AutoCAD

• Technical background in Mechanical Engineering.

• Background in different engineering international standards/codes such as ASME Code, JIS Standards, and EN Standards.

• Familiar with the fabrication processes of power boilers, pressure vessels and tube bundles for heat recovery steam generator (HRSG).

• Have knowledge in welding process and inspection

• Can operate positive material identification (PMI) machines.

• Ability to work with diversity.

PROFESSIONAL LICENSES/CERTIFICATIONS

Registered Mechanical Engineer, PRC License No. 0064116

EDUCATION

Bachelor of Science in Mechanical Engineering

Golden Gate Colleges, Batangas City, Philippines

SIGNIFICANT WORK EXPERIENCE

COMPANY: MITSUBISHI-HITACHI POWER SYSTEM (PHILIPPINES)

(May 2007 to present)

AG &P SPECIAL ECONOMIC ZONE

San Roque, Bauan, Batangas, Philippines 4201

POSITION: Quality Control Engineer III / Inspector III

DEPARTMENT: Quality Assurance/Quality Control

Job Scope:

• Perform shop and site inspection

• Support and conduct NDE activities such as MT, PT, RT

NDT Qualifications: Level II on PT, MT and VT as per ASNT-TC-1A

Level II on RT and UT as per ISO-9712

Specific Task

• Review customer technical specification and determine inspection and test requirements and applicable codes and standards.

• Cooperatively prepare the process Control List (PCL) with operations department and indicates inspection/hold points and requirement for inspection and test records

• Perform fabrication drawing review prior to conducting inspection and test to determine acceptance criteria and allowable tolerances.

• Review of Mill Test Reports, Purchase Order Specification, Purchase Order and related design documents prior to conducting receiving inspection (physical check) of materials and products.

• Conduct in-process inspection and verify specific requirements for inspection in accordance with contract specification and inspection procedure standard.

• Conduct source inspection on sub-contracted products.

• Review post weld heat treatment (PWHT) charts.

• Witnesses hydrostatic testing and check for possible leakages.

• Conduct final inspection of the product prior to shipment to determine whether all requirements for inspections and testing have been addressed.

• Prepare inspection and test records in accordance with the result of the inspection and testing.

• Issue Nonconformance Report for product that did not meet the requirements of the contract specification and drawings.

PROJECT SITE ASSIGNMENTS

• PAGBILAO THERMAL POWER STATION

Pagbilao, Quezon

Duties and responsibilities:

Conduct risk-based maintenance (RBM) activities.

• SAN LORENZO/STA. RITA POWER STATION (HRSG)

Sta.Rita, Batangas

Duties and responsibilities:

Conduct risk-based maintenance (RBM) activities.

• BHIC/CILACAP PAROJECT STACK AND STRUCTURAL PARTS

BF METAL CORPORATION (Cainta, Rizal)

Febreruary, 2013 ~ July, 2013

Duties and responsibilities:

Conduct fabrication monitoring and final inspection.

• OCG HRSG MODULARIZATION PROJECT

AG&P FABRICATION YARD (San Roque, Bauan, Batangas)

July 28, 2013 ~ April 30, 2014

Duties and responsibilities:

Conduct erection monitoring and final inspection.

• SHI-OGN PROJECT

BOBCOCK-HITACHI KURE (Kure, Hiroshima, Japan)

August 19 ~ 30, 2014

Duties and responsibilities:

Conduct final inspection of Superheater Block.

• TANJUNG BIN POWER PLANT Unit-10(Replacement of Reheater Outlet Header)

SERKAT, JOHOR, MALAYSIA

June 3, 2015 ~ July 11, 2015

Duties and Responsibilities:

Monitor welding process and final inspection of replace header and tube.

• TANJUNG BIN POWER PLANT Unit-30(Replacement of Reheater Outlet Header)

SERKAT, JOHOR, MALAYSIA

September 14, 2015 ~ October 23, 2015

Duties and Responsibilities:

Monitor welding process and final inspection of replace header and tube.

• TANJUNG BIN POWER PLANT Unit-20(Replacement of Reheater Outlet Header)

SERKAT, JOHOR, MALAYSIA

December 20, 2015 ~ January 08, 2016

Duties and Responsibilities:

Monitor welding process and final inspection of replace header and tube.

SEMINARS AND TRAINING ATTENDED:

February 9~22, 2016: RADIOGRAPHIC TESTING-LEVEL 2

Conducted by: PHILIPPINE NUCLEAR RESEARCH INSTITUTE

NDT LABORATORY AND TRAINING CENTER

Diliman, Quezon City

March 16~27, 2015: ULTRASONIC TESTING-LEVEL 2

Conducted by: PHILIPPINE NUCLEAR RESEARCH INSTITUTE

NDT LABORATORY AND TRAINING CENTER

Diliman, Quezon City

JANUARY 9~10, 2015: FORMANSHIP AND VALUES RE-ALIGNMENT SEMINAR

Conducted by: FIL C. SABINO

EL FILIPINO SITIO RESORT DUMUCLAY, BATANGAS CITY

September 12, 2013: Undergone Commissioning and Equipment Training of Positive

Material Identification (PMI) Elvatech, ElvaX Prospector

Conducted by: Mr. Gerald S. Gallardo (CIFRA Marketing

Corporation)

BABCOCK-HITACHI (PHILIPPINES), INC.

San Roque, Bauan, Batangas, Philippines

December, 2004: AUTOCAD LEVEL I

Advance Business Consultancy Center (ABCC)

Batangas City

December 19 ~ 23, 2003: OCCUPATIONAL SAFETY AND HEALTH

Safeline Consultancy, Inc.

BWC-Dole Accreditation No. 1030-021210-0034

Alpha Hotel Batangas City

SEPTEMBER 20, 2003: MECHANICAL SEAL

Conducted By: P.M.E. MANAGER BPC.

Engr. Luis D. Castro

Golden Gate Colleges

MARCH 17, 2003: PRESSURE VESSEL & INSPECTION

Conducted by: Engr. Roberto B. Tonogbanua

Golden Gate Colleges.

MARCH 12, 2003: PSYCHROMETRY AND DRYING SEMINAR

Conducted by: Engr. Rey L. Bacus

Golden Gate Colleges.

PERSONAL DATA

Nationality

:

Filipino

Status

:

Married

Birthday

:

June 18, 1982

Age

:

33

Place of Birth

:

Bauan, Batangas

Sex

:

Male

CHARACTER REFERENCE

• SALDE G. TASARREGLO

QC SECTION MANAGER

MITSUBISHI-HITACHI POWER SYSTEM (PHILIPPINES)

San Roque, Bauan Batangas

090********

• GERONIMO C. DUCUSIN

QA DEPARTMENT MANAGER

MITSUBISHI-HITACHI POWER SYSTEM (PHILIPPINES)

San Roque, Bauan Batangas

091********

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

PAMFILO E. ESCALONA Jr.

Applicant’s Signature



Contact this candidate